s TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 374o1 SN 157B Lookout Place FEB 281989 U.S. Nuclear Regulatory Commission ATTH: Document Control Desk
' Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-260 Tennessee Valley Authority
)
BROWNS FERRY UUCLEAR PLANT (BFN) - NRC INSPECTION REPORT NUMBER 50-260/88-200 i
EMERGENCY OPERATING INSTRUCTIONS (EDIs)
This letter is in response to the concerns identified in the subject inspection report.
NRC has identified several concerns primarily in the areas of development and implementation of the EDIs, evaluation of the containment venting procedures, evaluation of personnel access to the reactor building during emergencies, and deviations between the EDIs and their base documents. By letter dated December 2, 1988 TVA deferred a completo response to NRC Inspection Report 50-260/88-200 until February 28, 1989. This letter explained that it would be inappropriate for TVA to respond to the NRC's concerns until they have been thoroughly reviewed and the majority of the corrective actions have been completed.
Although most of these concerns have been included in the changes for the upcoming revision, the revision to the EOls has not been implemented and the operators have not been trained on the changes. The reason for this is because the BFN EOls are very tightly controlled and revisions to them are carefully evaluated. Therefore revisions are kept to a minimum. In order to capture all appropriate changes, the revision will be introduced into the TVA approval cycle as close to restart as possible. Therefore, as discussed with C. E. Cears of the NRC staff on February 21, 1989, TVA will provide the response to the above inspection report by May 15, 1989.
The enclosure contains a list of the commitments.
Please refer any questions regarding this submittal to Patrick Carier, Manager of BrN Site Licensing, (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY 7
)')S
(/9237/l R. Gri. ley, Manager Nuclear Licensing and Regulatory Affairs f
Enclosure cc: See page 2 s
8903130547 890228 8 I(
ADOCK0500go DR An Equal Opportunity Employer
7
~
l 3
__4 If ~,
. =..g 2
p sj; l
U.S.iMuclear Regulatory' Commission
~
cc;(Enclosure):
Ms. S. C. Black,. Assistant. Director 4
la for Projects.
q TVA Projects Division i
U.S. ' Nuclear Regulatory Commission -
-l One White Flint,. North i
11555 Rockville Pike
- Rockville; Maryland 20852-
-i h
l
- Mr. F. R. McCoy, Assistant Director j
for Inspection Programs
.{
- TVA Projects Division j
U.S. Nuclear Regulatory Commission Region II:
' 101.Marietta Street, NW, Suite 2900
' Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant
- Route'12, Box 637=
.l Athens, Alabama 35611 l
i k,g,~
~
i
'!:t i
l l
l k
'l I
_.-i_.__._____.__
...I
1..
ENCLOSURE
RESPONSE
HRC INSPECTION REPORT No.. 50-260/88-200 LETTER FROM J. G. PARTLOW TO S. A. WillTE.
DATED SEPTEMBER 28, 1988.
LISTING OF COMMITMENTS TVA will provide a response to th'e NRC's concerns. identified in Inspection Report 50-260/88-200 by May 15, 1989.