Advises That Temporary Change Notices 12B & 12C to Emergency Plan Meet Planning Stds of 10CFR50.47(b) & Requirements of App E
ML20236B689
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/21/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
NUDOCS 8710260302
Download: ML20236B689 (2)


Text

".

M' 1

4 9

}

UCT211987

~ p.$

9

}

(

6

)

' Alabama Power Company j

ATTN: Mr. R. P.' Mcdonald d

Senior Vice President j

P. 0. Box 2641 i

Birmingham, AL.'35291-0400 l

l Gentlemen:

q

SUBJECT:

FARLEY NUCLEAR PLANT EMERGENCY PLAN REVIEW, TEMPORARY CHANGE

. NOTICES 12B AND 120, DOCKET N05. 50-348 AND 50-364 j

l q

We have completed our review of Temporary Change Notice 12B and 12C. to your Farley Emergency Plan.. Our review indicates that the changes appear to meet -

the planning standards of 10 CFR 50.47(b) and the requirements'of. Appendix E:to yl 10 CFR 50.

]

Please be reminded that 10 CFR 50.54(q) requires that proposed changes that L,

decrease the effectiveness of your Emergency Plan shall not be implemented -

j witie application to' and approval by the Commission. However, changes may be -

made without Commission approval if such1 changes do not. decrease the '

effectivene'ss of the Plan, and th'e Plan, as changed, continues to meet the s

standards of 10 CFR 50.47(b).and the requirements. of Appendix' E to-10 CFR 50.

R If a change is made without approval, you should furnish'.copie's in'accordance j

with 10 CFR 50.54(q).

Also, any changes to the Emergency. Plan Implementing l

Procedures should be made in accordance with the requirements s of.10 CFR 50.

Appendix E,Section V.

l l

Should you have any questions regarding -this letter, please contact 1

Mr. Thomas R. Decker of our staff at (404) 331-2559.

q Sincerely, I

COG!NAL Sty 0 ny l

DOUCLAS IA COUJNS Douglas M. Collins,. Chief Emergency Preparedness and j

Radiological' Protection Branch

.i Division of Radiation Safety and Safeguards cc:

(Seepage 2)

Qo2ggobk 0

8

~

F T\\ j q

= f?Eb

-L

=

=.

Alabama Power Company 2

4 cc:

W. 0. Whitt, Executive i

Vice President J. D. Woodard, General Manager -

Nuclear Plant

l W. G. Hairston, III, General

~l Manager - Nuclear Support J. W. McGowan, Manager-Safety '

1 Audit and Engineering. Review J.- K. Osterholtz, Supervisor-Safety Audit and Engineering Review bec: NRC Resident Inspector E. Reeves, Project Manager, NRR Document Control Desk State of Alabama i

l i

RII RII' RII a4/.

AGooden TDec r HDa ce 10//9 /87 10/yd87 10/9/87

_=_

_=