Forwards Ref Matl Requirements for Requalification Program Evaluation to Enable NRC Examiner to Adequately Prepare for Visit to Facility to Administer Prepared Written Exams & Operating Tests During Wk of 871019
ML20236C333
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/23/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
References
NUDOCS 8707300017
Download: ML20236C333 (3)


Text

_ _ - _ _ _ - _ - . _ - - _

., , . N JUL 2 319g7

-Docket No. 50-346- j Toledo Edison Company: i ATTN: Mr. Donald Shelton  !

Vice President I Nuclear Edison Plaza 300 Madison Avenue'

. Toledo, OH 43652

Dear Mr. Shelton:

l

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION In' a telephone conversation between Mr. R. Simpkins, Davis-Besse Training-Manager and Mr. T. Reidinger, Region III Operator Licensing Examiner, arrangements were made for an evaluation of the.requalification program at the DEvili-Besse Nuclear Power Station. The evaluation visit is scheduled for  ;

the week of October 19, .1987.

For this visit, the NRC examiner will administer NRC prepared written  !

examinations.and operating tests. When the NRC. examiner arrives at the site,

.he will meet with the appropriate facility personnel to review the schedule

.for these examinations. For the examiner to adequately prepare for this

. visit, it will be'necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," at least 60 days. prior,to the examination date. Mr. Simpkins has been advised of our reference material--

requirements and where'they are to be sent.

This request for information was approved by the Office of Management and.

Budget under Clearance Number 3150-0101,.which expires-May 31, 1989.

LComments'on burden'and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.~C. 20503.

Thank you for your consideration in this matter. If you have any questions ]

on the evaluation process, please contact T. D.. Reidinger at (312) 790-5551.

Sincerely, j Charles W. Hehl, Chief i Operations Branch i

~

Enclosure:

As stated ~

See Attached Distribution L RIII- RIII III fW CGW Re1dinger/nma Burdick eh I

-8707300017 870723 "1 QR ADOCK 050 6 l gj

t. ,

i  :. . .. ', - % L H

M 2 8 '1997 Toledo Edison' Company. ~2~

l.

l.

Distribution cc w/ enclosure:

L'. Storz,.: Plant Manager.1 DCS/RSB -(RIDS)

Licensing Fee Management Branch

"  ; Resident Inspector, RIII; Haroid W.- Kohn,10hio.EPAL ~

James W.L Harris',: State. of Ohio Robert. M. - Quilli n ,' _0hio

. Department of Health' State of Ohio,1 Public

. Utilities Commission

'R;' Simpkins, Training -Supervisor cc w/o enclosure:

A. DeAgaziv, Project Manager, NRR J 'J. N. Hannon, Branch Chief, OLB-R.-DeFayette, Section Chief, DRP

.R.'W. Cooper, NRR F. Jaggar, INEL (EG&G) .

1

+

p

..A ENCLOSURE 1 1

REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM EVALUATION

1. An index of administrative, operating, abnormal and emergency procedures.
2. All-administrative procedures (as applicable to reactor operation or safety)
3. All integrated plant procedures (normal or general operating procedures) 4.. Emergency procedures (emergency instructions, abnormal, or special

'l procedures) j i

Standingorders(importantorderswhicharesafety-relatedtoandmay 5.

supersede the regular procedures) (

6. Fuel-handling and core-loading procedures (initial core-loading jl procedure,whenappropriate) l
7. Annunciatorprocedures(alarmprocedures,includingsetpoints)
8. . Radiation protection manual (radiation control manual or procedures)
9. Emergency plan
10. Technical Specification
11. Plant technical data (curve) book
12. Lessonplans(trainingmanuals,learningobjec'tives,plantorientation manual, systems descriptions) '
13. Systems opera. ting procedures
14. Piping and instrumentation diagrams, electrical single-line diagrams, or d flow diagrams i
15. Copies of facility R0 and SR0 requalification examinations administered {

ouring the past 2 years ]

All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not i be acceptable. All procedures and reference material should be bound or in '

the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.