ML20236D300
| ML20236D300 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/14/1989 |
| From: | Warnick R Office of Nuclear Reactor Regulation |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20236D302 | List: |
| References | |
| NUDOCS 8903230045 | |
| Download: ML20236D300 (4) | |
See also: IR 05000445/1989010
Text
m
.
.
.
.
.
,
.
.
MAR I 41989
In Reply Refer To:
Dockets:
50-445/89-10
50-446/89-10
Mr. W.
J. Cahill
' Executive Vice president
TU Electric
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Dear Mr. Cahill:
This refers to the inspection conducted by Mr.
C.
Hale and an NRC-
consultant during the period February 8 through March 7, 1989, of
activities authorized by NRC Construction Permits CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and 2, and to the discussion of our findings with you and other
)
members of your staff at the conclusion of the inspection.
1
The enclosed copy of our inspection report identifies areas
c
examined during the inspection.
Within these areas, the inspection
j
consisted of selective examination of procedures and representative
l
records, interviews with personnel, and observations by the
j
inspectors.
'
Within the scope of the inspection, no violations or deviations
l
were identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
R.
F. Warnick, Assistant Director
yo
for Inspection Programs
voc
Comanche Peak Project Division
58'
Office of Nuclear Reactor Regulation
N
wo
Enclosure:
ny
Inspection Report 50-445/89-10; 50-446/89-10
lo
oc
cc w/ enclosure:
l$"
See next page
gl
Sa:
RFLU
\\
oc
IP:CPP : iRR
IP:CPPD:NR
AD:IP:CPPD:NRR
f'O
CHale
"
HLivermore
RWarnick
I
'
'
3//S/89
3/ /cl/89
3/J4/89
.
.
.
.
4
o,,
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
o
g
r;
WASHINGTON. D. C. 20665
%*****/
MAR I 41989
i
In Reply Refer To:
'
Dockets:
50-445/89-10
50-446/89-10
Mr. W. J. Cahill
Executive Vice President
TU Electric
400 North Olive Street, Lock Box 81
)
'
Dallas, Texas
75201
l
Dear Mr. Cahill:
l
This refers to the inspection conducted by Mr. C. Hale and an NRC
'
consultant during the period February 8 through March 7, 1989,.of'
activities authorized by NRC Construction Permits CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
(
and 2, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of-procedures and representative
records, interviews with personnel, and observations by the
,
inspectors.
'
l
I
l
Within the scope of the inspection, no violations or deviations
I
were identified.
1
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter and the enclosed inspection-report will be
placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
l
R FLO A
R . lF . Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Nuclear Reactor Regulation
Enclosure:
Inspection Report 50-445/89-10; 50-446/89-10
,
cc w/ enclosure:
See next page
..
.
. .
. ..
.
.
.
.
- - _ _ _ _ _
..
.
.
'
'W. J. Cahill
'.
.
cc w/ enclosure:
l
Roger D. Walker
Nancy H. Williams
Manager, Nuclear Licensing
CYGNA Energy Services
TU Electric
Suite 390
Skyway. Tower
2121 N. California Blvd
I
400 North Olive Street, L.B. 81
Walnut Creek, CA
94596
i
Dallas,.TX- 75201
I
Robert A. Wooldridge, Esq.
Juanita Ellis
Worsham, Forsythe, Sampels
President - CASE
and Wooldridge
1426 South Polk Street
2001 Bryan Tower
Dallas, TX
75224
Suite 2500
Dallas, TX
75201
l
Susan M. Theisen
L
Assistant Attorney General
Mr. Homer C'.-Schmidt
i
Environmental Protection Division
Director of Nuclear
P.O. Box 12548, capitol Station
Services
Austin, TX- 78711-1548
TU Electric
Skyway Tower
Jack R. Newman, Esq.
400 N. Olive St., L.B. 81
Newman & Holtzinger, P.C.
Dallas, TX .75201
1615 L Street, NW, Suite 1000
Washington, D.C.
20036
Mr. J. L. Vota
Westinghouse Electric
GDS Associates, Inc.
.
Corporation
1850 Parkway Place, Suite 720
Post Office Box 355
Marietta, GA
30067-8237
Pittsburgh, PA '15230
Mr. R. W. Ackley
Lanny A. Sinkin
Stone & Webster Engineering
Christic Institute
Corporation Project Mgr.
1324 N. Capitol-Street
20002
l
P. O. Box 1002
..
j
Glen Rose, Texas
76043
David R. Pigott, Esq.
'
Orrick, Herrington & Sutcliffe
Anthony Z. Roisman, Esq.
600 Montgomery Street
i
Suite 600
San Francisco, CA
94111
l
1401 New York Avenue, NW
20005
Steven M. Matthews
Director & Chief Inspector
Ms. Billie Pirner Garde, Esq.
Tx. Dept.of Labor & Standards
Garde Law Office
Boiler Division
104 East Wisconsin Avenue
E.O. Thompson State Off. Bldg.
Appleton, WI
54911
P.O. Box 12157, Capitol Station
78711
Regional Administrator, Region IV
U.S. Nuclear Regulatory Commission
TU Electric
611 Ryan Plaza Drive, Suite 1000
c/o Bethesda Licensing
Arlington, Texas
76011
3 Metro Center, Suite 610
Bethesda, MD
20814
_
. _ _
_ _ _
. - - - _ _ _ _ _ - _ _ -
_
_
_ _ _ _ _ _ _ _ _ _ _ _
-
.
'
W. J. Cahill
.
.
.
cc w/ enclosure:
(continued)
George A. Parker, Chairman
Public Utility Committee
Senior Citizens Alliance of
Tarrant County, Inc.
6048 Wonder Drive
Fort Worth, TX
76133
Joseph F. Fulbright
Fulbright & Jaworski
1301 McKinney Street
Houston, TX
77010
William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert &
Rothwell
suite 700
,
1025 Thomas Jefferson St., NW
20007
Texas Radiation Control
Program Director
Texas Department of Health
1100 West 49th Street
Austin, TX
78756
E.
F. Ottney
P. O. Box 1777
Glen Rose, TX
76043
__