ML20236B844
| ML20236B844 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/14/1987 |
| From: | Zech G NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20236B848 | List: |
| References | |
| NUDOCS 8710260378 | |
| Download: ML20236B844 (3) | |
See also: IR 05000327/1987055
Text
__ _- -
- --
i
$
(
..
-
.
s
.
October 14, 1987
E
a
Rc
C @$
Docket Nos. 50 327, 50-328
License Nos. UPR-77, OPR-79
o-
'M
)
Tennessee Valley Authority
-O
I
j
ATTN:
Mr. S. A. White
c
N
Manager of Nuclear Power
6N 38A Lookout Place
j
1101 Market Street
j
1
Chattanooga, TN 37402-2801
!
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-327/87-55 AND 50-328/87-55
]
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. A. Belisle on August 10-14 and 17-20, 1987.
The inspection included a
review of activities authorized for your Sequoyah facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection included reviewing existing corrective
action systems for resolving identified problems. Since the last inspection in
this area (May 1987, NRC Inspection Report Nos. 50-327,328/87-26), improvements
'
have been made in the corrective action area. Significant' management attention
is occurring; however, problems still exist that will take time.to fully resolve
such as additional employee training, accurate problem tracking, and general
procedure compliance.
With continued management support and satisfactory
'
resolution of these other areas, the corrective action program should be able
to support Sequoyah Unit 2 startup.
As indicated in the report, there appears to be some interface. problems between
)
engineering and other plant organizations.
This observation is based on: (1)
]
examples of problem descriptions provided by engineering staff to operations
1
staff not being sufficient to determine impact on operability or deportability
(paragraph 6.a) and; (2) examples of deficiency reports remaining outstanding
for excessive periods of time due to the closure mechanism remaining
i
self-contained within the engineering organization without direct continuous-
]
interface with other plant organizations (paragraph 6.c).
We request that'you
)
evaluate this observation and inform us of the result of your evaluation and
any actions you have taken or plan to take to improve engineering interfaces
with other organizations.
1
8710260378 871014
ADOCK 050
7-
G
\\
\\
01
j
,
.
.-
.,
,
'
Tennessee Valley Authority
2
October 14, 1987
l
l
Within these areas, the inspection consisted of select We examinations of
procedures and representative records,
interviews with personnel,
and
observation of activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of' Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
.)
.
.
l
The responses directed by this letter and its enclosures are 'not subject to the
!
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us'.
l
Sincerely,
(Original signed by G. Zech)
{
d
Gary G. Zech, Assistant Director
.
for Inspection Programs
1
TVA Projects Division
Office of Special Projects
Enclosure:
NRC Inspection Report
-]
cc w/ encl:
l
H. L. Abercrombie, Site Director
Sequoyah Nuclear Plant
J. A. Kirkebo, Director,
Nuclear Engineering
R. L. Gridley, Director
Nuclear Safety and Licensing
M. R. Harding, Site Licensing
Manager
bec:
(See page 3)
'l
l
1
l
'
l
!
_ - . _ _ _ -
-
.
.
..
'
,
Tennessee Valley Authority
3
0ctober 14, 1987.
i
bec w/encis:
J. N. Grace, RII
J. G. Keppler, OSP
1
S. D. Ebneter, OSP
l
J. A. Zwolinski, OSP
i
B. D. Liaw, OSP
S. D. Richardson, OSP
,y
S. R. Connelly, OIA
K. P. Barr, OSP/RII
F. R. McCoy, OSP/RII
)
R. Carroll, OPS /RII
j
J. B. Brady, OPS /RII (2 copies)
j
R. D. Gibbs, RII
j
T. A. Ippolito, Nuclear
J
Regulatory Consultant
-j
NRC Resident Inspector
NRC Document Control Desk
State of Tennessee
-
l
i
. . _
1
.
I
y
- er
R1
M a
09/t(/87
09/2//87
09/4//87
09////87
.
RII
RI
RI
R
GBelisle
CJul a
af,8,
w 8?
Ow?
-i,i87
c
!
[
_ - - _ _ _ _ . _ _ - _ _ _ _ _ _ _ - _ _ _ _