ML20235W757

From kanterella
Jump to navigation Jump to search
Returns Proposed Changed Tech Spec Page 3.10-3, Inadvertently Encl w/881228 Submittal,Per 890303 Telcon
ML20235W757
Person / Time
Site: Maine Yankee
Issue date: 03/03/1989
From: Sears P
Office of Nuclear Reactor Regulation
To: Frizzle C
Maine Yankee
References
NUDOCS 8903130169
Download: ML20235W757 (3)


Text

-

^

1 March 3,1989

)

.l

)

i

Docket No. 50-309 i

Mr. C. D. Frizzle, President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336.

Dear Mr. Frizzle:

SUBJECT:

SUBMITTAL CONCERNING 2700 MWTh OPERATION AT MAINE YANKEE By letter dated December 28, 1988,'you submitted a proposed change to your Facility Operating License NO. DPR-36 concerning 2700 MWTh operations at Maine Yankee.

By telecon March,3, 1989, Mr. S. Evans of Maine Yankee Atomic Power Company informed the undersigned that.a proposed changed. Technical Specification page 3.10-3 (enclosed) was inadvertently enclosed with your December 28, 1988 submittal. That page is being returned to you.

..If you have any questions, please contact the undersigned at 301-492-1437.

Sincerely, Original signed by:

Patrick M. Sears, Project Manager Project Directorate I-3 Division of Reactor Projects I/II

Enclosure:

As stated cc w/ encl.: See next page DISTRIBUTION:IlD$$k5 N N El NRC& Local PDRs, PDI-3 r/f, Glainas, BBoger, MRushbrook,OGC,EJordan,BGrimes,ACRS(10),RWessman,JWiggins,Rgn.I

@'MS h

< OFC :PDI-3

PDT-3
DIR/PDI-3

:-----.1.-----:------------:------------:------------:-----....--:...---------:-----------

NAME kook :PSears:mw

RWessman DATE at/ /89
9/'4/89
2/ 3 /89 s

v 33 0FFICIAL RECORD COPY l

l l

8903130169 890303 PDR ADOCK 05000,309 p

FDC

(

l j.

Mr. C. D. Frizzle Maine Yankee Atomic Power Company Maine Yankee Atomic Power Station cc:

Mr. C. D. Frizzle, President Maine Yankee Atomic Power Company Mr. P. L. Anderson, Project Manager

)

83 Edison Drive Yankee Atomic Electric Company 1

. Augusta, Maine 04336 580 Main Street' l

Bolton, Massachusetts 01740-1398 Mr. Charles B. Brinkman Mr. G.. D. Whittier, Manager Hanager - Washington Nuclear Nuclear Engineering and Licensing Operations Maine Yankee Atomic Power Company Combustion Engineering, Inc.

83 Edison Drive

'12300 Twinbrook Parkway, Suite 330 Augusta, Maine '04336 Rockville, Md. 20852 John A. Ritsher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 State Planning.0fficer Executive Department 189 State Street Augusta, Maine 04330 Dr. E. T. Boulette, Vice President Operations and Plant Manager Maine Yankee Atomic Power Company P. O. Box 408 Wiscasset, Maine 04578 Mr. J. H. Garrity, Vice President Licensing and Engineering Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336 Regional Administrator, Region I U.S. Nuclear Regulatory Connission 475 Allendale Road King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 Mr. Cornelius F. Holden l :.

Resident Inspector c/o U.S. Nuclear Regulatory Connission P. O. Box E Wiscasset. Maine 04578 U_________-____________.

ENCLOSURE I

1 j.,

2.

the total radial peaking factor, defined as T

P (1 + T )

FR-FR q

shall be evaluated at least once a month during power operation above-50% of rated full power.

2.1 FR is the latest available unrodded radial peak determined from the incore monitoring system for a condition where all CEAs are at or above the 100% power insertion limit.

T is given q

by the following expression:

Tg

,2 (Pa-Pc)2, (ph_pd)2 (Pa+Pb

+ Pc+Pd)Z where Pi is the relative quadrant power determined from the incore system for quadrant i, when the incore system is operable.

If the incore system is not operable, the Pi are the signals from excore detector channels i.

T 2.2 If the measured value of FR exceeds the value given in Figure 3.10-4, perform one of the following within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

1.

Reduce the allowable PDIL insertion (Figure 3.10-1) symmetric offset LC0 (Figures 3.10-8 and 3.10-9) and trip band (Figure 2.1-2), thermal margin low pressure trip limit (Figures 2.1-1 a and b and Technical Specification 2.1), linear heat rate limits *

(Figure 3.10-11) and excore LOGA monitoring limits (Figures 3.10-2 and 3.10-3) by a factor greater than or equal to:

T T

[FR measured] / [FR Figure 3.10-4]

DE:

2.

Reduce thermal power at a rate of at least 1%/ hour to bring T

the combination of thermal power and % increase in FR to within the limits of Figure 3.10-5, while maintaining CEAs at or above the 100% power insertion limit.

If incores

]

are not operable and Figure 3.10-2 is in use, then also reduce excore LOCA monitoring limit (Figure 3.10-2) by a factor greater than or equal to:

s T

T

[FR measured] / [FR Figure 3.10-4]

03:

3.

Be in at least HOT SHUTDOHN.

~

3.10-3 12/28/8Er 0822L-RPJ

_ _ _ - _ - _.