ML20235V504
| ML20235V504 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/25/1987 |
| From: | Livermore H, Rogge J, Schepens R, Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20235V464 | List: |
| References | |
| 50-425-87-36, NUDOCS 8710150200 | |
| Download: ML20235V504 (11) | |
See also: IR 05000425/1987036
Text
- - - _
_
_ _ _ .
. _ _
_
_ _ _ ,
.
Qboog]o
UNITED STATES
S
/
NUCLEAR REGULATORY COMMisslON
[
/p
REGION 11
p/ j
101 MARIETTA STREET, N.W.
j
y'
g
ATLANTA, GEORGI A 30323
I
%
,8
-
I
'
% ,+
Report Nos.: -50-425/87-36
Licensee: Georgia' Power Company
P. O. Box 4545
Atlanta, GA 30302
Docket No.: 50-425
License No.:
CPPR-109
Facility Name: Vogtle 2
.i
Inspection Conducted: July 24 - September 14, 1987
Inspectors: MM . bW(MuP<,c-
N bd a 34Ses
7/C87
1
~
H. H. Livermore, Senior Reisident
Date Signed
Inspector, Construction
N kcge, hp
.C
<xIe
6[ %[ 87
J. F. Rogge, Senior Resident
Dath Sigtfed
,
Inspector Operations
'
k.b,ke.b,epdM
f
C
LLb
N.,87
R. J. Schepens, Resident )
Date Signed
I
pector Operations
7[)C57
Approved by:_
%
M. V. Sinkule, Section Chief
Date Signe'd
Division of Reactor Projects
SUMMARY
Scope:
This routine, unannounced inspection entailed Resident Inspection in
the following areas:
fire protection, containment and safety related
structures, piping systems and supports, safety related components, electrical
equipment and cables, instrumentation, and preoperational test programs.
Results:
One violation was identified involving " Failure to Follow Procedures
for Quality Control (QC) Inspection of Mechanical Equipment," Paragraph 11.
j
1
l
i
8710150200 h h 25
PDn
ADOCK
!
,
G
.
_ _ - _
_
-
_ - _ -
- _ _ _ _ .
._
_
!
.
.
'
-
l
.
w
',
i
'
. REPORT DETAILS-
- 1.
Persons Contacted-
Licensee Employees
- P. D.. Rice; Vice. President,.Vogtle Project Director
)
~ R. H. Pinson, Vice President, Project. Construction
C. W. Whitney, General Manager, Project Support
i
R. M. Bellamy, Quality Assurance Manager, Corporate
,
C. W. Hayes, Vogtle Quality Assurance Site Manager.- Construction
i
.
'
- D. M. Fiquett, Project Construction Manager -' Unit 2
l
2*G. A. .McCarley, Project Compliance Coordinator.
C.L.'Coursey,McintenanceSuperintendent(Startup)
i
M. P. Craven, Nuclear Security Manager
1
'
- H. M.:Handfinger, Project Start-up Support Manager
F. D. Kuester, Project Field. Engineering
8
J.-A. Bailey, Project Licensing Manager
A. :W. Harrelson, Construction Electrical Manager
.:
C.-W. Rau, Construction Mechanical Manager
L. N. Brooks, Construction. Civil Manager
L.
B.' Gleen, Quality Control Manager.
l
- R. C. Soomerfield, Readiness Review
i
- J. J. Gilmartin, Engineering Supervisor
l
'*S. M. Hall, S/V Procedures Support
'
.
- M. Horton, Test Engineering Support
!
'
?
'*R. W. McManus, Readiness Review Manager
'J. E. Sanders, Assistant Project Manager
.W. C..Ramsey,. Project Engineering Manager
L. D. Harless,: Manager, Quality Concerns
D. Janecki, Quality Concerns
'
W. C. Lyon, Quality Concerns
I
S. D. Haltom, Quality Assurance
{
R. Folker, Quality Assurance Engineer
'
Other licensee employees contacted included craftsmen, technicians,
engineers inspectors, and office personnel.
1
Other Organizations
1
D. W Smith, Support Nuclear Operations 01gethrope Power Corporation
C. Markham, Westinghouse Project Manager
D. L. Kinnsch, Project Engineering - Bechtel
i
T. E. Richardson, Project Engineering Manager - Bechtel
B. Edwards, Site Manager, Pullman Power Products (PPP)
- J. E. Miller, Qut.lity Aassurance Manager, PPP
- Attended exit ~ interview
,
f
1
.
__
_
r,
i
.
2
2.
Exit Interviews - Unit 2(30703C)
The inspection scope and-findings were summarized on September 14, 1987,
with those persons indicated in paragraph 1 above.
The inspector
described the areas inspected and discussed in detail the inspection
findings.
No dissenting comments were received from the licensee.
The
licensee did not identify as proprietary any of the materials provided to
or reviewed by the inspector during this inspection.
Region based NRC
exit interviews 'were attended during the inspection period by a resident
inspector.
3.
Licensee Action on Previons Enforcement Matters - Unit 2(92702)
Not inspected.
4.
Unresolved Items - Unit 2
Unresolved Items are a matter about which more information is required to
'
determine whether it is acceptable or may involve a violations or
deviations.
No unresolved items were identified during this inspection
-period.
I
5.
General Construction Inspection - Unit 2(92706)
' Periodic random surveillance inspections were made throughout this
reporting period in the form of general type inspections in different area
of the facility.
The areas were selected on the basis of the scheduled
activities and were varied to provide wide coverage.
Observations were
made of activities in progress to note defective items or items of
noncompliance with the required codes and regulatory requirements.
On-
these inspections, particular note was made of the presence of quality
control inspectors, supervisors, and quality control evidence in the form
of available process sheets, drawings, material identification, material
protection, performance of tests, and housekeeping.
Interviews were
ccnducted with craft personnel, supervisors coordinators, quality control
inspectors, and others as they were available in the work areas.
The
inspector reviewed numerous construction deviation reports to determine if
requirements were met in the areas of documentation, action to resolve,
justification, and approval signatures in accordance with Georgia Power
Company (GPC) Field Procedure No. GF-T-01.
,
No violations or deviations were identified.
6.
Fire Prevention / Protection and Housekeeping Measures - Unit 2 (42051C)
The inspector observed fire prevention / protection measures throughout the
inspection period.
Welders were using welding permits with fire watches
and extinguishers.
Fire fighting couipment was in its designated areas
throughout the plant.
1
i
l
-
._
7
.
,.
3
The inspector reviewed and examined portions of procedures pertaining to
the fire prevention / protection measures and housekeeping measures to
!
determine whether they comply with applicable codes, standards, NRC
'
Regulatory Guides, and licensee comitmeats.
i
The inspector observed' fire prevention / protection measures in work areas
containing safety related equipment during the inspection period to verify
the following:
Combustible waste material and rubbish was removed from the work
-
areas as rapidly as practicable to avoid unnecessary accumulation of
'
combustibles.
Flammable -liquids were stored in appropriate containers and in
-
designated areas throughout the plant.
Cutting and welding operations in progress have been authorized by an
-
appropriate permit, combustible have been moved away or safely
covered, and a fire watch and extinguisher was posted as required.
Fire protection / suppression equipment was provided and controlled in
-
accordance with applicable requirements.
No violations or deviations were identified.
7.
Structural Concrete - Unit 2 (47053C)
a.
Procedure and Document Review
The inspector reviewed and examined portions of the following
procedures pertaining to the placement of concrete to determine
whether they comply with applicable codes, standards, NRC Regulatory
Guides, and licensee commitments.
-CD-T-02, Concrete Quality Control
-CD-T-06, Rebar and Cadweld Quality Control
k
-CD-T-07, Embed Installation and Inspection
b.
Inspector witnessed portiens of the concrete placement indicated
J
below to verify the following:
(1)
Forms were properly placed, secure, leak tight, and clean.
Rebar and other embedment installation was installed in
-
accordance with construction specifications and drawings,
secured, free of concrete and excessive rust, specified
distance from forms, proper on-site rebar bending (where
applicable), and clearances consistent with aggregate size.
(2) Delivery, Placement, and Curing
)
Replacement inspection was completed and approved prior to
-
placement utilizing a Pour Card.
-. _ _ _ _ _ _ _ _
_
_
'
.
S
4
Construction joints were prepared as specified.
-
Proper mix was specified and delivered.
-
Temperature control of. the mix, mating surfaces, and
1
-
'Hbient were monitored,
i
.
Consolidation was performed correctly.
-
Testing at placement location was properly performed in
-
accordance with the acceptance criteria and recorded on a
j
Concrete Placement Pour Log.
l
Adequate crew equipment, and techniques were utilized.
-
Inspections during placements were conducted effectively by
)
-
a_ sufficient number of qualified personnel.
. Curing methods and temperature was monitored.
-
No violations or deviations were identified.
8.
Safety Related Piping - Unit 2(49063C)
Periodic inspections were conducted to observe construction activities of
the Reactor Coolant Boundary and other safety-related piping installations
inside and outside Containments.
Verifications included but were not
{
limited to the following:
1
Material and components were being properly handled and stored in
1
-
order to prevent damage.
J
l
Fit-ups and alignments were within tolerances per specifications arid
j
-
drawings.
{
Specified clearances from pipe to pipe and adjacent components were
)
-
met.
J
Piping was installed and inspected in accordance with applicable
-
drawings, specifications, and procedures.
Those people engaged in the activity are oualified to perform the
-
applicable function.
Drawing and specification changes (revisions) are being handled and
-
used correctly.
l
No violations or deviations were identified.
9.
Safety Related Piping Welding - Unit 2(55083C)
Periodic inspections were conducted during daily plant surveillance on
safety-related pipe welding at various stages of weld completion.
The
i
4
_ - _ , _ _ _ _ - _ - _
_ - -
--
-_
_.
-
-.
_
_ - -
___
__
i
..
5-
purpose of the inspection was to determine whether the requirements of
applicable; specifications', codes, standards, work performance procedures,
.and Quality Control (QC) procedures are being met as follows:
WorkJ was conducted. inTaccordance. with a process sheet which
i
--
identifies the weid' and >1ts location by system, references,
. procedures, or instructions and which provides for production'and QC
c
signoffs.
,
Welding procedures, detailed drawings, and. instructions were readily
-
availcble in the immediate work area and technically adequate for the,
welds being made.
. elding procedure specifications (WPS) were in accordance with the
W
-
applicable Code requirements and that, a Procedure Qualification-
Record (PQR) .is referenced and exists for the type' of weld being
made..
Base' metals, welding filler materials, fluxes, gases, and insert -
1
-
materials' were of the specified type and grade, have been properly
inspected and . tested, and were . traceable to ' test reports or
certifications.
Purge and/or shielding. gas flow and composition were as specified in
-
the welding pecedure specification, and protection was provided to
shield the welding operation from adverse environmental conditions.
Weld joint geometry includirg pipe wall thickness was specified and
-
4
1
that surfaces to be welded have been prepared, cleared, and inspected
in accordance with applicable procedures or instructions,
f
!
A sufficient number of adequately qualified QA and QC inspection
-
personnel were present at the work site, commensurate with the work
in progress.
The weld area cleanliness was maintained and that pipe alignment and
-
fit-up tolerances were within specified limits.
Weld filler material being used was in accordance with welding
--
specifications, unused filler material was separated from other types
I
of material and was stored properly, and weld rod stubs were properly
+
removed form the work location.
There were no evident signs of cracks, excessive heat input,
-
' sugaring, or excessive crown on welds.
'
Welders were qualified to the applicable process and thickness, and
-
necessary controls and records were in place.
No violations or deviations were identified.
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ - _ _ _
.
6
10. Reactor Integrated Head Package and Internals - Unit 2
,
l
The inspection consisted of examinations of the Reactor Vessel installed
in containment, the Reactor Vessel head with the installed control rod
drive mechanisms that are located on the refueling floor, and the upper
internals in their designated laydown area.
Inspections also determined
that proper storage protection practices were in place and that entry of
foreign objects and debris was prevented. During this inspection period,
the inspector also monitored a fit check installation of the reactor
vessel head and the reactor vessel.
No violations or deviations were identified.
11. Safety Related Components
'Jnit 2(50073C)
The inspection consisted of plant tours to observe storage, handling, and
protection; installation; and preventive maintenance of safety-related
l
components to determine that work is being performed in accordance with
j
applicable codes. NRC Regulatory Guides, and licensee commitments.
l
l
)
l
The areas listed below were randomly inspected at various times during the
l
inspecticn period to verify the following as applicable:
Storege, environment, and protection of components were in accordance
.
!
-
with manufacturer's instructions and/or established procedures.
l
Implementation of special storage and maintenance requirements such
-
as:
rotation of motors, pumps, lubrication, insulation testing
(electrical), cleanliness,etc.
Performance of licensee / contractor surveillance activities and
-
documentation thereof was being accomplished.
,
Installation requirements were met such as:
proper location,
i
-
placement, orientation, alignment, mounting (torquing of bolts and
expansion anchors), flow direction, tolerances, and expansion
clearance.
Appropriate stamps, tags, markings., etc. were in use to prevent
-
oversight of required inspections, completion of tests, acceptance,
and the prevention of inadvertent operation,
i
Safety-Related piping, valves, pumps heat exchangers, and instrumentation
were inspected on a random sampling basis throughout the plant.
'
On July 30, 1987, the inspector conducted a followup inspection of field
.
'
process sheets 2-1208-P6-002 and 2-1208-P6-003 which documented the change
out of the two piece balance drum locknut per FEC0 N-99-BF on the train
"A"
and "B" centrifu
The inspector reviewed Pullman
Power Products (PPP) gal charging pumps.
procedure IX-48, " Equipment Installation." Paragraph
7.1 of PPP procedure IX-48 states in part that QC is responsible for
verification of items that fall within the scope of ASME (I.E. NF bolting,
pressure boundary bolting, etc...).
The field engineer is responsible for
N_____-___________-_____
-
_ _ _ _ _ _ _
_
j
.
I
7
j
1
verification of other items, including cleanliness inspections (all codes)
!
during installation. A review of PPP procedure X-11, " Visual Inspection,"
l
was also conducted.
Paragraph 3.1 of PPP procedure X-11 states in part
I
that certification of all personnel performing general visual inspection
i
shall be in accordance with ANSI N.45.2.6 and PPP QA procedure II-4,
)
entitled " Inspection and Test Personnel." The inspector determined that a
i
control inspector was not utilized to document inspections of the work
performed on the centrifugal charging pumps which are ASME safety-related
,
equipment and that the field engineer who signed-off the process sheets in
'
the block (hold for PPP inspector) was neither a QC inspector nor was the
individual certified for performing visual inspections. This matter will
be identified as violation 50-425/87-36-01, " Failure to Follow
Procedures."
During the above inspection the inspector also identified the following
concerns:
1) PPP field process sheets contain one block for PPP
inspectors to sign for hold points.
The above item has identified that
field engineers also sign-off in the block for their hold points.
Since
,
there is only a check in the block for a hold point it is left up to
1
personnel
in field to decide whether the check is for a quality control
l
or held engineer hold point. These two types of check offs should be made
distinguishable.
2.) PPP procedure 1X-48, paragraph 7.1, states in part
that QC is responsible for verification of items that fall within the
scope of ASME (i.e. NF bolting, pressure boundary, etc.).
PPP procedure
IX-5, " Bolting Procedure," paragraph 6.3.2, states in part that the field
engineer shall inspect the bolted connection prior to torquing to enture
flange alignment is acceptable and shall verify that the recommended
,
i
torquing sequence is followed and that the torque reached is in accordance
with recommended values.
Also, discussions with QC inspectors in the
field
confirmed that they are not required to verify torquing of ASME
pressure boundary pipe.
The above two PPP procedures appear to be in
conflict with one another regarding QC's function to inspect torquing of
ASME pressure boundary pipe.
3). QC and field engineering are both using
a single checklist for recording their inspection results or verifications
by initials in the same columns titled "PPP Inspection and date," making
it appear to a reviewer that QC had inspected each line item, whereas they
had not.
12. Safety Related Pipe Support and Restraint System - Unit 2(500900)
Periodic random inspections were conducted during the inspection period to
observe construction activities during installation of safety-related pipe
supports to determine that the following work was performed in accordance
with applicable codes, NRC Regulatory Guides, and licensee commitments:
Spring hangers were provided with indicators to show the approximate
-
" hot" or "coldd position, as appropriate.
I
No deformation of forced bending was evident.
-
Where pipe clamps are used to support vertical lines, shear lugs were
-
welded to the pipe (if required by Installation Drawings) to prevent
slippage.
l
{
l
__ __-
.
l
,
1
-
L
i
.
,
!
8
Sliding- or rolling supports were provided with material and/or
-
l.
lubricants suitable for the environment and compatible with sliding
l
contact surfaces.
'
D
D
Supports are located and installed as specified.
--
The surface of welds meet applicable; code requirements and are free
4
-
from unacceptable grooves, abrupt ridges, valleys, undercuts, cracks,
i
. discontinuities, or other indications which can be observed on the
welded surface..
No ' violations or deviations were identified.
13.
Electrical and Instrumentation Components and Systems - Unit 2 (51053C)
(52153C)
Periodic inspections were conducted during the inspection period to
observe safety-related electrical equipment-in order to verify that the
storage, installation, and preventive maintenance was accomplished in
accordance with applicable codes, NRC Regulatory Guides, and licensee
commitments..
' During' the inspection period, inspections were performed on various. pieces
of electrical equipment during storage, installation, and cable
terminating phase in order to verify the following as applicable:
Location and alignment
-
Type and size of anchor bolts
-
Identification
-
Segregation and identification of nonconforming items
-
Location, separation, and redundancy requirements
-
-
Equipment space heating
~
Cable identification
-
. Proper lugs used
-
Condition of wire (not nicked, etc.), tightness of connection
-
Bending radius not exceeded
-
Cable entry to terminal point
-
Separation
-
No violations or deviations were identified.
14.
Electrical and Instrumentation Cables and Terminations - Unit 2 (51063C)
(52063C)
a.
Raceway / Cable Installation
The inspector reviewed and examined portions of the following
,
procedures pertaining to raceway / cable installation to determine
whether they comply with applicable codes, NRC Regulatory Guides, and
'
'
licensee commitments.
-ED-T-02, Raceway Installation
-ED-T-07, Cable Installation
- _ _ _ _
_ - _ _ _ _ _ -
- - - - -
_ _ _ _ _ .
._
_
_.
_
_ _ - _ _ _ _ _ -
__ _ _ _ _ _ _ _ _
_
~
.
!
9
Periodic inspections were conducted to observe construction
activities of Safety Related Raceway /Cabic Installation.
In reference to the raceway installation, the following areas were
inspected to verify compliance with the applicable requirements:
Identification
-
Alignment
-
Bushings (Condait)
-
Grounding
-
Supports and Anchorages
-
In reference to the cable installation the following areas were
inspected to verify compliance with the applicable requirements:
Protection from adjacent construction activities (welding, etc.)
-
Coiled cable ends properly secured
-
Non-terminated cable ends taped
-
Cable trays, junction boxes, etc., reasonably frees of debris
-
Conduit capped, if no cable installed
-
Cable supported
-
Bend radius not exceeded
-
-
Separation
b.
Cable Terminations
The inspector reviewed and examined portions of the following
procedures pertaining to cable termination to determine whether they
comply with applicable' codes, NRC Regulatory Guides, and licensee
conr11tments .
-ED-T-08, Cable Termination
In reference to cable terminations the following areas were inspected
to verify compliance with the applicable requirements:
l
Cable identification
-
Proper lugs used
--
Condition of wire (not nicked, etc.)
l
-
Tightness of connection
-
Bending radius not exceeded
-
Cable entry to terminal point
-
Separation
-
No violations or deviations were identified.
15. Containment and Other Safety Related Structural Steel Welding - Unit 2
(55053C0(55063C)
Periodic inspections were conducted during daily plant surveillance on
safety-related steel welding at various stages of weld completion.
The
purpose of the inspection was to determine whether the requirements of
. . . . .
_ _ _ _ _
_.
!
i
.
'
10
applicable specifications, codes, standards, work performance procedures
.
and QC procedures are being met as follows:
l
Work was conducted in accordance with a process sheet or drawings
4
-
which identified the weld and its location by system, references,
j
procedures, or instructions and which provides for production and/or
l
QC signoffs.
!
1
Welding procedures, detailed drawings, and instructions were readily
.
available in the immediate work area and technically adequate for the
welds being made.
Welding procedure specifications (WPS) were in accordance with the
I
-
applicable Code requirements and that a Procedure Qualification
Record (PQR) is referenced and exists for the type of weld being
made.
-
Base metals and welding filler materials were of the specified type
and grade, were properly inspected, tested, and were traceable.
Protection was provided to shield the welding operation from adverse
-
environmental conditions.
Weld joint geometry including thickness was specified and that
-
surfaces to be welded were prepared, cleaned, and inspected in
accordance with applicable procedures or instructions.
A sufficient number of adequately qualified QA and QC inspection
l
-
personnel commensurate with the work in progress were present at the
work site.
Weld are cleanliness was maintained and that alignment and fit-up
-
tolerances were within specified limits.
!
l
Weld filler material being used was in accordance with welding
!
-
specifications, unused filler material was separated from other types
of material and was stored and controlled properly, and stubs were
4
properly removed from the work location.
There were not visual signs of cracks, excessive heat input, or
-
excessive crown on welds.
Welders were qualified to the particular process and thickness, and
-
necessary controls and records were in place.
No violations or deviations were identified.
m_.___
_ _ _ _ _ _