Confirms 871014 Telcon Re 871022 Enforcement Conference at Plant to Discuss Failure to Request Amend for Cavitating Venturi Installation for Four motor-driven Auxiliary Feedwater Pumps.Proposed Meeting Agenda & Notice Encl
ML20236C321
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/16/1987
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20236C323 List:
References
NUDOCS 8710270096
Download: ML20236C321 (3)


Text

- - _ _ _ _ _ _ _ - _ _ - _ _ - _ _ - - -

OCT 161987 USNRC-DS

}

M81 OCT 2b A 9140 1

Tennessee. Valley Authority ATTN:

Mr. S. A. White Manager of. Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

)

Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING - SEQUOYAH - DOCKET NOS. 50-327 AND 328 This confirms the telephone conversation between Mr. John LaPoint of your staff and Mr. Frank McCoy of my staff on October 14, 1987, concerning an enforcement conference to' be conducted at the Sequoyah site, on October 22, 1987, at 9:00 a.m.

We requested this conference to discuss the apparent failure to meet the requirements of 10 CFR 50.59 such that a required license l

amendment was not sought in support of the cavitating venturi installation associated with all four motor driven auxiliary feedwater pumps.

A proposed meeting agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, DRIGINAL SIGNED BV l

KENNETH P. BARR hGaryG.Zech,AssistantDirector for Inspection Programs l

5 b

TVA Projects Division Office of Special Projects l

Enclosure:

Proposed Meeting Agenda cc w/ enc 1:

H. L. Abercrombie, Site Director Sequoyah Nuclear Plant J. A. Kirkebo, Director, Nuclear Engineering l

R. L. Gridley, Director l

Nuclear Safety and Licensing M. R. Harding, Site LicensinD l

Manager T. A. Ippolito, TVA Nuclear Regulatory Consultant bcc w/ enc 1:

(See page 2) 8710270096 871016 PDR ADOCK 05000327 P

PDR s\\s(

1

L..

Tennessee Valley Authority

'2 00T I 61987 i

i-i bec.w/ enc 1:

l J. G. Keppler, OSP l

S. D.'Ebneter, OSP J._ A. Zwolinski, OSP -

B. D. Liaw, OSP' S. D. Richardson, OSP K. P. Barr, OSP/RII F. McCoy, OSP/RII

'R. Carroll, OSP/RII J. Brady, OSP/RII-(2 copies)

NRC Resident Inspector NRC Document Control Desk State of Tennessee I

1 c-I 10/g/87 10 87 10/6/87 l

)

m__.

)

3 1

ENCLOSURE.

PROPOSED MEETING AGENDA f

Tennnessee Valley Authority October 22, 1987 I.

Opening Remarks NRC II.

Issue of Concern:

.TVA/NRC TVA's apparent failure to meet the requirements of 1

10 CFR 50.59 such that a required license amendment (Technical Specification change) was not sought in support of the cavitating venturi installation associated with all four motor driven auxiliary feed-water pumps.

III.