ML20236C945
| ML20236C945 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/13/1989 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8903220385 | |
| Download: ML20236C945 (2) | |
Text
m DUKE Powna GoumNY
-1 P.O.150x 33189 j
CHAltLOTTE. N.C. 28242
')
IIAL fl.TUGNEH.
.rzt.rpnomt '
j
- '"N (7o4) 373-4531 WUULRAE PSUDE3@ON i
_ March 13., 1989 Dbcunent C$ntrol DeSid-l i
U. S. Nuclear Regulatory Commission-
, Washington,.D. C.
20555-
Subject:
Catawba _ Nuclear' Station, Unit i l
Docket No. 50-413 Special Report l
Gentlemen:
l Pursuant to Technical, Specifications 6.9.2 and 3/4.3.3.9, please find attached a
'l Special Report concerning the inoperability of the Unit 1 Channel No. 3 of the Vibration and Loose Parts Monitor System.
Very truly yours,
'l
.d4 ML#6 H. B. Tucker JGT05-D4.les I
Attachment xc:
Mr. S. D. Ebneter Regional Administrator, Region 11 U. S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. W. T. Orders NRC Resident Inspector
}
l 1T l
l 8903220385 890313 PDR ADOCK 05000413 g
PDC f
i
r
_s,____--_-
I s
\\
i SPECIAL REPORT CATAWBA NUCLEAR STATION, UNIT 1 INOPERABILITY OF CHANNEL NO. 3, UPPER HEAI),
j OF THE VIBRATION AND LOOSE PARTS HONITOR SYSTFl4 j
1 March 6, 1989 l
On February 2, 1989 channel No. 3, Upper Head, of.the Unit 1 Vibration and Loose i
Parts Monitor System was dociated inoperable. The reason for the channels
'inoperability is not known.
Channel No. 4 is still operable on the Upper Head so a redundant channel is still in operation. Work Request 446680PS was written to
- Investigate and repair the channel. The repair is scheduled for the next refueling outage. Since the channel has been inoperable more than 30 days, this is reportabic to the NRC pursuant to Technical Specification 3.3.3.9.