ML20236C039

From kanterella
Jump to navigation Jump to search
Forwards SALP Rept 50-341/89-01 for Apr-Dec 1988.Overall Performance Satisfactory.Surveillance Improved from Category 3 to Category 2.Meeting Scheduled on 890329 to Discuss SALP Findings
ML20236C039
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/13/1989
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20236C043 List:
References
NUDOCS 8903210452
Download: ML20236C039 (3)


See also: IR 05000341/1989001

Text

4

f

patog

U ITED STATES

E

k

NUCLEAR REGULATORY COMMISSION

J

[

7,

REGION lH '

E

-

g-

799 ROOSEVELT ROAD

t,

OLEN ELLYN. ILLINotS 40137

.....

MAR 131989

'

Docket No. 50-341

l

The Detroit Edison Company

ATTN:

B. Ralph Sylvia

Senior Vice President

Nuclear Operations

,

6400 North Dixie Highway

';

l

Newport, MI 48166

Gentlemen:

Enclosed for your review, prior to our scheduled meeting on March 29, 1989, is

the SALP 10 Board Report for Ferm.i 2, covering the period April 1,1988,

through December 31, 1988.

In accordance with NRC policy, I have reviewed the SALP Board Assessment and

concur with their ratings. Overall, your performance was found to be satisfactory.

Operations improved from a Category 3 rating to Category 2, indicating that the

operating shifts are now consistently operating the facility within the constraints

of the operating license. Additionally, Surveillance improved from a Category 3

rating to Category 2, reflecting an improved enforcement history and the

successful implementation of the Technical Specification Improvement Program.

Maintenance continued to be rated as Category 3.

Many licensee actions have

been initiated in this area and some improvement has been noted as a result.

However, we conclude that continued high-level management attention is warranted

in this area.

In particular, continued management attention is required in the

preparation for your first refueling outage and in the implementation of your

preventive maintenance enhancement program scheduled for completion by the end

of this year.

I plan to utilize the scheduled NRC Maintenance Team Inspection

to fully assess your progress in this area.

I also note that Engineering /

Technical Support continued to be rated as Category 3.

Recently, your

engineering organization was stabilized and fully staffed with qualified

individuals and we note some improvements. However, continued management

attention is needed and we plan to closely monitor the effectiveness of this

organization during the SALP 11 assessment period.

I personally assessed the rating for Safety Assessment / Quality Verification, a

new functional area, because the Board's vote was closely divided between a

Category 2 and Category 3 rating. After careful consideration, I concluded

that a Category 2 rating was appropriate.

The repeat Category 1 ratings in

Security, Emergency Preparedness, and Startup Testing are commendable.

While you will have sufficient opportunity to present your comments at the

meeting on March 29, 1989, we also solicit written comments within 30 days

after the meeting. Additionally, you are requested to respond in writing

specifically addressing planned corrective actions to improve your performance

in each of the two areas assigned Category 3 ratings.

Your comments, a summary

of our meeting, and my disposition of your comments will be issued as an

appendix to the enclosed SALP Board Report.

8903210452 090313

R

ADOCK 05000341

I (

.

PNV

--

--

.

. _ _ _ - _ _ _ _

_

_

_

_

'-

g

q

c

4 'i

..i

The Detroit Edison Company

2

MAR 181989

j

l

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

Board Report will be placed.in the NRC's Public Document Room.

Should you have any questions concerning the SALP Report, we would be pleased.

l

'

to discuss them with you.

Sincerely,

' Go

-

5

/O CW

A. Bert Davis

i

Regional Administrator

Enclosure:

SALP 10 Board Report

No. 50-341/89001

,

r

'

cc w/ enclosure:

Patricia Anthony, Licensing

P. A. Marquardt, Corporate

Legal Department

i

l

4;DCD/DCB;(RIDS)w

.

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

,

t

Harry H. Voight, Esq.

Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness

J. M. Taylor, DEDR

T. E. Murley, Director, NRR

Regional Administrators

RI, RII, RIV, RV

L. W. Zech, Chairman

T. M. Roberts, Commissioner

K. M. Carr, Commissioner

K. C. Rogers, Commissioner

J. R. Curtiss, Commissioner

J. F. Stang, Project Manager, NRR

T. R. Quay, Acting Director, Project Directorate III-1, NRR

J. Lieberman, Director, Office of

Enforcement

E. M. McKenna, SALP Coordinator, NRR

f

- - _ _ _ _ - _ _ - - - _ - - - _ _ - - _ - _ _ _ . _ - - _ - - _ _ _ _ _ _ - - - - - _ - _ _ _ _ - _ _ - _ _ _ _ _ - _ - _ _ - _ _ _ _ - - _ . . _ - _ _ -

. - _ .

______-_____-______-____-____--_--__a

.c

.y

.l h . _ '9 ' '

1

.

9, ;

,

f

! i

) 'r

'

l

2

,

,

. MAR 131989 -

5

The' Detroit; Edison Company-

3

j

j

.;-

,.

'

!

Distribution-(con't.y

l

r -j

N. B.;Le,;NRR'

'l

'

1

RIII.PRR

R.III SGA.

,

, . . .

State Liaison 0fficer,l State-

-i

of Michigan

-INPO

,

- DRP,.DRS and DRSS Branch Chiefs

~

'

~

',

and Section Chiefs.

.j

L A.!Reyes' RII:-

,

1

j

'

,-

Fi B. Ali,- Emergency Planning'.0ntario

G.'Desbien, Canadian Consulate. General

!

H. Sampson, Emergency Preparedness. Canada

T..Diamantstein,.AECB.

,

.

!

S.1J.' Collins,.RI;

'

i

~i

!

1

,

y

3

4

+

c

..

t

1

,,

1.

l

1

_ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ .

_

_ _ _

. _ _ _

._