ML20236A872
| ML20236A872 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/10/1987 |
| From: | Siegel B Office of Nuclear Reactor Regulation |
| To: | Spangenberg F ILLINOIS POWER CO. |
| References | |
| GL-87-08, GL-87-8, TAC-65231, NUDOCS 8710230203 | |
| Download: ML20236A872 (4) | |
Text
y I..
Docket No. 50 461 Mr. Frank Spangenberg, Manager Licensing and Safety P. O. Box 678 007 1 0 1987 Mail Code V920 Clinton, Illinois 61727
Dear Mr. Spangenberg:
SUBJECT:
MISCELLANE0US AMENDMENTS / SEARCH R'~QUIREMENTS CLINTON POWER STATION (TAC 65231)
This is to acknowledge receipt of the Illinois Power Company letter, dated December 1, 1986, which transmitted a proposed amendment to the Clinton Power Station Physical Security Plan, in response to the Miscellaneous Amendments and Search Requirements.
The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.
The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.
It is requested that you provide your response to these comments within 30 days from receipt of this letter.
The reporting and/or record keeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.
Should you have any questions concerning the enclosed comments, please contact i
the reviewer, Robert Skelton, at (301) 492 4533.
I Sincerely,
/s/ Alad N'Q JJ/ Byron Siegel, Project Manager 8710230203 871010 Project Directorate III-2 fDR ADOCK 0500 1
Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION W/ ENCLOSURES:
Physical Security Plan Comments RSGB rf Sec rf RSkelton CBuracker (2) cc w/ enclosure:
Region III LLuther Docket File 50 461/462; See next page BSiegel 4
Case File NRC PDR RErickson wo/enci Local POR
(*See Previous Concurrence)
LBush wo/ encl PStarcher
} cdm
..0FC
- RSGB
- RSGB
- RSGB
- RSGB
- PD III-2
- PD III-2 g g O NAME :RSkelton:mg*:CBuracker*
- LBush*
- RErickson* :lluthe
- BShgd
.../._____..:
DATEh:/h/87:\\ 5 /87
- f $/87
- OS /87 r/,7/87
- W /87
/
r Docket No. 50-461/462 Mr. Frank Spangenberg, Manager L' ensing and Safety P.
. Box 678 Mai ode V920 Clint(og Illinois 61727
Dear Mr.NS angenberg:
/
M ECELLANE0VS AMEN 0MENTS/ SEARCH REQUIREME
SUBJECT:
CLIN {0NPOWERSTATION (TAC 65231)
ThisistoacknbledgereceiptoftheIllinois,Po'werCompanyletter, dated December 1, 1986,\\which transmitted a proposef amendment to the Clinton Power Station Physical Se'qurity Plan, in response /to the Miscellaneous Amendments and Search Requirements.
N The submitted document has been reviewe and we have determined that additional information and revisionb to the plap/are required prior to our approval.
The enclosedcommentsarebashduponpeytinentNRCregulationsandpublishedguidance describing methods, acceptable tojthe NRC staff, for implementing specific parts of those regulations.
/
/
It is requested that you provjde your response to these comments within 30 days from receipt of this letter /. /
The reporting and/or record keeping requirements contained in this letter affect fewer than ten res'pondents; thi efore, OMB clearance is not required under P.L.96-511.
/
/
Should you have any q'uestions concerning t enclosed comments, please contact the reviewer, Robert Skelton, at (301) 492-3.
/
Sincerh.ly,
/
N
/
\\
[
ByronSiegel,krojectManager Project Directorate III-2 Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation Enplosure:
DISTRIBUTION W/ ENCLOSURES:
Physical Security Plan Comments RSGB rf Sec rf RSkelton CBuracker (2) cc w/ enclosure:
Region III LLuther See next page BSiegel Docket File 50-461/462 Case File NRC PDR RErickson wo/ encl Local PDR LBush wo/ enc 1 PStarcher 0FC :RSGB U: RSGB
- RSG0( }
- R$GB.
- PD III-2
- PD III-2 l
g NAME :RSkelton:mg :CBuracker Bush
- REr on
- LLuther
- BSiegel p l
v OATE M/ /87 20 6 /87
/g/87
/8/[/87
$ / /87
$D/ Q/87
/
J
_. _ = _ ______ -
.4 l
l Docket No. 50-461 ENCLOSURE 1
COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANE0USAMENDMENTSANDSEARCHREQUIREMENTS)
CLINTON POWER STATION Provide a schedule for implementing the amended safeguards requirements within 180 days after Comission approval of the proposed security plan.
Reference 10 CFR 73.55.
State that vital area access controls will not be dropped for life threatening
)
situations not involving public health and safety.
Reference 10CFR50.54(x) and(y)andGenericLetter87-08(Q&A#3).
Provide a comitment that the search requirements will be implemented within 60 days after Comission approval of the proposed revisions.
Reference 10 CFR73.55(d)(1).
Provide a comitment that if security force members leave the protected area to perform officid1 duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force. Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).
Revise the commitment on page 5-5-a to ensure prompt access to vital equipment to accomodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.
Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate security force members at the start of each shift, or by other acceptable means).
Reference 10 CFR 73.55(d)(7)(11) and Generic Letter 87-08 (Q&A #6).
Revise the comitment on page 14-1 to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety. Reference 10CFR73.55(d)(7)(11)(B) and Regulatory Guide 5.65.
Indicate by equipment number the specific components, from Table 5-1, for the secondar CFR 73.55(e)y power supply system that are protected as vital. Reference 10 (1) and Generic Letter 87-08 (Q&A #18).
Provide a comitment to maintain a log indicating name, badge number, time of entry, and time of exit of individuals granted access to all vital areas except those individuals entering or exiting the reactor control room.
Reference 10 CFR 73.70(d).
l
t..
I t
Mr.. Frank A. Spangenberg III Clinton Power. Station Illinois Power Com any Unit 1 i
cc Mr. D. P. Hall Mr. L. Larson Vier President Project Manager Clinton Power Station-General Electric Company P. O. Box 678 175 Curtner Avenue, M/C 395 i
Clinton, Illinois 61727 San Jose, California 95125 Mr. R. D. Freeman Regional Administrator, Region III Mannger-Nuclear Station Engineering Dpt.
799 Roosevelt Road j
Clinton Power Station Glen Ellyn, Illinois 60137 P. O. Box 678 i
Clinton, Illinois 61727 i
Shaldon Zabel, Esquire Chairman of Dewitt County Schiff, Hardin & Waite c/o County Clerk's Office i
7200 Sears Tower DeWitt County Courthouse 233 Wacker Drive Clinton, Illinois 61727 Chicago, Illinois 60606 R2sident Inspector Illinois Department U. S. Nuclear Regulatory Commission Of Nuclear Safety RR 3, Box 229 A Division of Engineering Clinton, Illinois 61727 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Mr. Donald Schopfer Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 4
O e
e
.A
+