Forwards SER Accepting Util 831107,840229 & Re Generic Ltr 83-28,Item 2.1 (Part 2) Re Confirmation That Interface Established W/Nsss Supplier or Vendors of Each Reactor Trip Sys component.EGG-NTA-7591 Technical Rept Encl
ML20235X522
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/20/1987
From: Crocker L
Office of Nuclear Reactor Regulation
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20235X525 List:
References
GL-83-28, TAC-52844, TAC-52845, NUDOCS 8707240223
Download: ML20235X522 (1)


Text

r 3

Docket Nos.: 50-321 50-366 S 0 NL 1997 Mr. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Company P.O. Box 4545 Atlanta, Georgia 30302

Dear Mr. O'Reilly:

Subject:

Safety Evaluation for Generic letter 83-28, Item 2.1 (Part 2)

- Equipment Classification (TAC Nos. 52844/52845)

Re: Edwin I. Hatch Nuclear Plant, Units 1 and 2 By letter datec June 12, 1986 from G.W. Rivenbark to J.T. Beckham, Georgia Power Company was informed that the NRC staff had completed its review of GPC's response to Item 2.1 (Part 1) of Generic Letter 83-28, relating to identification and classification of Reactor Trip System (RTS) components.

The staff inforned you by that letter that it had found GPC's responses to Item 2.1 (Part 1) acceptable, Part 2 of Item 2.1, Generic Letter 83-28, required licensees to confirm l that an interface had been established with the NSSS supplier or the vendors of each of the RTS . components which provided for (1) periodic communication between the licensee and the NSSS supplier or the RTS component vendors, and (2) a system of positive feedback to confirm receipt by the licensee of ,

transmittals of vencor technical information regarding the RTS components. 1 The staff has now coupleted its review of the GPC responses to Item 2.1 (Part 2) as documented in GPC submittals dated November 7,1983, February 29, 1984, i and June 3, 1985. The enclosed Safety Evaluation, which is based upon a contractor report, also enclosed, documents our finding that your responses to Item 2.1 (Part 2) of Generic Letter 83-28 are acceptable.

This completes tLe action regarding Item 2.1 of Generic letter 83-28 and we consider this matter to be closed. j Sinc = rely, J 8707240T!23 870720 Lawr'n e e IP. Crocker, Project Manager DR ADOCK 0500 1 Project Directorate II-3 l Division of Reactor Projects I/II l

i

Enclosures:

f 1. Safety Evaluation

2. EG&G Idaho, Inc. Rep. ort cc: See next pane )

DISTRIBUTION:.-

l N; Docket file. .

NRC PDR Local PDR PDII-3 Reading l BJYoungblood Reading SVarga/Glainas MDuncan LCrocker i OGC Be,tesda EJordan JPartl w ACRS(10)

/ll { ,

PDII-3/D.PI/II PDIl RPI/II PI/II j LCrockerfrad MDuk PDII.kb/od BJY l 07/AC/87 07g/87 07/g j J