Text
c d
October 26, 1987-i Docket No.:
STN 50-457 DISTRIBUTION l
pDocket Files OGC-Bethesdh "NRC'& Local"PDRs Edordan Mr. L. D. Butterfield, Jr.
LLuther JPartlow Nuclear Licensing Manager SSands RRamirez J
Commonwealth Edison Company ACRS(10)
PDIII-2 Plant File l
Post Office Box 767 i
Chicago, Illinois 60690 i
Dear Mr. Butterfield:
1
SUBJECT:
DEVIATION TO THE SCHEDULE FOR SUBMITTAL 0F STARTUP TESTS AS DELINATED IN APPENDIX B 0F REFERENCE-(A).
Reference (a):
Regulatory Guide 1.68, Revision 2, dated August,1978.
Reference (b):
Letter from S. C. Hunsader, Licensing Administrator for Braidwood Station, Commonwealth Edison Company, to Mr.
Thomas E. Murley, Director, Office of Nuclear Reactor 1
Regulation, U.S. Nuclear Regulatory Commission, Dated September 10, 1987.
1 In your submittal (reference b), you have proposed to divide the startup test procedures for Braidwood Station Unit 2 into two parts. Those which are scheduled to be completed at low power (less than 5%) are to be
[
submitted to Region III 60 days prior to receipt of the low power license.
Those startup test procedures which are scheduled to be executed during the power ascension program (greater than 5%) are to be submitted 60 days prior to receipt of the full power license.
I The NRC conducts a series of inspections of the initial test program begining before preoperational testing and continuing throughout startup.
l These inspections are intended to determine whether the applicant's test I
programs, as described in the FSAR, are adequately implemented and whether the results of these tests demonstrate that the plant, personnel, and procedures are ready for safe uperation.
After discussions with NRC staff f rom NRR and the Region III Office and l
reviewing the request for a deviation for Braidwood Station to the j
schedule for submittal of startup tests as prescribed in Appendix B of l
I l
l l
l l
8710270403 B71026 i
PDR ADOCK 05000457 i
A PDR j
L
_. October 26, 1987 Regulatory Guide 1.68, the staff finds the proposed schedule as delinated inreference(b)(enclosed) acceptable.
Sincerely, 13 l Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special' Projects
Enclosure:
As stated cc w/ enclosure:
See next page l
1 l
l l
l l
l
(
PDIII-2:PM PDIII-2:LA PDIk' A PD SSands:bj LLuther
)
irez Offi erl 10/.73/87 10/.D#87 10/j6/87 10/u/87 l
l I
l
Mr. L. D. Butterfield, Jr.
Braidwood Station Commonwealth Edison Company Units 1 and 2 CC:
Mr. William Kortier Ms. Lorraine Creek Atomic Power Distribution Route 1, Box 182 Westinghouse Electric Corporation Manteno, Illinois 60950 Post Office Box 355 Pittsburgh, Pennsylvania 15230 Douglass Cassel, Esq.
109 N. Dearborn Street Joseph Gallo, Esq.
Chicago, Illinois 60602 Isham, Lincoln & Beale 1150 Connecticut Ave., N. W.
Elena Z. Kezelis, Esq.
Isham, Lincoln & Beale Suite 1100 Washington, D. C. 20036 Three First National Plaza Suite 5200 C. Allen Bock, Esq.
Chicago, Illinois 60602 Post Offices Box 342 Urbana, Illinois 61801 Mr. Charles D. Jones, Director Illinois Emergency Services Ms. Bridget Little Rorem and Disaster Agency Appleseed Coordinator 110 East Admas Street 117 North Linden Street Springfield, Illinois 62706 Essex, Illinois 60935 Michael Miller, Esq.
)
Mr. Edward R. Crass Isham, Lincoln & Beale
}
Nuclear Safeguards and One First Nationa'l Plaza 3
Licensing Division 42nd Floor Sargent & Lundy Engineers Chicago, Illinois 60603 55 East Monroe Street Chicago, Illinois 60603 George L. Edgar Newman & Holtzinger, P.C.
V. S. Nuclear Regulatory Commission 1615 L Street, N.W.
Resident Inspectors Office Washington, D.C.
20036
)
RR#1, Box 79 Braceville, Illinois 60407 Attorney General 500 South 2nd Street o
Regional Administrator, Region III Springfield, Illinois 62701 U. S. Nuclear Regulatory Commission i
799 Roosevelt Road EIS Review Coorindator I
Glen Ellyn, Illinois 60137 EPA Region V 230 S. Dearborn Street i
Chairman Chicago, Illinois 60604 l
Will County Board of Supervisors l
Will County Board Courthouse Joliet, Illinois 60434
b
/
Comm:nwrith Edison s
fO J. ' One First National Plaza, Chicago, Illinois
' ~
b.
' C 7 Address Reply to: Post Offce Box 767
\\_/ Chicago, Illinois 00690 0767 September 10, 1987 Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Vashington, DC 20555
Subject:
Braidwood Station Unit 2 Request for Schedular Relief for Submittal of Unit 2 Startup Tests NRC Docket No. 50-457 Reference (a): Regulatory Guide 1.68, Revision 2, dated August, 1978
Dear Mr. Murley:
The purpose of this letter is to request approval for a deviation to the schedule for submittal of startup tests as delineated in Appendix.B of Reference (a), which states in part:
"For the NRC to implement this inspection program, the applicant should have copies of the test procedures available for examination by the NRC regional personnel approximately 60 days prior to the scheduled performance of the preoperational tests, and, not less than 60 days prior to the scheduled fuel loading date, copies of procedures for fuel loading, initial startup tesitng, and supporting activities. Drafts of these procedures should be made available as early as practical."
To help minimize the impact on Braidwood Station resources and yet, provide the required test procedures in a timely manner,in lieu of the above, Commonwealth Edison proposes the following submittal schedule:
a.
Braidwood Station approved copies of all startup test procedures which are scheduled to be executed at less than 5% power vill be provided to NRC Region III personnel at least 60 days prior to receipt of a low power (less than 5% power) license for Unit 2.
b.
Braidwood Station approved copies of all startup test procedures which are scheduled to be performed during the power ascension program (greater than 5% power) will be provided to NRC Region III I
personnel at least 60 days prior to receipt of a full power license for Unit 2.
I SpN%M MP i
A___-__.
T.E. Murley September 10, 1987
\\
This revised schedule will allow, as much as practicable, for the incorporation of Braidwood Unit I testing experience into the Braidwood Unit 2 tests. This schedule should also serve to enhance the overall execution of the Braidwood Unit 2 testing program.
In addition, thin schedula will help minimize the impact on Station resources during the period when the Unit 1 and j
Unit 2 testing programs overlap.
This request was discussed with NRC Staff from NRR and Region III on September 9, 1987, and was generally found to be acceptable.
Your review and formal acceptance of the proposed schedule is requested.
If there are any questions concerning the above, please direct them to this office.
Very truly yours, j
S. C. Hunsader Nuclear Licensing Administrator f
im
/
cc:
B. Sands - NRR Braidwood Resident Inspector i
I i
t
,I l
[
F 3529K j
/
9
<