Text
'
- A :,
-}
=
File # 10110
-~
L
=
=
10119 7UELECTRIC
.Ref. #.NRCB 88-04 I
l' ~
\\
March 13, 1989 W.J.Cahm' i
lip becanve Vice President l
l' j
I U. S. Nuclear Regulatory Commission l
Attn:' Document-Control Desk l
Washington, D. C. 20555 1
SUBJECT:
COMANCHCPEAkSTEAMELECTRICSTATION i
)
DOCKET NOS. 50-445 AND 50-446 NRC BULLETIN 88-04: POTENTIAL' SAFETY RELATED PUMP LOSS l
1 REF:
1)
W. G..Cou'nsil. Letter TXX-88556 to NRC dated July 8, 1988
'k 2)
W. G. Counsil Letter TXX-88765 to NRC dated November 7, 1988-3)
W. G. Counsil' Letter TXX-88817 to NRC dated November 30, 1988 Gentlemen:
Reference 1 provided TV Electric's initial response to six action' items in the subject NRC Bulletia.
In that letter we indicated our evaluation of the J
identified safety-related systems and pumps-for Unit 1 and Common would be completed by December 1, 1988. Reference 3 revised the schedule for-completion.of this evaluation to February 13, 1989.
- Subsequent to the submittal of reference 1, the Centrifugal Charging Pumps in the Chemical and Volume Control System (CVCS) have also been identified in reference 2 a: having a' configuration that does not preclude pump-to-pump interaction during m1niflow operation and could potentially result in deadheading one or more of the pumps.
As a result.of this additional i
configuration concern, the schedule for completion of the evaluations required by NRC Bulletin 88-04 is being revised to April 28, 1989 for Unit 1 and Common.
The schedule for Unit 2 evaluation completion is' unchanged, a
8903200230 890313 PDR ADDCK 05000445 g
PNV y
^*?.,
1 TXX-89140 March 13,1989 Page 2 of,2 TV Electric will provide a written response describing the actions taken within 30 days of completion of the above evaluations.
j Sincerely, William J. Cahill, Jr.
E By:
D. R. Woodlan i
Docket Licensing Manager JLR/ddm c-Mr. R. D. Martin, Region IV Resident Inspectors CPSES (3)