Advises That Safety Sys Functional Insp Delayed from Apr Until Fall 1989,per Util 890221 Request
ML20236B057
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/02/1989
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
References
NUDOCS 8903200310
Download: ML20236B057 (2)


Text

, . ___ __.

_____q

  • >.  ;> 1[

. g, m-13 M >

gg@

3:.

+

Docket'Nos. 50-348,-50-364; LLicense Nos. NPF-2.and.NPF-8 j

? Alabama Power Company ATTN: Mr. W.-G. Hairston, III Senior Vice President-Nuclear Operations

'P. 0. Box 2641

, . Birmingham, AL 35291-0400 Gentlemen:

SUBJECT:

JOSEPH M. . FARLEY. NUCLEAR PLANT:- UNITS 1 AND 2 -

.SAFETYSYSTEMFUNCTIONALINSPECTION'(SSFI) H

. Your letter dated, February 21, 1989, requests that the NRC defer performing an-

.SSFI in April 1989 at Farley. The. letter points out"that two' refueling outages and a self-assessment (which includes.-SSFI and SS0MI techniques) make 1989 a

,particularly taxing year for Alabama Power Company and'its contractors._ You also state; that an 'SSFI conducted by the NRC during this . period will most likely result in postponing of your self-assessment efforts.

We.are pleased that'you .have accelerated your plans to conduct a self-initiated assessment that empicys ~ elements of our SSFI:and SSOMI inspection techniques. i

, Other utilities.have found this to be valuable for identifying safety-significant

. problems.1 .Welstrongly encourage you to undertake initiatives : involving self-'

assessment as part of your across-the-board safety responsibility;Lhowever, we.

do have' the. regulatory audit responsibility, and one of our audit tools is to use the SSFI inspection: technique in selected areas.

1 To facilitate your performance of the self-assessment, while still accommodating i our need to. perform independent regulatory assessments, we have decided to. defer I our planned SSFI from this April to the fall of 1989,1.e., until after you have completed your self-assessment. The system chosen for our SSFI at that time will likely be different' from the system we had chosen for the April SSFI.

We will also take this opportunity to inspect the scope, conduct, and .results of your completed self-assessment.

1 1

8903200310 890302  %

PDR ADOCK 05000348  ? 4 7

Q PDC IO

_--____-_______:__________-_--_-__-______--___-_-___-__-_____________-__??_f___L

i 1

l} **

. Alabama Power ~ Company '2 1

. 1 I am pleased that we could work out this accommodation, since this course of

' action will serve to further the safety effectiveness of both of our efforts at i the Farley site. If you have any questions, please advise. I Sincerely, Malcolm L. Ernst Acting Regional Administrator  !

cc: B. M. Guthrie, Executive Vice President R. F. Mcdonald, Executive Vice President D. N. Morey, General Manager -

Nuclear Plant ,

J. D. Woodard,- Vice President -

Nuclear Generation J..W. McGowan, Manager-Safety Audit and Engineering Review  ;

S. Fulmer, Supervisor-Safety  ;

Audit and Engineering Review State of. Alabama 4

bec: NRC Resident Inspector DRS Technical Assistant Document Control Deskv#

J. Taylor, NRR E. Reeves, Project Manager, NRR 1

k 1

RII ,RI RI .

gu7,gj t.

G on yes JPS hr ABe 02/ /C) isle:aw 8 8l MI 7 IL7/89 02/tj/89 92/Q189 \

sds1 t rqd^' ? I YM -