Informs of Plans to Conduct Team Insp of Facility on 870817-21 Re Ability to Provide Safe Shutdown in Event of Fire
ML20236A059
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/22/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8707280007
Download: ML20236A059 (2)


Text

r 1

i e

JUL 2 21987 Docket No. 50-245 Northeast Nuclear Energy Company ATTN:

Mr. E. J. Mroczka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06141-0270

-l 1

Gentlemen:

I

Subject:

Fire Protection Safe Shutdown Inspection - Millstone Nuclear Power Station, Unit 1 This letter is to inform you of our plans to conduct an NRC special announced team inspection on August 17-21, 1987, of your facility with regard to the ability to provide safe shutdown in the event of a fire.

To effectively conduct the inspection, we request that analyses, procedures and other documentation on this subject, be available at the site during the inspection.

If possible, engineering personnel knowledgeable of your efforts in this area should also be available.

In addition, we are requesting that one i

set of such documentation be made available to the team at the Region I office of the NRC in King of Prussia, Pennsylvania, before July 27, 1987.

This request has been discussed with your staff and arrangements have already been made to have these documents delivered to NRC.

Your staff has indicated that a work location for the team in an area with easy access to the plant drawing files has been arranged. Additionally, we under-stand that personnel escorts will be available to allow team members ready access to all areas of the plant. We request that you specify a member of ycur staff as a primary point of contact for the team to meet with at the end of each day i

to discuss any findings the team may have and to receive requests for additional information required to resolve any open issues.

Your cooperation with us during this inspection is greatly appreciated.

Should you have any questions, please do not hesitate to contact me at (215) 337-5080/5081.

,0riginal Signed By:

k uk William V. Johnston,

/

Acting Director W Division of Reactor Safety

$ [>g 7 2 g g g 7

][

G l

0FFICIAL RECORD COPY PULLANI911 - 0001.0.0 1 D i

L 07/22/87

\\

)

Northeast Nuclear Energy Co.

2 cc:

W. D. Romberg, Vice President, Nuclear Operations S. E. Scace, Station Superintendent D. O. Nordquist, Manager of Quality Assurance R. M. Kacich, Manager, Generation Facilities Licensing Gerald Garfield, Esquire Public Document Room (PDR)

Local Pe.blic Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut bcc:

Region I Docket Room (with concurrences)

C. Anderson, DRS, RI E. McCabe, DRP, RI M. Boyle, PM, (Millstone 1), NRR/PDISA L. Whitney, NRR/ILRB F. Hebdon, NRR/ILRB M. Peranich, NRR/ILRB J. Kudrick, NRR/SPLB J. Shapaker, NRR/0EAB J. Wermeil, NRR/SPLB S. Pullani, DRS, RI A. Krasopoulos, DRS, RI J. Taylor, BNL R. Hodor, BNL K. Sullivan, BNL i

RI:DRS RI:DRS

'RI:DRS Pu11ani Anferson Strosnider 7/2L}$)

gjpfy1 1lLLl07 0FFICIAL RECORD COPY PULLANI911 - 0001.0.1 07/22/87