Responds to Violations Noted in Insp Repts 50-369/87-26 & 50-370/87-26.Corrective Actions:Overtime Requirements Transmitted to All Supervision & Staff Personnel in Staff Meetings Held on 870923 & Station Directive to Be Revised
ML20235V714
Person / Time
Site: McGuire, Mcguire  
Issue date: 10/09/1987
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8710150286
Download: ML20235V714 (3)


Text

, - _....

> :l

!~

.g j

DUKE POWER GOMPANY,

P.O.'Hox 33189 ;-

j CHARLOTTE, N.C. 28242 i

w n.TucHER'

(*W "1-

wuct. man enoucuruim.

October 9,.1987 U.S. Nuclear Regulatory Comnission

DocumentLControllDesk y
Washington, D.C.

20555

Subject:

' McGuire Nuclear. Station.

Docket Nos. 50-369, -370-NRC/0IE Inspection Report Nos.

. 50-369/87-26 and 50-370/87-26

.. Gentlemen:

10CFRf 2.201, please l find attached the response to the violation Pursuant to (50-369,370/87-26-01) identified in the above referenced inspection report.

cVery truly yours, rA /

r se-Hal B. Tucker W

. SEL/144/j ge

. Attachment xet Dr. J. Nelson Grace Regional-Administrator, Region II j

.U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite'2900 Atlanta, GA-30323 Mr. Darl Hood'

'I U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.

20555 i

Mr. W.T. Orders NRC. Resident Inspector I

McGuire Nuclear Station G710150286 071009 ol L

PDR ADOCK 050 9

6 a

g

,b

3 l

DUKE POWER COMPANY McGUIRE NUCLEAR STATION RESPONSE TO VIOLATION i

Violation 50-369/87-26-01 i

Technical Specification 6.2.2.f requires that adequate shift coverage shall be maintained without routine heavy use of overtime and states that under certain circumstances when substantial amounts of overtime are required, an individual f

should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period nor more than 72. hours in any 7-day period, excluding shift turnover time.

Technical Specification 6.2.2.f requires that any deviation from the above guideline shall be authorized by the Station Manager or his deputy, or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation.

Station Directive 2.0.10, Overtime Authorization for Personnel Performing Safety Related Func-tions, Revision 2, which implements Technical Specification 6.2.2.f, requires that excessive overtime be authorized in advance and documented ou a Request j

for Work Hour Extension form.

Contrary to the above, on five occasions during the month of June 1987, individuals worked overtime in excess of the Technical Specification limit of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7-day period without the required management approval, and on numerous occasions during the months of September and October 1986, March 1987, and May through July 1987, Request for Work Hour Extension forms were I

approved after the excessive overtime had been worked.

Station Directive 2.0.10 allows the Shift Engineer on duty to approve work hour extensions, although Technical Specification 6.2.2.f requires this function to be per-(

formed by the Station Manager, his deputy, or higher levels of management.

1 i

This is a Severity Level IV violation (Supplement I).

l l

RESPONSE

1..

Admission or denial of violation:

Duke admits to the violation as stated, a

2.

Reason for the violation if admitted:

l The violation occurred because of inadequate programmatic control.

The station directive that was used to implement the program was not followed f

correctly.

I 3.

Corrective steps which have been taken and the results achieved:

l l

Overtime requirements have been transmitted to all supervision and staff l

personnel in staff meetings held on September 23, 1987.

l 4.

Corrective steps planned to avoid further violations:

a.

Revise Station Directive 2.0.10 to require the station manager or designee to give prior approval on overtime in excess of Technical Specification limit.

l l

l

.p.

y

'f(:

i

.l 1, s

j,,,' ' '4

i,
f s Page 2.

+

1/

b.:

Train' supervisors on. overtime requirements described.'in Technical Specifications and revised Station Directive 2.0.10.

J

' c.'

' Communicate ' to 'line management through a station letter the admin L').

'istrative controls on overtime.

c l

e 5. --

The date'when~ full compliance will be achieved:

. i November 2, 1987.