Summarizes Work Performed During Refuel Outage,Per NRC Bulletin 88-008,Suppls 1 & 2.Alternate Charging & Auxiliary Spray Lines for Plant to Be Installed During 1988 Refueling Outage
ML20236C747
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 03/14/1989
From: Richter M
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-008, IEB-88-8, NUDOCS 8903220298
Download: ML20236C747 (3)


Text

m q

/7 Comm::nw;cith Edison

1). One First National Plaza, Chicaco, Illinois

, _,([ O.} Address Reply to: Post Office Box 767 c

Chicago, Illinois 60690 March 14, 1989 U.S. Nuclent Regulatory Commission Attn Document Control Desk Washington, D.C.

20555

Subject:

Zion Station Unit 2 Supplemental Response to NRC Bulletin 88-08 and 88-08, Supplements 1 and 2 NRC Docket No. 50-304

References:

(a) NRC Bulletin 88-08, dated June 22, 1988.

(b) NRC Bulletin 88-08, Supplement 1, dated June 24, 1988.

(c) NRC Bulletin 88-08,. Supplement 2, dated August 4, 1988.

(d) W. Morgan letter to U.S. NRC, dated October 3, 1988.

Dear Sir References (a), (b), and (c) requested that licensees (1) review the reactor coolant systems (RCSs) to identify any connected, unisolable piping that could be subjected to temperature distributions which would result in i

unacceptable thermal stresses and (2) take action, where such piping is j

identified, to ensure that the piping will not be subjected to unacceptable thermal stresses. Reference (d) provided Commonwealth Edison's (Edison's) inh.lal response to References (a), (b), and (c).

Reference (d), in response to Actlon 2 of Reference (a), indicat'ed that sections of the Alternate Charging line (2RC065), Auxiliary Spray line (2RC145) and Safety Injection (SI) Cold Leg Injection lines (2RC005, 2RC038, 2RC071, 2RC079) for Zion Unit 2 would be examined during the 1988 refueling-outage.

In addition, in response to Action 3 of Reference (a), Reference (d) indicated that temperature monitoring devices would also be installed on the Alternate Charging and Auxiliary Spray lines for Zion Unit 2 during the 1988-refueling outage. This letter reports on the work performed during the Zion Unit 2 refuel outage (19c8).

The scope of the piping examinations for Action 2 included volumetric examination of all piping base metal and fittings to the extent achievable by the ultrasonic method, and surface examination of all socket welds by the liquid penetrant method. No indications were identifled ultrasonically, l

however, two (2) recordable indications were identified by the surface I

examinations.

The recordable indications were on the elbow boss by' weld 7 and the elbow boss by weld 8 of the SI Cold Leg Injection line 2RC038 (see attachment for configuration of line 2RC038). These indications were observed-to be minor surface blemishes and were removed. Upon removal of the indications, the areas of interest were re-examined with acceptable results.

h This completes the work on Zion Unit 2 for Action 2.

I\\

8903220298 890314 PDR ADOCK 05000304 PDC Q

o

k 1

L

.As indicated-in Reference (d) for Action 3,s temperature monitoring j

l devices were installed on the Alternate Charging line and on'the Auxiliary..

l l

Spray line for-Unit 2'in order:to identify the temperature profiles downstream I

of'the isolation valves (2AOV-VC8169 and 2AOV-VC8146). At this' time,

-temperature data, which is being obtained upon each unit startup.(from. cold shutdown) and after manipulation of the subject valves, has indicated that no fatigue due to thermal cyclingels occurring.

For the Unit 2 SI Cold Leg Injection lines, a procedure has been implemented to identify any leakage past the boron injection tank (BIT) bypass-i valve'(2SI8925) or the DIT outlet isolation valves (2MOV-SI8801A and l

2MOV-SI8801B). This procedure, which is performed on each unit startup1(from

~

cold shutdown) and after manipulation of the subject valves, has revealed that no valve leakage is occurring. As previously mentioned in Reference (d), the-leakage monitoring procedure'is considered an interim measure.since the BIT i

removal modification is-scheduled to remove the' BIT bypass valve and the' BIT outlet isolation valves.

Removal of the BIT. bypass line and valve is ocheduled to'be performed during the next refueling outage.for-Unit 2 (Spring 1990)..During the following Unit 2 refueling outage (Fall 1991),' the BIT:

removal modification is scheduled to remove the BIT outlet. isolation valves and to provide'a mechanism for detection and removal of any leakage past the Charging System isolation valves (2MOV-SI8803A and 2MOV-SI8803B).

In accordance with Reference-(a),: Edison will notify' the NRC'upon' completion of the BIT removal modification.

To the best of my knowledge and belief, the statements contained.

above are true and correct.

In some respect these statements are not based on my personal knowledge, but obtained information furnished by other Commonwealth Edison employees, contractor employees, and consultants.

Such information has been reviewed in accordance with company practice, and I believe it to be reliable.

Please address any questions that you or your staff may have concerning this response to this office.

Respectfully,

[

[

M.

H.

Richter l

Nuclear Licensing Administrator Attachment

]

rf/5580K8 1

cc:

A.D. Davis Resident Inspector - Z 7::::::

Subscribed and Swgrp to j

"0FFICIAL SEAL" _

j befgremet/(sis _[f l

L day L

LELIA F. MAYO of IYOAzt

, 1989 hNotaryPublic.StateofIllinoislI

/

/

(

My Commission Empires 4/25/93 l

}/\\g Q. ],\\ f)L{p 4

l

{

Notary public

[)'

l l

L.OOP 2 if SIS BIT LINE 1

1 1/2" Sch. 160/.281"T I

system s2 gg subsystem 2sI-10-3,232-14 RC 038-l/2 g

%ecTTonJ o 40 A?trA 4 og )

89008 REF.-1-4200

' d 10M o 42.

13 o 43 4

3C ut on-i!'

'I u3

]

u d

l o >

.4 XogM we

'8 "8 X=s g

n to o te

,j as rs usi 21 0-l 19 ne ts o n

- ac c58I*

I h

11 A

ss u

wis-1 86 i

Hn Js l

f3 l' o we M4 4

r=

  • A l

l l

Modification 1987-Valve 89008 Replaced and Welds 40 thru 43 Added (Zion Units 1 & 2)