g l,-
10ctober 14, 1987
-Docket No. 50-354 T
Mr.'Corbin A. McNeill, Jr.
Senior Vice President - Nuclear
- Public. Service Electric & Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. McNeill:
.i
SUBJECT:
COMPLIANCE WITH ATWS RULE 10 CFR 50.62 (TAC N0. 61255)
Re:
. HOPE CREEK GENERATING STATION We have completed our review of your submittals ' dated May 21,1985, April 2 and July 14, 1987 describing how'the Hope Creek alt.ernate rod injection (ARI) system, anticipated transient without scram reactor coolant recirculation pump trip (ATWS/RPT) and standby liquid-control (SLC) systems meet the requirements of the'ATWS Rule (10 CFR 50.62). We have concluded, based on the information i
provided in these,submittals, that. Hope Creek-is currently in compliance with the ATWS rule requirements for the ARI and ATWS/RPT systems. ~We have also concluded i. hat, with the implementation of the Technical Specification change concerning the SLC system proposed in your July 14, 1987 submittal, Hopc Creek will-be in compliance with the ATWS Rule requirements _for the SLC system.
A
. copy'of our.. safety evaluation supporting these conclusions is enclosed.
l We are issuing an amendment by separate letter that will revise the Technical
]
Specifications to make_the changes that you proposed in your July 14, 1987 letter.
Sincerely,
/s/
j George Rivenbark, Project Manager Project. Directorate I-2 Division of Reactor Projects I/II
Enclosure:
l Safety Evaluation DISTRIBUTION l
6116cket4EUe a l
NRCPDR/ Local PDR PDI-2 Reading SVarga/BBoger-
.j M0'Brien i
GRivenbark/RLo' OGC-Bethesda Edordan JPartlow ACRS (10)'
Previously concurred
- QO2h201 Bh0$'R PDI-2/PM*
PDI-2/D*
o 34
- GRivenbark:mr
' WButler 0CK 0 PD 10/14/87 10/14/87 p
I
_Wm.'__
___._.-___U
e,-
l i.
l.
l Docket No. 50-354 i
.Mr. Corbin A. McNeill, Jr.
L Senior Vice President - Nuclear Public Service Electric & Gas' Company l
P.O. Box 236 Hancocks Bridge, New Jersey- 08038 i
Dear Mr. McNeill:
SUBJECT:
COMPLIANCE WITH ATWS RULE 10 CFR 50.62 (TAC NO. 61255) yh Re:
HOPE CREEK. GENERATING STATION We have completed our review of your submittals dated May 21, 1985 April 2 l
and July 14, 1987 describing' how the. Hope Creek alternate rod infection (ARI) t l
system, anticipated transient without scram reactor coolant rec,he requirements frculation pump I
trip (ATWS/RPT) and standby' liquid control (SLC) systems meet t of the ATWS Rule (10 CFR 50.62). We have concluded, based onrth h information i
provided in these:submittals -that Hope Creek is currently in compliance with j
-the ATWS rule requirements for.the ARI.and ATWS/RPT systems. We have also concluded that, with the implementation of the Technical Specification change l
concerning the SLC system proposed in your July 14,1987. submittal, Hope Creek will be in compliance with the ATWS Rule requirements for the SLC system.
A' copy of our safety evaluation supporting these conclusions is enclosed.
I We are issuing an amendment'by separate letter that will. revise the Technical Specifications to make the changes that you proposed in your July 14, 1987
- letter, i
Sincerely, Ge ge Rt/enbark, roject Manager i
Project Directorat I2 Division of Reactor Projects-I/II a
Enclosure:
Safety Evaluation DISTRIBUTION I
Docket File NRCPDR/ Local PDR PDI-2 Reading SVarga/BBoger M0'Brien
'GRivenbark/RLo OGC-Bethesda EJordan JPartlow ACRS (10)
WButler\\
PDI-2/P PDI-2/D GRivenba k:mr P /ft/87 0
/87 l
l..
UNITED STATES
=
~%,
NUCLEAR REGULATORY COMMISSION
.8~
o WASHINGTO N, D. C. 20555
_h October 14, 1987 g...../
Docket No. 50-354 Mr. Corbin A. McNeill, Jr.
Senior Vice President - Nuclear Public Service Electric & Gas Company-P.O. Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. McNeill:
COMPLIANCE WITH ATWS RU'LE 10 CFR 50.62 (TAC N0. 61255)
SUBJECT:
HOPE CREEK GENERATING STATION f
Re:
21, 1985, April 2 We have completed our review of your submittals dated Maydescribing h and July'14, 1987
~
system, anticipated transient without scram reactor coolant recirculation purp trip (ATWS/RPT) and standby liquid control (SLC) systems meet the requirements We have concluded, based 'on the information.
1 I
of the ATWS Rule (10 CFR 50.62).
provided in these submittals, that Hope Creek is currently in compliance.with the ATWS rule requirements for the ARI and ATWS/RPT systems.. We have also l
concluded that, with the implementation of. the Technical Specification changesubm
~
concerning the SLC system proposed-in your July. 14, 1987 A
l will be in compliance with the ATWS Rule requirements for the SLC system.
copy of our safety evaluation supporting these conclusions-'is enclosed.
We are issuing an amendment by separate letter that will revise the Technical 14, 1987 Specifications to make the changes that you proposed in your July
- letter, j
Sincerely.-
i Nohg% h f6 e
e Rivenbark, Project Manager Project Directorate I-2' Division of Reactor Projects I/II
Enclosure:
Safety Evaluation
V'-
l Mr. C. A. McNeill Hope Creek Generating Station Public Service Electric & Gas Co.
CC:
Mr. B. A. Preston, Manager S. E. Miltenberger Licensing and Regulation i
Vice President - Nuclear Operations Nuclear Department Nuclear Department P.O. Box 236 P.O. Box 236 Hancocks Bridge, New Jersey 08038 Hancccks Bridge, NJ 08038 t
Susan C. Remis Gregory Minor Division of Public Interest Advocacy Richard Hubbard New Jersey State Department of i
Dale Bridenbaugh the Public Advocate MHB Technical Associates Richard J. Hughes Justice Complex 1723 Hamilton Avenue, Suite K San Jose, California 95125 CN-850 Trenton, New Jersey 08625 M. J. Wetterhahn, Esquire Office of Legal Counsel Conner & Wetterhahn Department of Natural Resources j
Suite 1050 and Environmental Control i
1747 Pennsylvania Avenue Washington, D.C.
20006 89 Kings Highway
)
P.O. Box 1401 Dover, Delaware 19903 R. Fryling, Jr., Esquire j
Law Department - Tower SE Ms. Rebecca Green f
80 Park Place New Jersey Bureau of Radiation Newark, New Jersey 07101 j
Protection 380 Scotch Road l
Trenton, New Jersey 08628
{
Resident inspector U.S. Nuclear Regulatory Commission Mr. Anthony J. Pietrofitta l
P.O. Box 241 General Manager Hancocks Bridge, New Jersey 08038 Power Production Engineering Atlantic Electric j
Richard F. Engel 1199 Black Horse Pike Deputy Attorney General Pleasantville, New Jersey 08232 Division of Law i
Environmental Protection Section Regional Administrator, Region I Richard J. Hughes Justice Complex U.S. Nuclear Regulatory Commission CN-112P 631 Park Avenue i
Trenton, New Jersey 08625 King of Prussia, Pennsylvania 19406 Mr. S. LaBruna General Manager-Hope Creek Operations Hope Creek Generating Station P.O. Box 118 Hancocks Bridge, New Jersey 08038
- - - " - - - _. _ _ _ _ _ _