ML20235W091
| ML20235W091 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/28/1989 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20235W094 | List: |
| References | |
| NUDOCS 8903100490 | |
| Download: ML20235W091 (2) | |
See also: IR 05000336/1989001
Text
,
. __ _ _ _ _ - _ -
l-
.-
.
L
e .
.. .
.FEB23jgsg
Docket No. 50-336
Northeast Nuclear Energy Corporation
ATTN: Mr. E. J. Mroczka
Senior Vice Preside'nt - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06141-0270
SUBJECT:
Inspection Number 50-336/89-01
This letter refers to the routine safety inspection conducted by Mr. B. S.
Norris of,this office on January 3-6, 1939 at the Millstone Unit 2 facility'in
Waterford, Connecticut'of activities authorized'by NRC license No.DPR-65. Mr.
Norris discussed the results of the inspection with Mr. S. E. Scace of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter.
Within these areas, the
inspection consisted'of. interviews with personnel, review of selected
procedures and records, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were observed.
However, your attention is directed to paragraph 2.9 of the enclosed report
which discusses an NRC identified concern relative to the coordination of the'
quality assurance audit and surveillance programs for Millstone Unit 2.
You
are requested to review this concern and provide a written. response within
thirty days of receipt of this letter indicating actions taken.or planned.
The~ response' requested by this letter.is not subject to the clearance
procedure of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
ft0DERTfA.GALLO
Retirt M. Gallo, CSief
Operations Branch
Division of Reactor Safety
I
Enclosure: NRC Re'gion I Inspection Report No. 50-336/89-01
D\\
ah
t \\
OFFICIAL RECOR0 COPY
IR MILLSTONE 50-336/8901 - 0001.0.0
02/24/89
h
8903100490 890228
ADOCK 05000336
Q
_ _
- - - _ _ _ _ _ - _ _ _ _ _ _
__-----
_ _ _ ,
..
.
.
'
.
.
.
,
Northeast Nuclear Energy Corp.
2
cc w/ encl:
W. D. Romberg, Vice President, Nuclear Operations
C. F. Sears, Vice President, Nuclear and Environmental Engineering
S. E. Scace, Station Superintendent
D. O. Norquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
local Public. Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resider.t Inspector
State of Connecticut
bec w/ enc 1:
Region I Docket Room (with concurrence)
Management Assistant, DRMA (w/o encl)
N. J. Blumberg, DRS
B. S. Norris, DRS
E. B. McCabe, DRP
D. H. Jaf fe, LPM, NRR
R. J. Bores, DRSS
-
RI.
RI:DRS
R.
.
Bo
tt/ja
N,o ris
ot_h
Gallo
/
9
02p/89
02/1J/89
02fk 89
l
OFFICIAL RECORD COPY
IR MILLSTONE 50-336/8901 - 0003.0.0
l
02/23/89
l
l
l
_ . _ _ _ _ _ . _ _ _ - _ - _ _ _ _ - . _ _ - -