ML20235U481
| ML20235U481 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/21/1989 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8903090221 | |
| Download: ML20235U481 (2) | |
Text
~
WASHINGTON PUBUC POWER SUPPLY SYSTEM '
SAFEGUARDS INF ' ATION (ICCFR73.21)
LOCKED GE REQUIRED WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
- 3000 George Washington Way
- Richland, Washington 99352 February 21, 1989 Docket No. 50-397 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-2 PHYSICAL SECURITY PLAN, REVISION 13 Enclosed please find the subject document revision.
The revision describes changes made as a result of comments contained in NRC letter,
Subject:
Regional Transfer of 50.54(p) Submittal for Washington Public Power Suply System Nuclear Project, Unit 2, dated January 31, 1989.
The enclosure is submitted pursuant to 10CFR 50.54(p) and does not decrease the safeguards effectiveness of the approved plan.
The enclosure contains Safeguards Information concerning security measures for the physical protection of Supply System facilities in which special nuclear material is used. This information is to be protected in accordance with 10CFR 73.21.
Should you have any questions concerning this submittal, please do not hesitate to contact me.
G. C.
orensen, Manager Regulatory Programs
Enclosure:
Revision 13, WNP-2 Physical Security Plan (3 copies) cc:
C. J. Bosted, Senior Resident Inspector, Nuclear Regulatory Commission (w/o attachment)
N. S. Reynolds, B. C. P. and R. (w/o attachment)
D. L. Williams, Bonneville Power Administration (w/o attachment)
R. B. Samworth, Nuclear Regulatory Commission (w/o attachment)
L. Norderhaug, Nuclear Regulatory Commission (2 copies with attachment)
THC FACI UZiEOLLED V/GEi!
g63 j@j@k$$@$
7 SEPARATED fi;0M Li;CL0Ei.3.
WASHINGTON PUBUC POWER SUPPLY SYSTEM
[
SAFEGUARDS INFORMATION (10CFR73.21)
I
___ _______--_ mmewa ernuern_-------- - - - -
l
='
4, STATE OF WASHINGTON)
Subject:
[ k?/ N
)
COUNTY OF BENTON
)
I, G.
C. ' Sorensen, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have: reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.
The enclosure contains Safeguards Information concerning security measures for the physical protection of Supply System facilities in which special nuclear material is used.
This information is to be protected in accordance with 10CFR 73.21.
DATE 3 ////w,1989 e 4 ex<-
G. C. fy6rensen, Manager Regulatory Programs On'this day personally appeared before me G. D. Bouchey to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this 3 el day of /T)uc1 1989.
1 SA9 IL.
O b^
Notary 'Fubli~c in and'for ths STATE OF WASHINGTON Residing at /
d, /u/, b/A My commission' expires 7/14791 l
_ - _ _ _ _ _ _ _ _ - _ _ _