Text
.
_
._.
.
.
T '"
4 '
MAR - 91'989 -
)
In Reply Refer To:
I
-
Docket:
50-482/89-06
,
'
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers.
President and Ch_ief Executive Officer
i
i
P.O. Box 411
'
Burlington, Kansas 66839
Gentlemen:
,
l
This refers to the inspection conducted by Mr.'Nemen M. Terc of this office.
.
during the period January 30 through February 2,1989, of activities
authorized by NRC Operating License NPF-42 for the Wolf Creek Generating
1
Station and to the discussion of our findings with you and other. members of
.
your staff at the conclusion of the inspection.
q
- 1
Areas examined during the inspection included a review of.the operational
status of the emergency. preparedness program.
In particular, the NRC inspector
reviewed your revised Emergency Action Levels procedure. Within'these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
]
inspector.
The inspection findings are documented in the enclosed inspection
'
report.
Within the scope of this inspection, no violations or deviations were
i
p
identified.
'j
We have also examined actions you.have taken with regard.to previously
)
identified inspection findings. The status of these items is identified in.
paragraph 2 of the enclosed report.
I
,
Should you have any questions concerning this inspection, we will be pleased-to
discuss them with you.
Sincerely,-
'
original Sigacil By.
1
A. B. Beacli
'!
L. J. Callan, Director
H
,
i
Division of Reactor Projects
,
Enclosure:
Appendix - NRC Inspection Report
50-482/89-06
c 's on next page:
h
A
I
,
d
I'
- RPB
C:Sd
C:RPB /
C:PS/D F
40RI a
l
N
c/tw
RJEvdWtt
BMurray
EJHoller-
JB4 lan -
)
b/py/89
3 /1 /89
q/89
3 /9 /89
-
/
3 q /89
l
,
0903220214 890309
]
1
l
ADOCK 05000402
3
G
PNU
Y.
,
.
.
,
.
.
.
.
I
Wol'f Creek Nuclear Operating Corporation
-2-
,
cc w/enlosure:
Wolf Creek Nuclear Operating Corporation
ATTN: Otto Maynard, Manager
,
of Licensing
{
P.O. Box 411
l4
f
Burlington, Kansas 66839
'1
Wolf Creek Nuclear Operating Corporation.
l
!
ATTNf Gary Boyer, Plant Manager
-
P.O. Box 411
l
Burlington, Kansas 66839
.i
Kansas Corporation Commission
4
ATTN:
Robert D. Elliott, Chief Engineer
Fourth Floor, Docking State Office Building
<
Topeka, Kansas 56612-1571
i
Kansas Radiation Control Program Director
bec to DMB (IE35)
bec distrib. by RIV:
.I
- RRI
- R. D. Martin, RA
- Section Chief (DRP/D)
- DRP
- RPB-DRSS
R. DeFayette, RIII
- RIV File
SRI, Callaway, RIII
- MIS System
- RSTS Operator
- Project Engineer, DRP/0
Lisa Shea, RM/ALF
- DRS
- D. V. Pickett, NRR Project Manager (MS:
13-D-18).
- R. Bangart
- R. Hall
- B. Murray
- J. Everett
- N. Terc
- w/766
i