Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9401999-10-0606 October 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990930,IAW 10CFR73.71.No Safeguards Events Occurred ML20210R9181999-08-13013 August 1999 Forwards Insp Rept 50-409/99-02 on 990726-28.No Violations Noted ML20210F3651999-07-0909 July 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990630,IAW 10CFR73.71 & LACBWR Security Plan ML20196D5161999-06-21021 June 1999 Discusses Rev 19 to Various Portions of Lacrosse Boiling Water Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).NRC Initial Review of Changes Will Be Subject to Insp to Confirm No Decrease in Effectiveness of Plan ML20207G1991999-06-0303 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20206R9211999-05-10010 May 1999 Forwards Annual Financial Rept & Certified Financial Statements for DPC for Years 1998 & 1997,IAW 10CFR50.71(b). Util Will Forward 1998 Annual Rept as Soon as Rept Is Completed ML20206H6771999-05-0505 May 1999 Forwards Insp Rept 50-409/99-01 on 990414-16.No Violation Noted.Overall Performance During Decommissioning/Safe Storage Activities Was Good ML20206J3671999-04-30030 April 1999 Forwards Rev 13 to QA Program Description, IAW 10CFR50.54(a)(3) & 50.4(b)(7).Changes in Rev 13 Listed ML20205R4261999-04-0808 April 1999 Submits Ltr for Calendar Quarter Ending 990331 IAW 10CFR73.71, Reporting of Safeguards Events. No Safeguards Events Occurred During Quarter ML20204F8291999-03-0909 March 1999 Forwards Annual Rept on Status of Decommissioning Funding for La Crosse Boiling Water Reactor,Iaw 10CFR50.75(f)(1) ML20207C2661999-02-19019 February 1999 Forwards Radioactive Effluent Rept & Radiological Monitoring Rept for 1998 for Lacbwr. Lacbwr,Pcp & ODCM, Encl ML20207A9431999-02-11011 February 1999 Forwards Revised Pages to LACBWR Decommissioning Plan. Each Page with Change Will Have Bar in right-hand Margin to Designate Location of Change ML20198E4371998-12-17017 December 1998 Forwards Insp Rept 50-409/98-05 on 981207-10.No Violations Noted.Activities in Areas of Facility Mgt & Control,Spent Fuel Safety & Radiological Safety Were Examined ML20196A8921998-11-23023 November 1998 Forwards Rev 12 to LACBWR QA Program Description ML20155H4221998-11-0303 November 1998 Ack Receipt of Re Insp Rept 50-409/98-02,in Response to Transmitting Predecisional EC Summary & Exercise of Enforcement Discretion Re Compliance with Maint Rule ML20154K0191998-10-13013 October 1998 Forwards Insp Rept 50-409/98-04 on 980921-22.No Violations Noted ML20154P4351998-10-13013 October 1998 Responds to Re Insp Rept 50-409/98-02 & Refers to C/As Taken to Bring LACBWR Into Compliance with Maint Rule IR 05000409/19980021998-09-17017 September 1998 Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,Identified ML20151Z6501998-09-17017 September 1998 Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,Identified ML20153F7431998-09-14014 September 1998 Informs That Changes Made in Rev 12 Are Adminstrative in Nature & Do Not Result in Reduction in Commitment to Safety & Reliably Operate LACBWR in Safstor Condition,Per 980909 Telcon with NRC ML20237D8861998-08-21021 August 1998 Advises That Rev 18 to Portions of Emergency Plan Do Not Decrease Effectiveness of Plan & Plan Continues to Meet Relevant Stds of 10CFR50.47(b) & Therefore,Nrc Approval Not Required ML20237B9181998-08-17017 August 1998 Forwards Insp Rept 50-409/98-03 on 980811-12.No Violations Were Noted.Insp Included Review of Physical Security Plan for LACBWR ML20236W8111998-08-0303 August 1998 Forwards Summary of Decommissioning Insp Plan for Oct 1998 - Apr 1999,for Info.Plan Will Be Updated Approx Twice Yearly & May Be Revised at Any Time Based on Future Insp Findings, Events & Resource Availability ML20237E2631998-07-15015 July 1998 Forwards Rev 12 to QA Program Description. Page Change Locations Indicated by Bold Bar in right-hand Margin ML20236K7091998-07-0606 July 1998 Forwards Official Transcript Proceedings from 980513,public Meeting Held in Viroqua,Wi on Decommissioning of Lacrosse Boiling Water Reactor.Pen & Ink Changes Made to Original Transcript to Correct Errors & to Clarify Abbreviations ML20249A8331998-06-15015 June 1998 Expresses Appreciation for Support Provided for Recent Meeting Held at Viroqua High School - Middle School Complex on Decommissioning of Lacrosse Boiling Water Reactor ML20248M0461998-06-0909 June 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Viroqua High School on Decommissioning of LACBWR ML20216B9311998-05-0707 May 1998 Forwards Insp Rept 50-409/98-01 on 980420-0423.No Violations Noted ML20217K7121998-03-27027 March 1998 Forwards Rev 18 to LACBWR Emergency Plan.Bar Lines in right- Hand Margins Note Changes.Description of Each Change & Reason for Change Is Included as Cover Pages to Plan Rev ML20203K2041998-02-27027 February 1998 Forwards Summary of Decommissioning Insp Plan for Remainder of FY1998.Plan Will Be Updated Approx Twice Each Yr & May Be Revised Any Time Based on Future Insp Findings,Events, Resource Availabilty,Etc ML20202J4261998-02-16016 February 1998 Forwards Revised LACBWR Decommissioning Plan & Revised LACBWR Initial Site Characterization Survey for Safstor. Both Documents Revised Jan 1998 ML20202J0381998-02-10010 February 1998 Forwards Revised LACBWR Decommissioning Plan. Each Page W/Change Will Have Bar in right-hand Margin to Designate Location of Change ML20199A9351998-01-19019 January 1998 Forwards Insp Rept 50-409/97-01 on 971209-11 & 980107.No Violations Noted.Activities in Areas of Facility Mgt, Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined During Insp ML20199J4111997-11-21021 November 1997 Informs That NRC Regional Oversight Responsibilities for LACBWR Has Been Transferred to Region III Div of Nuclear Matls Safety.Effective 971105 D Nelson Became Region III Point of Contact for Routine LACBWR Insp Matters ML20198R9721997-10-24024 October 1997 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encl Withheld ML20149G1311997-07-10010 July 1997 Submits Ltr Re Quarterly Submittal of Safeguards Events Log for Quarter Ending 970630.No Safeguards Events During Past Quarter ML20148S9131997-07-0303 July 1997 Forwards Annual Financial Rept & Certified Financial Statements for Dairyland Power Cooperative for 1996 & 1995 ML20141H5581997-05-20020 May 1997 Discusses Change in Ofc as of 970520.Project Mgt for Facility BWR Will Be Assumed by Pw Harris.Site Visit Will Be Arranged Convenient to Both Staff & Scheduled Activities ML20141B7521997-05-0909 May 1997 Forwards TS Re Changes to LACBWR Controlling Documents ML20138H8011997-04-29029 April 1997 Forwards Corrected Page to Safety Evaluation,Issued by NRC, by Ltr Dtd 970425.W/o Ltr ML20138B6821997-04-25025 April 1997 Forwards Corrected Page 8 of SE for Amend 69 to La Crosse Boiling Water Reactor License ML20138A6431997-04-15015 April 1997 Forwards Rev 11 to LACBWR QA Program Description ML20137R7651997-04-11011 April 1997 Forwards Safety Evaluation Approving Changes to QAP Description ML20138B7261997-04-10010 April 1997 Submits Ltr for Calendar Quarter Ending 970331,IAW 10CFR73.71 & LACBWR Security Plan ML20134H1841997-01-31031 January 1997 Submits Quarterly Safeguards Event Log Re License DPR-45 ML20133A3721996-12-16016 December 1996 Forwards Rev 17 to LACBWR Emergency Plan ML20132F8601996-12-10010 December 1996 Forwards Revised LACBWR Decommissioning Plan. Each Page W/ Change Will Have Bar in right-hand Margin to Designate Location of Change ML20134M2421996-11-0505 November 1996 Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals ML20149F2461994-08-0202 August 1994 Ack Receipt of 10CFR50.54(a) Submittal Dtd 940620,which Incorporates Changes in Quality Assurance Program Description ML20058P1281993-12-0909 December 1993 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encls Withheld (Ref 10CFR2.790(d)) 1999-08-13
[Table view] Category:NRC TO OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT
MONTHYEARML20151T0921988-08-0808 August 1988 Forwards Safety Evaluation Accepting & Approving Util Revised Onsite Emergency Plan to Reflect Current Status of Reactor ML20235B9241987-09-21021 September 1987 Submits Info Re Status of Licensing Activities in Progress, in Response to 870807 & 20 Memos Concerning Emergency Preparedness.Pursuit of Corrective Actions & Further Upgrading of Offsite Plans Not Warranted ML20236D4051987-07-24024 July 1987 Advises That NRC Deferring Actions Re Emergency Preparedness Until Util Submits Revised Emergency Plan within 3 Months. Action Based on Permanent Shutdown of Plant on 870430 & Request to Amend License to Possess But Not Operate Status 1988-08-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20210R9181999-08-13013 August 1999 Forwards Insp Rept 50-409/99-02 on 990726-28.No Violations Noted ML20196D5161999-06-21021 June 1999 Discusses Rev 19 to Various Portions of Lacrosse Boiling Water Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).NRC Initial Review of Changes Will Be Subject to Insp to Confirm No Decrease in Effectiveness of Plan ML20207G1991999-06-0303 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20206H6771999-05-0505 May 1999 Forwards Insp Rept 50-409/99-01 on 990414-16.No Violation Noted.Overall Performance During Decommissioning/Safe Storage Activities Was Good ML20198E4371998-12-17017 December 1998 Forwards Insp Rept 50-409/98-05 on 981207-10.No Violations Noted.Activities in Areas of Facility Mgt & Control,Spent Fuel Safety & Radiological Safety Were Examined ML20155H4221998-11-0303 November 1998 Ack Receipt of Re Insp Rept 50-409/98-02,in Response to Transmitting Predecisional EC Summary & Exercise of Enforcement Discretion Re Compliance with Maint Rule ML20154K0191998-10-13013 October 1998 Forwards Insp Rept 50-409/98-04 on 980921-22.No Violations Noted IR 05000409/19980021998-09-17017 September 1998 Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,Identified ML20151Z6501998-09-17017 September 1998 Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,Identified ML20237D8861998-08-21021 August 1998 Advises That Rev 18 to Portions of Emergency Plan Do Not Decrease Effectiveness of Plan & Plan Continues to Meet Relevant Stds of 10CFR50.47(b) & Therefore,Nrc Approval Not Required ML20237B9181998-08-17017 August 1998 Forwards Insp Rept 50-409/98-03 on 980811-12.No Violations Were Noted.Insp Included Review of Physical Security Plan for LACBWR ML20236W8111998-08-0303 August 1998 Forwards Summary of Decommissioning Insp Plan for Oct 1998 - Apr 1999,for Info.Plan Will Be Updated Approx Twice Yearly & May Be Revised at Any Time Based on Future Insp Findings, Events & Resource Availability ML20236K7091998-07-0606 July 1998 Forwards Official Transcript Proceedings from 980513,public Meeting Held in Viroqua,Wi on Decommissioning of Lacrosse Boiling Water Reactor.Pen & Ink Changes Made to Original Transcript to Correct Errors & to Clarify Abbreviations ML20249A8331998-06-15015 June 1998 Expresses Appreciation for Support Provided for Recent Meeting Held at Viroqua High School - Middle School Complex on Decommissioning of Lacrosse Boiling Water Reactor ML20248M0461998-06-0909 June 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Viroqua High School on Decommissioning of LACBWR ML20216B9311998-05-0707 May 1998 Forwards Insp Rept 50-409/98-01 on 980420-0423.No Violations Noted ML20203K2041998-02-27027 February 1998 Forwards Summary of Decommissioning Insp Plan for Remainder of FY1998.Plan Will Be Updated Approx Twice Each Yr & May Be Revised Any Time Based on Future Insp Findings,Events, Resource Availabilty,Etc ML20199A9351998-01-19019 January 1998 Forwards Insp Rept 50-409/97-01 on 971209-11 & 980107.No Violations Noted.Activities in Areas of Facility Mgt, Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined During Insp ML20199J4111997-11-21021 November 1997 Informs That NRC Regional Oversight Responsibilities for LACBWR Has Been Transferred to Region III Div of Nuclear Matls Safety.Effective 971105 D Nelson Became Region III Point of Contact for Routine LACBWR Insp Matters ML20141H5581997-05-20020 May 1997 Discusses Change in Ofc as of 970520.Project Mgt for Facility BWR Will Be Assumed by Pw Harris.Site Visit Will Be Arranged Convenient to Both Staff & Scheduled Activities ML20138B6821997-04-25025 April 1997 Forwards Corrected Page 8 of SE for Amend 69 to La Crosse Boiling Water Reactor License ML20137R7651997-04-11011 April 1997 Forwards Safety Evaluation Approving Changes to QAP Description ML20149F2461994-08-0202 August 1994 Ack Receipt of 10CFR50.54(a) Submittal Dtd 940620,which Incorporates Changes in Quality Assurance Program Description ML20058B6791993-11-15015 November 1993 Ack Receipt of 931101 Response to Violations Noted in Insp Rept 50-409/93-17 ML20057G0841993-10-0606 October 1993 Forwards Insp Rept 50-409/93-01 on 930903-24 & Notice of Violation ML20057B3241993-05-0404 May 1993 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App Q Which Are Being Made Available at Pdr.Documents Listed in App R Are Partially Withheld (Ref FOIA Exemption 5) ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20127D3481993-01-13013 January 1993 Forwards Amend 67 to License DPR-45,SE & Request for Fr Publication.Amend Revises TS by Deleting Requirement That Radioactive Effluent Release Rept Be Submitted on Semiannual Basis & Adds Requirement That Rept Be Submitted Annually ML20128P5051992-11-23023 November 1992 Final Response to FOIA Request for Documents Re SECY-87-100 & 870622 Memo from Sj Chilk to V Stello & Wc Parler.Forwards Documents Listed in App a Which Are Being Made Available in PDR ML20141K0261991-08-0707 August 1991 Partial Response to FOIA Request for Documents Re Oyster Creek Nuclear Plant.Forwards App a Documents Which Are Being Made Available in PDR ML20059N6281990-10-0505 October 1990 Forwards Insp Rept 50-409/90-01 on 900917-18.No Violations Noted ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247A7251989-09-0101 September 1989 Forwards Safety Insp 50-409/89-02 on 890801-11.No Violations Noted ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20247K3871989-05-25025 May 1989 Forwards Insp Rept 50-409/89-01 on 890508-11.No Violations Noted ML20245J7131989-04-26026 April 1989 Forwards Amend 65 to License DPR-45,environ Assessment & Finding of No Significant Impact & Safety Evaluation.Amend Revises Tech Specs in Partial Response to 871221,880222,1013 & 890215 Applications ML20247M8271989-03-30030 March 1989 Discusses Licensee Requests for Changes to Requalification Program.Requests Include Extension of Max Time Period of 24 Months for Requalification Cycle to Account for Changes in Outage Schedules & Reorganization of Training Programs ML20196C9621988-12-0505 December 1988 Advises That 881115 Rev 6 to QA Program Consistent W/ Provisions of 10CFR50,App B & Acceptable.Rev Involves Organization Changes,Including Fire Protection Responsibility Now Assigned to Technical Support Engineer ML20206J4931988-11-18018 November 1988 Forwards Physical Security Insp Rept 50-409/88-09 on 881021-26 & 1101.No Violations Noted ML20206K4961988-11-18018 November 1988 Forwards Temporary Exemption from 10CFR50.54(w)(5)(i) Schedular Requirements of Property Insurance Rule Re Insurance Policies That Prioritize Insurance Proceeds for Stabilization & Decontamination After Accident ML20206B5421988-11-0707 November 1988 Ack Receipt of Transmitting Scope & Objectives for 1988 Emergency Preparedness Exercise Scheduled for 881220.Scope & Objectives Acceptable ML20205P1791988-10-31031 October 1988 Advises That 880908 Rev 3 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20154A1521988-08-17017 August 1988 Final Response to FOIA Request for Documents.Forwards Documents Listed in App A.Documents Also Available in Pdr. App B Documents Totally Withheld (Ref FOIA Exemption 5).App C Documents Partially Withheld (Ref FOIA Exemption 5) ML20151T0921988-08-0808 August 1988 Forwards Safety Evaluation Accepting & Approving Util Revised Onsite Emergency Plan to Reflect Current Status of Reactor ML20151R3101988-08-0303 August 1988 Forwards Safety Insp Rept 50-409/88-05 on 880501-0630.No Violations Noted ML20207F8881988-07-27027 July 1988 Forwards Latest Rev of NRC Manual Chapter 0516, Salp. Region III Will Begin Using New Functional Areas Set Forth in Rev for All SALP Rept Periods Which Extend Beyond 880606 Effective Date of Procedure ML20150D7011988-07-0808 July 1988 Forwards Safety Evaluation Supporting Rev 10 to Emergency Plan ML20150D3781988-07-0707 July 1988 Forwards Request for Addl Info Re Proposed Decommissioning Plan & Amend to Tech Specs Per 871221 & 880222 Applications. Response Requested by 880815 ML20150B8211988-06-23023 June 1988 Forwards Draft Rev 5 to ES-601, Administration of NRC Requalification Program Evaluations. W/O Encl 1999-08-13
[Table view] |
Text
____ _
i
?
- / g si g g 4 UNITE D' $TATES
- f. , .y, NUCt.E AR REGULATORY COMMISSION
.) 1 W ASHINGTON. D. C 20655 s
S,, eess
!/ July 24,1987 e
i l
MU;0RANDUM F00: Fichard W. Krimm Att,istant Associate Director l Office of Natural and Technological Hazards Programs Fcdcral Emerg:rcy Management Agency '
FROM: Frank J. Congel, Director Division of Radiation Protection I and Emergency Preparedness I Office cf !!uclear Reactor Regulation I i
SUBJECT:
STATUS OF LACROSSE I. The Lacrosse Boiling Water Reactor at Lacrosse. Wisconsin was perr.anently shut down on April 30, 1987. Removal of all fuel from the reactor was conpleted June 11,1987, in the present plar.t configuration, no new fission products are being produced. The radioactivity of the fission products in the fuel has decayed to approxim6tely 161 of the activity 6t shutdown and is continuing to l decay. The licensee has requested that its license be amended to a possess-but-not-operatestetos(seeenclosure).
The licer.see is expected to submit a revised emergency plan within three mcr.t h s . The NRC staff is deferring any actions relating to emergency prepared-ness until the plan is submitted.
w ~~.pc Frank J. Congel, Director Division of Radiction Protection and Energency Preparedness Office of Nuclear Reactor Regulation
Enclosure:
FR hotice, July 1, 19K/
l CONTACT: Robert A. F.eck. NEP l 492-4 84 X
N 8x73oo437 3 FF -
_ _ . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ __ _ - _ _ - - A.-- - ---
h 24546 F*ler '. Ri;:hte. / Yo! 5 . No.126 / Wed.nesday. July 1.1987 / Notices b , ._ _. --
. Connectkut Yank ee Atomi.1.m. : ternein uncht Jted.%us.mo new proposes to determine that the proposvJ Compa n y. Dod el No. no v
- s '. A- accidents are created. change involve s no sign:ficar.t h ustds Ned Flant.%ddesea Cm 3 Insch e a s:gnificant reduction in a considera tion.
Comaecticut u.svgm oisefety. As stated above. the 1.ocalPubhc Document Room v.wposed cha nges would maintab locotion Van Zoeren Ubtary. Hope Dole e/omendment reque?I f une 1 e mistes structural margins and the total Co!!ege. Housnd. Michigan 4H23.
leakspe (pnetry to secondary) would AttorneYforlicensee' judd L Bacen Descrittoon of omendment tepesc nmem wnhm the acceptable helts of .
The pmposed hcense ame-d+r' will the e ustmg techtucal specification. Esquite. Consumers Pow et Cornpany '
teuse lechrutal Specoce tion Section Thus, the.e chanaes wiu not rtduce the 212 Wut McWen Aunn lackson.
410 D.1 to proude a lens.terrn margm of safety as defeed in any plant Mehlgan 49201.
ecceptance entene for the stcam technical spec $ cation. ARCProject Dierefor:Martm l.
teneistor tubes wnh defects in the ne staff hu reviewed the licensee's Virglio. Actir4 --
rousd rmon(Letiornfourinchee of the tube) and update the basea for th.s deter-madon theI the proposed license (Da5yland Power Cooperative. Docket erneedmentinvolve s no significant critena. This proposed thans* w dl nof b a tards cessiderstions and agnes with Na L Croen 2 3 %'du eNet npair enteria for f'. ..'.. . the beens ee's anA!yees. Accordtagly. the d88CD *" D' '
locakd outside of the rou espans'on staff proposes to determine that the retics The proposed Lcense Arts ef coendmerrt requeste May 22.
propuesd Leenoe amendznent dou cet m; i cmendment w dlalso moddy t)e curnnt involve strnGcast ha.rards riquirecne.nl that 'The plugs.og hrrot for Desedption of amendment requesc-considere cons.
sieeves s LU be determined prict to the leco/PuA! e DocumentRoom The beenece proposes thet Ocense No.
l
' 1957 rtfuehna outage for C1 cle 15." to. /cectsex Rus seu Ubrary.123 Brosd DPR.45 fer the LaCroes e Boums Water
'The ph.asag Lt:ut for stees es wdl be Stn e t. MdSe town. Connecucut C6417. Reacter (LACBWR) be amended to deter::uned pner to the Erst rtfuebeg Attornerfor4cenere: Gerald Carteld. J'0"'"h'~0""4 C" W cutase icUomug slec e (notaUaben." Esquire. Day. Berry and How ard. bcensee stated in a letter dated April 29.
sece. to date, no sleevee have been Counselors a t Law. Cfry Place. Hartford. 1987 that 1.ACBWR would be initelled at the Had;!arn Neck Piant.The Cormechcut 061053499. Per ntnently shut down and n
, proposed beense aenendmer.t wiU also NRC Pmiect Director: Cact! O. deco ==!ssioning plan subruitied to the reuse Techracal Spec $ceben Section Thocas NRC. LACBWR wa s rem a r en'lv shut 410DJ to delete the esclusion of tube ** ' ^
- 31 I E rew 37, cole.n 73 in Sie am Ceneralor 2 tro:n plutus since Ous tube bas Consumen 6A153. Palise desPowerP! Ant. VanCompany.
Butea Docket No, d*833'81 /Jf Prododed80 8/ 8/[iC
, Canty.gcyg u hnsords consideration determinct.;ox
, subseqmt'y bun pluSAed d.;nng a c:ad-ctde shutdown an july.1Lat,. Dole c/cmadment request lune 5. The Commlation ha s provided guidance concerning the appucation el be l Bosro forproposedno sts.=st cent i yn g,jg.op ojempg,pg,,q,,,g. standstds for determining whether e hcterds consio'erotion deterrr'raction in a ccordance with to CDt 50 92. the n,, nq ug engse, a pngou, q g significant huards cocsiderstion e dsts q bcens er ha s troewed the art sched for a change in the supented in senice kilo CFR Part Sa92 by proddes certain proposed chtsan and has (mduded in specden tt4ul.ements for the ste a m ext =ples ($1 FR 7751). One of the g
that they do coi trnolve e su: u5 cant generaion dated September 18.1G84 (50 eumples (ii) of ac' ions not Idely to heurds consideration. m basis (cr this FR 20975).Tt e request would maintain involve a signinc4nthaurdt
" the inten al for such inspe ctions at each considera tion relates to change s that Cb [c$a e ce pro se$ a refuehng bct not to exceed 24 months crinstitute addit:enaltestricticns or l cor.dusion wt.ich is supported by the eacept et e inten al c uld be controls not presently included in the c
Lcenne's determansbons conde este ded to 30 tsonGs provided the licerts e.
pursutal to to CTR 50.52. The proposed 8 H ^ h pmposed actJon to amend Ucense
]
I" " I^'E 8 L^ k" "! * *
- gI'88 No DPR 45 to possese but not operate chanses do colinvolve e as 4 cant n 1 pute ct.
haurde considersbon because these status is more nitrictive than be cAanMs would not; I""l#AP"'d80'IMI/i#ddf S pnsent Ucenot because the present 1 tru otve e syr'uncant inensee la the hot. rds cottsiderotion determinctiom gic*nH Mgg pumn opusbon oq tye .
Inspe tbon nsujts, that show for the p chabd7 or cer.querice> u .,1 prenous ope stAng inten el tbat there ' '##' # E*
acodent pmiously analysed As t'sted w se essentaUy no depadeben of steam " '" **" E " " h ' ' ' "' E #
eberve, since these clanpa eneet the ge ners tor tubea. wuld eneun est the N
- 0 8 ' ' " ' 0 ^8 ' d ' d ^ 0 I )
safety rnarens of Regulatory Cuide probabdity and consequences of the Lk tjy to involve sistficant harards ,
11:1.the p*obabdity of the design beslo sec, dent pmiously evaluated in the considersUon, the Corneussgn ha s l acudents nmains unchanged Since the PSAF.1 e steam tecerster tube rupture. made e proposed determinabon that the j leakage is less man ellowed by Oe are unchaand. The possibdify cf en proposed action does not invoh e a <
emnt ng techrucal specMution the a ccident cet previously analysed is not signMeant huerda consideration.
consequences of the design basis cnsted because tNo change only affects scodents are not impacted Locc/ Public Document Room sieam ptnerator tube integnty, and the locotica Lacrosse Pubhc Libtary. 6M 4
- 2. Create the possibihty of a new er rupture of these tubts has been Main Stre e t, ta Cro s s e. Wiscon sin 54 %1. '
ddlerent ked cf eeadeni fro n env prenously analped Sece the Attorneyforliernsee Kenn Cellen, paenously culwaled No new epte=s inspecbos tWie showed no elgnJ"icant Esquin. Neenan and Holtnnger.1615 L cn de signs are introduced b 9 ~ der adabac tn the previous (nien al. no propnsed thantes Genic r Street. NW. Wa shington. DC 2003S r . cant reducton in the trarTu of ggc pmj,gt 0; rector Herbert N.
f ailure rnode s a re en s ted in additeen, e s fe ty sa ca use d by (Le e rt ee sion.
be plant cperating charactenetiu Ba s e d en the (coegoing, the sta!!
gg g
- _ _ _ - _ _ _ - - - - _ - _ - - - - _ - _ - - _ - - - - - - - - - - - - - - - - - - - - - - - - - -