ML20235X294
| ML20235X294 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/02/1989 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20235X296 | List: |
| References | |
| NUDOCS 8903130409 | |
| Download: ML20235X294 (2) | |
See also: IR 05000266/1989005
Text
.
,
___
_
_
_
___
_
- _ - _ _
.
x
,ign
jf
- ; . . ..
'
.
.
,
f: i q
,
.
.
.
--
Docket No. 50-2'66,
Docket No. 50-301
u_
.
H
' Wisconsin Electric Power Company
ATTN: Mr. C. W. Fay -
Vice President.
Nuclear Power Department
231' West Michigan, Room 308-
Milwaukee, WI' 53201
Gentlemen:
.This refers to the: routine safety . inspection conducted by Mr. R. Hasse,
'Ms.
V.' P.'Lougheed and Ms. A. M. Bongiovanni of this office on January.30
through~ February 3,1989, of activities at Point Beach Nuclear Plant authorized
.
~
'
by NRC'0perating~ Licenses No. DPR-24 and No. DPR-27 and to the discussion of
our.. findings with Mr. T. Koehler and others of your staff at the conclusion of
the: inspection.
,
The purpose of this inspection was to determine if design changes and
modifications were being conducted in accordance with regulatory requirements.
_The. enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective-
examination of procedures and representative records, observations, and
interviews with personnel.
'No violations of NRC requirements were-identified-during the course of this
inspection; however, we request that you respond to the open item identified
in Paragraph 2.a.(5) of the attached inspection report.
Your response should
include a copy of the 10 CFR 50.59 evaluation.
During this inspection a violation of 10 CFR Part 50, Section 50.59 was
identified in that a required safety evaluation was not performed.
Since this
appeared to be an isolated violation and you have taken effective generic
action in improving your implementation of this regulation, no Notice of
Violation is being issued in accordance with the criteria of 10 CFR Part 2,
Appendix C,Section V.A.
We request that you submit a copy of the completed
evaluation.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of.
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room,
n
- -QO)
Rgra2%-.r
!
g
O
-_
_
_ _ _ _ _ _ _ . _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _ _
_ - - - _
..
MAR 0 21989
-
-
-
-
.
.
Wisconsin Electric Power
2
-
Company
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
$RfCINAL 3!GHED Dr G1;:imy g, gn -
l
Geoffrey C. Wright, Chief
Operations Branch
Enclosure:
Inspection Reports
No. 50-266/89005(DRS);
No. 50-301/89005(DRS)
cc w/ enc ~iosure:
J. J. Zach, Plant Manager
DCD/DCB (RIDS)~
Licensing Fee Management Branch
l
Resident Inspector, RIII
Virgil Kanable, Chief
Boiler Section
Charles Thompson, Chairperson
Wisconsin Public Service
Commission
R. I. Braund (SLO),
WI Div. of Emergency Government
Lawrence J. McDonnell, Chief
Radiation Protection Section
WI Department of Health and
Social Services, Division
of Health
RIII
RIII
RIII
III
RIII
III
Lhghed
Bokivanni /Phil
Nright
H
e b
s
e ye e
u,
,n
q7
-
u
i