Advises That Schedule for Completion of Evaluations Required by NRC Bulletin 88-004 Re Potential safety-related Pump Loss Extended Until 890428
ML20236A944
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/13/1989
From: William Cahill, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-004, IEB-88-4, TXX-89140, NUDOCS 8903200230
Download: ML20236A944 (2)


Text

'

  1. A :,

-}

I-L FE Log -# TXX-89140 l

=

File # 10110

-~

L

=

=

10119 7UELECTRIC

.Ref. #.NRCB 88-04 I

l' ~

\\

March 13, 1989 W.J.Cahm' i

lip becanve Vice President l

l' j

I U. S. Nuclear Regulatory Commission l

Attn:' Document-Control Desk l

Washington, D. C. 20555 1

SUBJECT:

COMANCHCPEAkSTEAMELECTRICSTATION i

)

DOCKET NOS. 50-445 AND 50-446 NRC BULLETIN 88-04: POTENTIAL' SAFETY RELATED PUMP LOSS l

1 REF:

1)

W. G..Cou'nsil. Letter TXX-88556 to NRC dated July 8, 1988

'k 2)

W. G. Counsil Letter TXX-88765 to NRC dated November 7, 1988-3)

W. G. Counsil' Letter TXX-88817 to NRC dated November 30, 1988 Gentlemen:

Reference 1 provided TV Electric's initial response to six action' items in the subject NRC Bulletia.

In that letter we indicated our evaluation of the J

identified safety-related systems and pumps-for Unit 1 and Common would be completed by December 1, 1988. Reference 3 revised the schedule for-completion.of this evaluation to February 13, 1989.

Subsequent to the submittal of reference 1, the Centrifugal Charging Pumps in the Chemical and Volume Control System (CVCS) have also been identified in reference 2 a: having a' configuration that does not preclude pump-to-pump interaction during m1niflow operation and could potentially result in deadheading one or more of the pumps.

As a result.of this additional i

configuration concern, the schedule for completion of the evaluations required by NRC Bulletin 88-04 is being revised to April 28, 1989 for Unit 1 and Common.

The schedule for Unit 2 evaluation completion is' unchanged, a

8903200230 890313 PDR ADDCK 05000445 g

PNV y

^*?.,

1 TXX-89140 March 13,1989 Page 2 of,2 TV Electric will provide a written response describing the actions taken within 30 days of completion of the above evaluations.

j Sincerely, William J. Cahill, Jr.

E By:

D. R. Woodlan i

Docket Licensing Manager JLR/ddm c-Mr. R. D. Martin, Region IV Resident Inspectors CPSES (3)

I

_ _ _ _ - _