ML20235U798
| ML20235U798 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 10/05/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML20235U802 | List: |
| References | |
| EA-87-152, NUDOCS 8710140265 | |
| Download: ML20235U798 (2) | |
See also: IR 05000338/1987024
Text
_
_
Y h()TU
- '
o
OCT 0 51987
!
Docket No. 50-338
License No. NPF-4
EA 87-152
Virginia Electric and Power Company
ATTN: Mr. W. L. Stewart, Vice President,
Nuclear Operations
Post Office Box 26666
Richmond, Virginia 23261
Gentlemen:
SUBJECT:
(NRC AUGMENTED INSPECTION TEAM REPORT NOS. 50-338/87-24 AND
50-339/87-24)
This refers to the Nuclear Regulatory Commission (NRC) augmented inspection
conducted by Floyd S. Cantrell on July 15 - August 14, 1987.
The inspection
included a review of activities associated with the Unit 1 steam generator tube
rupture at the' North Anna facility. The report documenting this inspection was
sent to you with a letter dated August 28, 1987.
The violations described in the enclosed Notice of Violation involve a failure
.
to perform the actions of an alarm response procedure, a failure to take
corrective action prior to restoring a failed radiation monitor, a failure
to conduct.a safety committee review of abnormal conditions prior to restart,
and a failure to perform adequate channel and source checks of a radiation
monitor.
In accordance with the " General Statement of Policy and Procedure for NRC
Enforcement Act' ions," 10 CFR Part 2, Appendix C (1987), the violations
described in the enclosed Notice have been classified as Severity Level IV
violations.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including jour proposed corrective actions and the results of future
I
inspections, the NPC will determine whether further NRC enforcement action is
I
necessary to ensure compliance with NRC regulatory requirements.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
h NN
8
i
j-
,
p
,
a
$
3 601
-_
, _ _ _ _ - - _ - - - .
f
- -
1
OCT 051987
Virginia Electric and Power Company
-2-
l
\\
.
Should you have any questions concerning this letter, please contact us.
l
'
l
Sincerely,
j
Original signed by Mal Ernst/for
J. Nelson Grace
Regional Administrator
Enclosure:
cc w/ enc 1:
E. W. Harrell, Station Manager
N. E. Hardwick Manager - Nuclear
Programs and Licensing
bec w/ enc 1:
NRC Senior Resident Inspector
Commonwealth of Virginia
Document Control Desk
A. F. Gibson, DRS/RII
L. A. Reyes, DRP/RII
J. Lieberman, OE:HQ
G. R. Jenkins, EICS/RII
f
gp !p
RI
RII
RII
-
'ng
RII
/
i
AFGib on
1 yes
C
nkins
berman
10/@87
l'/.3/87
10/A/87
.10/p87
lo/f/87
_ _ - _ _ _ _ _