-_

3/4.2 POWER DISTRfBUT10N LIMITS 3/4~2.1 LINEAR' HEAT RATE'

~!

3 1J LIMITING CONDITION FOR OPERATION i;

3.2.1 The linear heat rate limit (of Figure 3.2-1) shall.be ina!ntained by one l

of the following methods as applicable; a.

Maintaining COLSS calculated core power less than or equal to COLSS calculated core power operating limit based on ' linear heat rate (when COLSS is in' service); or b.

Operating within the region of acceptable operation of Figure 3.2-la using any operable CPC channel (when COL 55 is out of service).

APPLICABILITY:

MODE 1 above 20% of RATED THERRAL POWER.

ACTION:

~

With the-linear heat rate limit not being maintained as indicated by:

L',

1.

COLSS calculated core power exceeding COLSS calculated core power operating limit based on linear heat rate; or 2.

When COLS5 is out of service, operation outside.the region of accep-l table operation in Figure 3.2-la; within 15 minutes initiate corrective action to reduce the linear heat rate to within the limits and either; a.

Restore the linear heat rate to within its limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or b.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS j

4.2.1.1 lhe provisions of Specification 4.0.4 are not applicable.

4.2.1.2 The linear heat rate shall be determined to be within its limits when THERMAL POWER is above 20% of RATED THERMAL 90WER by continuously monitoring the core power distribution with the Core Operating Limit Supervisory System (COLSS) or, with the COLSS out of service, by verf fying at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that the linear heat rate, as indicated on any OPERABLE Local Power Density channel, is within the limits shown on Figure 3.2-la.

l 4.2.1.3 At least once per 31 days, the COLSS Margin Alarm shall be verified to actuate at a THERMAL POWER level less than or equal to the core power operating limit based on kW/ft.

8710150230 871000 PDR ADOCK 050 2

P WATERFORD - UNIT 3 3/4 2-1 AMENDHENT NO. 12

N

p ;

w POWER DISTRIBUTION LIMITSL 3/4.2.4 DNBR MARGIN

, LIMITING CONDITION FOR OPERATION 3;2.4j.The DNBR margin shall be maintained by one of the following methods:

Maintaining.'COLS$ calculated core power.less than or. equal.to COLSS a.

calculated core power operating limit based on DNBR (when COLSS is

'in ' service, and either one or both CEACs are operable);; o'r b;

Mai'ntairring COLSS' calculated core power less than or equal to COLSS calculated core power' operating limit based on DNBR decreased by'.

.t 13% RATED THERMAL-POWER (when COLSS is in' service'and neither CEAC is. operable); : or

] '~

l Operating within the region of acceptable operation of Figure 3.2-2 i

c.

using any operable CPC channel (when COLSS is out of service and-either one or both CEACs are' operable); or Operating within the region of acceptable operation'of figure.3.2-3 a.

using any operable CPC channel (when COLSS is' out of service and neither CEAC is operable).

' APPLICABILITY:

MODE 1 above 20%'of RATED THERMAL POWER.

ACTION:

With the DNBR 'not being maintained:

1 L

1.

.As indicated by COLSS calculated core power exceedirgl.the appropriate COLSS calculated power operating limit; or J

2.

With COLSS out of service, operation outside the region of acceptable

]

operation of Figure 3.2-2 or 3.2-3, as applicable; l'

within 15 minutes inititate corrective action to increase the DNBR to within the limits and'either:

Rectore the DNBR to within its limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or l

a.

b.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS n

4.2.4,1 The provisions of Specification 4.0.4 are itot applicable.

4.2.4.2 The DNBR shall be determined to be within its limits when THERMAL POWER is above 20% of RATED THERMAL POWER by continuously monitoring the core

. power distribution with the Core Operating Limit Supervisory System (COLSS) or, with the COL $S out of service, by verifying at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that

~p

'the DNBR, as indicated on ar.y OPERABLE ONBR channel, is within the limit shown i

on Figure 3.2-2 or Figure 3.2-3.

g

{

I 4.2.4.3 At least ence per 31 days, the COLSS Margin Alarm shall be verified L

'to actuate at a THERF1AL POWER level less than or equal to the core power L

operating limit based on DNBR.

WATERFORD - UNIT 3 3/4 2-6 AMEN 0 MENT N0. 12

I '.

i-b

I

'4 I<

,9,

. S

.)~-

,.[

l',

I' s

w

. -] ;

i.(

.p-l

. p. )

i s

'l

.w, I

f I

NPF-38-68

' ATTACHMENT B i.

i s

1 i

1 i

1 I

1 I

N%1317

3/4.~2 POWER DISTRIBUTION tiMITS

,3/4 2.1 LINEAR HEAT RATE j

LIMITING CONDITION FOR OPER,AYION 3.2.1 The linear heat rate limit (of Figure 3.2-1) shall be maintained by one of the following methods as applicable:

a.

Maintaining COLS5 calculated core power less than or equal to COLSS calculated core power operating limit based on linear heat rate

.(when COLSS is in service); or b.

Operating within the region of acceptable operation of Figure 3.2-la using any operable CPC channel (when COLSS is out of service).

APPLICABILITY:

MODE 1 above 20% of RATED THERMAL POWER.

ACTION:

~

With t linear heat rate limit not being maintained as indicated by:

)

1.

SS cal ed cor power exceeff COLSSc!

1 ated cor / power operat' g limit b ed on lineap4 eat rate; J

g-usur e

i i

Wh COLSS i< out of serv e, operatiop utside the gion of ccep-g U

1; oper ion in Fig 3.2-la; ithin $ minute' initiate cof ctive actifrn to reduce f te linear meat r to

[

/

within the lim

  • s and eithe.

tore the li ear heat rpt$ to within

  • s limits thin 1 our, or a.

R a

b.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.1.1 The provisions of Specification 4.0.4 are not applicable.

4.2.1.2 The linear heat rate shall be determined to be within its limits when THERMAL POWER is above 20% of RATED THERMAL POWER by continuously monitoring the core power distribution with the Core Operating Limit Supervisory System (COLSS) or, with the COLSS out of service, by verifying at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that the linear heat rate, as indicated on any'0PERABLE Local Power Density channel, is within the limits shown on Figure 3.2-la.

l i

4. 2.1. 3 At least once per 31 days, the COLSS Margin Alarm shall be verified to actuate at a THERMAt POWER level less than or equal to the core power operating limit based on kW/ft.

i WATERFORD - UKIT 3 3/4 2-1 AMENDMENT NO. 12

)

g c--

q l

- ~

1

+

,l!

' INSERT 1 With the linear' heat rate' limit not being maintained as. indicated.by t,

a.

.COLSS calculated core power exceeding the COLSS calculated core power f

Hoperating= limit based on' linear heat rate, within 15 minutes initiate corrective action to reduce the linear heat rate to within the limit and either:

I i

1.

Restore the linear heat rate to within its limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or' t

l 2.

Reduce THERMAL POWER to less than or equal to 20% of RATED THERMAL POWER within the,next'6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

.l b.-

'With'the linear heat rate limit not being maintained as' indicated by

. operation,outside the region of acceptable. operation in Figure 3.2-la

~

with COLSS out of service, either:

i l

1.

Restore COLSS to service within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or

'2.

Restore-the linear heat rate to within its limits within the next 1

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />,,or

]

i 3.

Reduce THERMAL POWER to less than or equal to 20% of RATED THERMAL POWER within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

l i

1 I

I 1

l 1

. i, l

i 1

I

__2_

l J

r, l

POWER DISTRIBUTION' LIMITS l I

i 3/4.2.4 :0NBR MARGIN'

LIMITING CONDITION FOR OPERATION 4

J 3.2.4 Th'e DNBR margin shall be maintained by one of the following methods:

i Maintaining COLSS calculated core power less than or equal to COLSS a.

calculated core power operating. limit based on DNBR (when COLSS'is 1

.in service, and either one.or both CEACs are operable); or b.

' Maintaining COLSS calculated core power less'than or equal to COLSS

-calculated core power operating limit based on DNBR decreased by

.l 13% RATED THERMAL POWER.(when COLSS is-in service and neither CEACl>

~is operable); or L

Operating within the region.of acceptable operation of Figure 3.2-2 L

c.

using any operable CPC. channel (when COLSS is out of service and i-either one or both CEACs are operable); or d.

Operating within the region of acceptable operation of Figure 3.2-3 using any operable CPC channel (when COLSS is out of service and

)

neither CEAC.is operable).

APPLICABILITY:

MODE 1 above 20% of RATED THERMAL POWER.

. ACTION:

l With the.0 BR not being maintained:

)

i As indic ed by COLSS lculated core er exceeding the appropriate gff-COLSS Iculated p er operating 1 t; or j

2.

W COLSS out service, ope tion outside e region of eptable

)

peration of gure 3.2-2 or

.2-3, as appl' able; I

withi 5 minutes i ititate corre ive action to 'ncrease the BR to wit n i

the mits and ei er:

}

a.

Rest re the DNBR t within its limi s within 1 our, or l

b.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS l

4.2.4.1 The provisions of Specification 4.0.4 are not applicable.

i 4.2.4.2. The DNBR shall be determined to be within its limits when THERMAL POWER is above 20% of RATED THERMAL POWER by continuously monitoring the core power distribution with the Core Operating Limit Supervisory System (COLSS) or, with the COLSS out of service, by verifying at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that the DNBR, as indica.ed on any OPERABLE ONBR channel, is within the limit shown on Figure 3.2-2 or rigure 3.2-3.

I 4.2.4,3 At least once per 31 days, the COLSS Margin Alarm shall be verified to actuate at a THERMAL POWER level less than or equal to the core power

-operating limit based on DNBR.

WATERFORD - UNIT 3 3/4 2-6 AMENDMENT N0. 12

,(

pp:'1 b'

,.. lL.,, ' ' " '

f.

o'

& Q:L*9 W'q;;;

/f

}

1 W3 y fp 7; y A j

f"

.. ]

F.n4; M B:,

_3

,j INT m-s 3:

3 jf 'f '

4 W[,

9

' '.. S,;,

i

UN..

N.'lfi' e

y

...i'

' INSERT ~2; f;Qh.

<+

d f :S 3

, 9;;

.--l.

Vi i

i, i

m.

Lap -With..jhe.DNBR' limit-;not'being; maintained as' indicated by COLS.S'calcu l

L..

flated;corefpower exceeding the COLSS calculated; core' power operating' uj h

a>

-llimita based on DNBR, within ;15 minutes initiate' corrective action. to 4

f 2, 3: -

M i redude.the DNBR to within the limits and either:'

.;)

v.

. j ib,.

y; ~

1.a,Rectore the'DNBR to within-its limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, or q

q.

, t,0

., 2.

qReduce THERMAL POWER.to less.than or equa1 to 20% of' RATED THERMAL.

.j

~o l

-POWER within th'e:next:6 hours.

.n,

'. f'" 4 lb..

With the DNBR. limit not being maintained as indicated by operation outside-the7 region of.: acceptable operation in Figure'3.2-2 or 3.2 '

with COLSS out,of servic'e,.either

~

2 1 '.

Restore COLSS to service within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />,.or i

i'

[2.-

Restore"the DNBR'to within,its limits.within the next 2'h'ours,

' or"

?3.

ReduceLTHERMAL, POWER:to less than'or equal to 20%.of.' RATED. THERMAL 0"

POWER'within'the'next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

1,

.-y.

_.4'.'

s s-4 h

p

.1'-

}

k.. s u

1 4

i i

ih '.. 3 O.

f/'

} ((

g7

h.0 9

i i,

q

.,)

f

'1 l

\\ '(, u 1

,\\

, ' ]l:

1 4

.,