ML20236C487
| ML20236C487 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/21/1987 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| SL-3444C, NUDOCS 8710270218 | |
| Download: ML20236C487 (6) | |
Text
_ _ _ _ _ _.
.i Georgia Fbwer Company
' 333 Piedmont Avenue.
Atlanta, Georgia 30308 Telephone 404 526-6526
' Mailing Address:.
I Post office Box 4545 i
' " ~ ' "
h Atlanta, Georgia 30302 Georgia Power L T. Gucwa.
- y$ Q G$
the southern c!ccinc system l
Manager Nuclear Safety 351.00T 21 A D 19 SL-3444c 1195C X7GJ17-H200 j
October 21, 1987 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C.
20555
-l l
PLANT HATCH - UNITS 1, 2 l
NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 1
OUTSTANDING LICENSING SUBMITTALS l
Gentlemen:
Enclosed,.for your information and use, please find updated listings of those items of correspondence with the NRC to which a written response l
is expected.
Enclosure 1,
tabulated chronologically by Georgia Power Company's submittal
- date, lists ittes which cro ready 'for closure.
! prioritizes the eight most significant outstanding submittals in terms of value to Georgia Power Company. is a listing of those,itemt requiring submittal of additional information by Georgia j
Power.
Georgia Power is prepared to discuss modifications to these status reports and will. promptly address any questions you may have regarding these licensing issues.
Sincerely, 871027021807[PDRh PDR ADOCK O P
g -L. T. Gucwa JCJ/lc
Enclosures:
1.-
Outstanding Licensing Submittals Requiring NRC Action 2.
Outstanding Licensing Submittals Prioritized List 3.
Outstanding Licensing Submittals Requiring Additional Information c:
(see next page) g
.u
- e, Georgia Power b U. S.~ Nuclear Regulatory Commission October 21, 1987 ~
Page Two c: Georaia Power Company
'l Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations
.Mr. J. T. Beckham, Jr., Vice President - Plant. Hatch G0-NORMS
'1 U. S. Nuclear 1Reaultlorv Commission. Washinaton. D. C.
Mr. L. P. Crocker, Licensing Project Manager - Hatch
-U. S. Nuclear Reaulatory Commission. Reaion'II
'j Dr. J. N. Grace,. Regional Administrator Mr. P. Holmes-Ray, Senior Resident. Inspector - Hatch l
l
(
L-:
l l
l-J 1195C
"'"5
i j
Georgia Power d ENCLOSURE 1 PLANT HATCH - UNITS 1, 2 NRC DOCKETS'50-321, 50-366 i
OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS REOUIRING NRC ACTIOR L; TTER HATCH DATI UR11 SUBJECT Key 0 -. APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE f
C-NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N-ITEM ADDED SINCE LAST REPORT 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC l
SPECTRA BROADENING 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
DELETE REQUIREMENT FOR HYDR 0 GEN RECOMBINERS 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTDOWN PANELS FROM SAID PANELS I
11/14/86 321,366
RESPONSE
TO VERBAL REQUEST FOR ADDITIONAL INFORMATION - CABLE TRAY SUPPORTS 4
12/23/86 321,366 DETAILED CONTROL ROOM DESIGN REVIEW 02/13/87 321,366 REQUEST TO REVISE REPORTING REQUIREMENT TECHNICAL SPECIFICATIONS TO FIT LICENSEE EVENT REPORT REQUIREMENTS 03/04/87 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SOIL l
ANALYSIS t
1195C El-1 10/21/87 SL-3444 I
u __ _____ 7""5
}
m L
lGeo_rjia PowerI
' ENCLOSURE 1(Continued)-
OUTSTANDING-LICENSING SUBMITTALS
' LETTER
. HATCH' DAIE UNII SUBJECT ~
-03/20/87 366-CHANGES TO TECHNICAL' SPECIFICATIONS - HYDROGEN-
~ HATER CHEMISTRY 05/01/87' 321,366
. PROPOSED CH;d1GE-TO TECHNICAL; SPECIFICATIONS -
GASE0US EFFLUENT' RELEASE POINTS t
7/13/87-321.
PROPOSED CHANGE -T0 " TECHNICAL SPECIFICATIONS
.l ELECTRICAL SURVEILLANCE INTERVAL l
9/22/87 366-
-N,0 PROPOSED' CHANGE-T0 TECHNICAL 1 SPECIFICATIONS -
STANDBY-LIQUID CONTROLz SYSTEM ' OPERATION. USING'
)
ENRICHED S0DIUM PENTABORATE' i
q
- 10/08/87 321,36i N
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
l FUEL THERMAL LIliITS AND ECCS-REQUIREMENTS 1
a L
1195C El-2 10/21/87 SL-3444 twni '
a
+.
k p
Georgia PowerI
)
i ENCLOSURE 2 PLANT HATCH - UNITS 1, 2:
NRC DOCKETS 50-321, 50-366 OPERATING LICENSES'DPR-57, NPF-5 l..
OUTSTANDING LICENSING SUBMITTALS PRIORITIZED LIST l
REASON SUBJECT FOR-
' PRIORITY-y 1.
Operational Hardships PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
?
GASE0US EFFLUENT RELEASE POINTS 2.
Hardware Installed.
CHANGES TO TECHNICAL SPECIFICATIONS '- HYDROGEN 3
-HATER CHEMISTRY-i 3.
Piping Replaced with.
REQUEST TO RESCIND CONFIRMATORY ORDER ON Nuclear Grade Material REACTOR COOLANT ~ SYSTEM STAINLESS STEEL PIPE 4.
Unnecessary Plant PROPOSED CHANGE'TO TECHNICAL SPECIFICATIONS -
Shutdown ELECTRICAL SURVEILLANCE INTERVAL 5.
Agreements with Union PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
Iraminent SiiIFT OVERTIME REQUIREMENTS 6.
NRC'SER has been issued PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
on Generic Topical EQUALIZING REACTOR PROTECTION SYSTEM i
Report SPECIFICATIONS BETHEEN UNITS i
7.
Preclude Potential CHANGE TO TECHNICAL SPECIFICATIONS -
Future Problems RIVER LEVEL
]
8.
System Management
. PROPOSED LICENSE EXTENSION TO 40 YEARS FROM Planning OPERATING LICENSE VICE CONSTRUCTION PERMIT j
1 1195C E2-1 10/21/87 SL-3444 l
em.
I
q p
q
)
l.
LGeorgla Power 1 1
1 ENCLOSURE 3
.i PLANT HATCH - UNITS l, 2-
. NRC DOCKETS 50-321, 50-366-o 0PERATING LICENSES DPR-57; NPF. OUTSTANDING LICENSING SUBMITTALS-RE0UIRING ADDITIONAL INFORMATION-LETTER
' HATCH
-o DAIE UMLI -
SUBJECT 01/10/85 366 REQUEST 1TO RESCIND CONFIRMATORY ORDER ON REACTORL COOLANT SYSTEM STAINLESS' STEEL-PIPE.
06/25/85; 321,366 PROPOSED CHANGES.T0 IST PROGRAM
-07/17/86 321',366 REQUEST FOR ADDITIONAL. INFORMATION 'REGARDING-l TFCHNICAL SPECIFICATION
~ AMENDMENT T0. GASE0US i
EFFLUENT RELEASE POINTS id l
i i
1195C E3-1 10/21/87 i
SL-3444
_ _ _ _ _5*9