Forwards Rev to Site Security Plan,Meeting Intent of NUREG-0908 & NUREG-1045,consisting of Overall Upgrade.Rev Withheld
ML20236A014
Person / Time
Site: Fort Calhoun 
Issue date: 03/15/1989
From: Morris K
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0908, RTR-NUREG-1045, RTR-NUREG-908 LIC-89-285, NUDOCS 8903160258
Download: ML20236A014 (2)


Text


- - - _

SAFEGUEDS liif0 Mil 0K

[. -.

.j g, / sm, p..; y,.

3...

, g,g,_

_.j

]

lg

,m Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 2247 ENCLOSURE (S) CONTAIN(S)

SAFEGUARDS INFORMATION.

DECONTROLLED WHEN SEPARATED FROM ATTACHMENT (S)

March 15, 1989 LIC-89-285 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop P1-137 Washington D.C.

20555

Reference:

Docket No. 50-285

Dear Gentlemen:

SUBJECT:

Revision of the Fort Calhoun Station Site Security Plan Omaha Public Power District (OPPD) has prepared a revision to the Fort Calhoun Station Security Plan which meets the intent of NUREG-0908 entitled " Acceptance Criteria for the Evaluation of Nuclear Power Reactor Security Plans," and contains guidance from NUREG 1045 " Guidance on the Application of Compensatory Safeguards Measures for Power Reactor Licensees."

This revision is an overall upgrade which arranges the Site Security Plan into a general plan with specific implementing procedures.

Since it is a significant change, the revision number has been designated as Revision 0.

OPPD provided a presentation of the revision to Region IV security personnel in Arlington, Texas on January 19, 1989 and has factored comments from the meeting into the plan.

OPPD is submitting this change in accordance with 10 CFR 50.54(p), which allows implementation of the changes prior to the approval of the Plan. OPPD intends to implement these changes after completion of training, which is expected to be completed by March 31, 1989.

Included in Appendix A of the plan are interim provisions which will be in effect until new physical protection features can Le completed.

Implementation of the plan was discussed between Mr. A. B.

Earnest of Region IV and members of my staff in a telephone conversation on March 9, 1989.

l l

8903160258 890315

/

PDR (4 DOCK 05000285 F

PDC M

l SAFEGUMDS liff0 Mil 0N

~

l

<m-umggm_,,,

use

SEEGUltRDS mf0RMAUM twet0suRE<si c0NTAints)

SAFEGUARDS INFORMATION.

U. S. Nuclear Regulatory Commission DECONTROLLED WHEN LIC-89-285 SEPARATED FROM ATTACHMENT (S)

Page 2 j

This submittal contains safeguards information and its distribution should be restricted on a "need to know" basis.

Controlled copy numbers 6, 7, and 18 are enclosed.

Controlled copies 19, 20 and 8 are being transir,tted to Region IV, and the Senior Resident Insper. tor respectively.

Should you have any questions concerning this matter, please contact us.

Sincerely, b $$$

/J. Morris D'ivision Manager Nuclear Operations KJM/sa c:

LeBoeuf, Lamb, Leiby & MacRae w/o attachment P. D. Milano, NRC Project Manager w/o attachment R. D. Martin, NRC Regional Administrator (Controlled copies #19 and #20)

J. Everett, NRC Section Chief P. H. Harrell, NRC Senior Resident Inspector (Controlled copy #8) l l

8AfEGUARDS INFORMAUN.


- ---- ----------------- _ --- _ - _ _ - _ _-