ML20236B336

From kanterella
Jump to navigation Jump to search
Forwards Revised Final Element Repts,Reviewed by Employee Concern Task Group Mgt,For Five Elements Addressing Plant Employee Concerns Special Program in Engineering.Rept List by Number W/Submittal Dates & Employee Concern Numbers Encl
ML20236B336
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/16/1987
From: Russell J
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236B339 List:
References
NUDOCS 8710260087
Download: ML20236B336 (5)


Text

,_-_,_

D' \\vEf TENNESSEE VALLEY AUTHORITY g

Watts Bar Nuclear Plant i

P. O. Box 800 Spring City. Tennessee 37381 October 16, 1987 E

U.S. Nuclear Regulatory Commission e,

e Attn:

Document Control Desk O m's Washington, DC 20555 NW o

. Gentlemen:

p $

i us U

In'the Matter of the Application of

) Docket Nos. 50-327

- Tennessee Valley Authority

)

50-328 y

EMPLOYEE CONCERNS TASK GROUP (ECTG)

Enclosure'l provides a listing of the report numbers, the related employee concerns, and the previous submittal dates if. applicable.

transmits the revised final element reports for five elements addressing

. Sequoyah Nuclear Plant employee concerns in the Engineering Category. As indicated by the report cover sheets, these reports have completed final review by the Senior Review Panel and the Employee Concern.Tast Group management.

Please telephone me at (615) 365-3587 (Watts Bar) if you have any questions.

Very truly yours, TENNESSEE VALLEY AUTHORITY

/

James R. Russell Watts Bar Nuclear P ant ECTG Licensing Manager cc'(See page 2.):

I 8710260087 071016 PDR ADOCK 0500 7

P i.

4

  1. \\

An Equal Opportunity Employer

' 2 j

[

-U.S.' Nuclear Regulatory Commission 4

cc '(Enclosures):

u

' Mr.:G. G.-Zech, Assist' ant Director

Regional Inspections Division of TVA' Projects j

Office of Special-Projects U.S. Nuclear Regulatory Commission Region II 101'Marietta Street, NW, Suite 2900 l

Atlanta, Georgia 30323 I

Mr. John A. Zwolinski, Assistant Director For Projects Division of.TVA Projects Office of'Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway i

. EWW 322 Bethesda, Maryland 20018 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou' Ferry Road Soddy Daisy, Tennessee -37379 l

r

.---_-m..___

_._-__._._____m_

_____1.__.____

m m_

J

P,

4 h

l 1

1 1

t

~


l-.

Y ENCLOSURE 1 Page 1 of 1 Sequoyah Employee Element Concern Report Number Issue

- Engineering 20409 IN-85-397-001 Use of Reverse Prints (Revised Final)

Note:

EN 20409 was submitted January 15, 1987, as a Non-Restart Justification i

Summary. It is being revised and submitted per NRC request.

Engineering 20704 I-85-761-NPS Process for Approval r

(Revised Final) of CAQ Documentation Hinders Reporting of CAQs by Employees Note:

EN 20704 was submitted December 24, 1986, as a Non-Restart Justification Summary.

It is be.ing revised and submitted per NRC Request, Engineering 23208 IN-85-545-XO6 Piping and Valve Design (Revised Final)

Criteria for Minimum Pipe Wall Thickness Note:

EN 23208 was submitted December 22, 1986, as a Non-Restart Justification I

Summary.

It is being revised and submitted per NRC Request.

1 Engineering 23502 IN-85-064-002 Top of 480V Shutdown (Revised Final)

Boards are Open at Conduit (Cable) Entry f

. Note: EN 23502 was submitted December 10, 1986, as a Non-Restart Justification Summary. It is being revised and submitted per NRC Request.

l Engineering 24104 BMP-85-001 Inadequate Amphenol j

(Revised Final)

Connector Installation Note:

EN 24104 was submitted December 10, 1986, as a Non-Restart Justification Summary. It is being revised and submitted per NRC Request.

6842T j

J I

I f.

3 l

1 l

l I

1 J

A--____