Forwards Safety Evaluation Re HPI Makeup Nozzle Cracking Based on Util 860310 & 1030 Submittals.Util Effort Underway to Obtain & Install Acceptable Flow Meter.Plans for Implementation of Recommendations Requested within 45 Days
ML20235W673
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/15/1987
From: Dick G
Office of Nuclear Reactor Regulation
To: Tison Campbell
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20235W675 List:
References
NUDOCS 8707230649
Download: ML20235W673 (3)


Text

_ _ _ _ _ _ _ _ .

Docket No. 50-313 i

Mr. T. Gene Campbell JUL I 51987 Vice President, Nuclear Operations {

Arkansas Power and Light Company P. O. Box 551 Little Rock, Arkansas 72203

Dear Mr. Campbell:

SUBJECT:

IMPLEMENTATION OF B&W OWNERS GROUP RECOMMENDATIONS CONCERNING ,

HPI MAKEUP N0ZZLE CRACKING - ARKANSAS NUCLEAR ONE, UNIT 1 1 In a letter dated October 29, 1985 transmitting Inspection Report 50-313/85-23, Arkansas Power and Light Company (AP&L) was notified by the NRC Region IV of  !

deviations regarding the completeness of implementation of recommendations I made by the B&W Owners Group (BWOG) Safe-End Task Force. By NRC letter of January 27, 1986, AP&L was informed that its reply to the Notice of Violation constituted a revision of previous commitments and the issue was referred for this office for review.

At the time of the inspection, AP&L was not recording the High Pressure Injec-tion (HPI) flow rate and duration whenever there was HPI actuation as recommended by the Task Force. By letter dated October 30, 1986, AP&L commited to log the parameters when the SPDS is available.

The other deviation from the BWOG recommendations concerned the measurement of continuous flow to the makeup nozzle via bypass of the Pressurizer Level Control Valve. Although there is believed to be adequate flow through the nozzle whenever the makeup pump is running, the amount of bypass flow is not known. Consequently, the deviation from the BWOG recommendations still exists.

We do understand through discussions with the NRC Residence Inspectors that AP&L has an effort underway to obtain and install an acceptable flow meter.

Please provide your plans and schedule for implementation of this BWOG recom-mendation with 45 days of this letter.

Our Safety Evaluation is enclosed.

Sin r ly, Ge rge F. Dick, Jr. , Project Manager Project Directorate - IV Division of Reactor Pre' :ts - III, IV, V and Special Pro, 9ts Enclosure and cc w/ enclosure:

See next page

, DISTRIBUTION

Docket file
NRC PDR Local PDR PD4 Reading DM Crutchfield F. Schroeder J. Calvo P. Noonan G. Dick OGC-Bethesda E. Jordan J. Partlow ACRS (10) ,

R. Lee PD4 Plant File PD4/Lp PNoona'

(  ! @ick:

hPM sr PD/ DON JCalvo 7/ D/87 7//f/87 7/tr /87 8707230649 070715 3 PDR ADOCK 0500 P

Enclosure:

As stated cc w/ enclosure:

See next page l

.j i

Mr. G.' Campbell ,

Arkansas Power & Light Company Arkansas Nuclear One, Unit 1 l l

cc:

Mr. J. Ted Enos, Manager Nuclear Engineering and Licensing Arkansas Power & Light Company P. O. Box 551 Little Rock, Arkansas 72203 Mr. James'M. Levine, Director Site Nuclear Operations Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Mr. Nicholas S. Reynolds Bishop, Liberman, Cook, Purcell & Reynolds  !

1200 Seventeenth Street, N.W.

I Washington, D.C. 20036 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 2090 Russellville, Arkansas 72801 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office'of Executive Director  :

for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Frank Wilson, Director l Division of Environmental Health Protection Department of Health Arkansas Department of Health 4815 West Markham Street Little Rock, Arkansas 72201 Honorable William Abernathy County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801

_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ -