Confirms 871214 Reactor Operator & Senior Reactor Operator Licensing Exams on 871214,per 870904 Meeting.Util Should Furnish Approved Ref Matl Listed in Attachment 1 by 871019. Requirements & NRC Rules & Guidelines for Exams Encl
ML20235U457
Person / Time
Site: Millstone 
Issue date: 10/02/1987
From: Keller R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8710140100
Download: ML20235U457 (10)


Text

- - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ -.

ScT OCT 2W l

1 l

.f Docket No.

50-423 Norineast Nuclear Energy Company Attni Mr. E. J. Mroczka 3

l Senior Vice President - Nuclear Engineering and Operations Group i

P.O. Box 270 Hartford, CT 06141-0270 Gentlemen:

Subject:

Reactor Operator and Senior Reactor Operator Licensing Examinations At a meeting held on September 4,1987, Mr. R. Stotts, Training Coordinator, and Mr. R. Temps, Examiner, discussed arrangements for the administration of exaninetions at Millstone Unit 3 during the week of December 14, 1987.

l As we already have a complete set of your facilities' reference material from the August 1987 examinations, it was decided that for the December 1987 examinations, Mr. Stotts would only send Mr. Temps updates or changes to the i

l

/

reference material.

Mr. Stotts was also informed that one complete set of i

reference materials would be required for an NRC contractor.

In order to meet l

the scheduled examination date, it will be necessary for the facility to l

furnish the approved reference material listed in Attachment 1 " Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Written Examinations," by October 19, 1987, to the contractor.

With regard to the updated materials to be sent to Mr. Temps, any changes to materials listed in l since the August 1987 examinations should be included in the update and should also be sent by October 19, 1987.

The facility management is responsible for providing adequate space and f acilities in order to properly conduct the written examinations.,

" Administration of Reactor / Senior Reactor Operator Licensing Written Examina-tions," describes our requirements for conducting these examinations.

In addition, to better document simulator examinations, the chief examiner will have the facility simulator operator record prespecified plant conditions (i.e.,

plant pressures, temperatures and levels, etc.) for each simulator scenario.

The candidate will be responsible for providing this information along with any appeal of his simulator operating examination. Therefore, the f ac '. l i ty training staff should retain the simulator examination scenario information until all candidates taking the examination have either passed the operating examination or all appeals filed by the candidates who failed the operating examination have been completed.

8710140100 e'71002 PDR ADOCK 05000423 V

PDR W

l A

0FFICIAL RECORD COPY OL 90 MILL 3 - 0001.0.0

[j 10/02/87

)

Northeast Nuclear Energy 2

Company 1 also contains the rules and guidance that will be in effect during the administration of the written examination.

The facility management is responsible for ensuring that all candidates are aware of these rules.

]

All reactor operator and senior reactor operator license applications should normally be submitted at least 30 days before the first examination date so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligibility has been determined.

If the applications are not received at least two weeks before the examination dates, it is likely that a postponement will be necessary.

This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden and duplication may be directed to the Office of Management and

Budget, Reports Management Room
3208, New Executive Office
Building, Washington, D.C. 20503.

j The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4,

" Requirements for Facility Review of Written Examination."

Thank you for your consideration in this matter.

If yoa have any questions regarding the examination procedures and requi rerr ents,

please contact Mr. Robert Keller, Chief, PWR Section at (215) 337-5211.

Sincerely, j

OrIgir.t.1 Sicuc d 3Y 8 Robert M. Keller, Chief Pressurized Water Reactor Section Operations Branch, DRS

)

Enclosures:

1.

Reference Material Requirements for Reactor / Senior Reactor

)

Operator Licensing Examinations 2.

Requirements for Administration of Written Examinations 3.

NRC Rules and Guidelines for License Examinations 4.

Facility Review Requirements cc w/ enclosures:

S. E. Scace, Station Superintendent R. Stotts, Training Manager 1

NRC Resident Inspector I

I l

i 0FFICIAL RECORD COPY OL 90 MILL 3 - 0002.0.0..

10/02/87

)

i i

Northeast Nuclear Energy 3

Company bcc w/ encl:

DRP Section Chief R. Temps, DRS Chief Examiner Chief, OLB, NRR OL File RI:DRS RI:@S T ps Kel ly 10/L /87 10

/87 0FFICIAL RECORD COPY OL 90 MILL 3 - 0003.0.0 10/02/87

ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR j

OPERATOR LICENSING EXAMINATIONS 1.

Existing learning objectives and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermo-dynamics,etc.).

Training materials should include all substantive written material used for preparing candidates for initial R0 and SRO licensing. The written material should be inclusive of learning ' objectives and the details pre-sented during lecture, rather than outlines. Training materials should be identified by plant and unit, bound, and indexed.

Failure to provide complete properly bound and indexed plant reference material may result in canceling and rescheduling of the examinations.

Training materials which include the following should be provided:

System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation.

Sys-tem training material should draw parallels to the actual procedures used for operating the applicable system.

Complete and operationally useful descriptions of all safety-system interactions and, where tvailable, BOP system interactions under emergency and abnormal cor.ditions, including consequences of anti-cipated operator error, maintenance error, and equipment failure.

Training material used to clarify and strengthen understanding of emergency operating procedures.

Comprehensive theory material that includes fundamentals in the area of theory of reactor operation, thermodynamics, heat transfer and fluid flow, as well as specific application to actual in plant components. For example, mechanical theory material on pumps should include pump theory as well as descriptions of how these ' principles actually apply to major plant pumps and the systems in which they are installed (i.e.,

ECCS pumps, Feedwater pumps).

Reactor Theory material should include descriptions that draw explicit ties between the fundamentals and the actual operating limits followed in the plant (i.e., reactor theory material should contain explanations how principles relate to the actual curves used by operators to verify shutdown margin).

2.

Procedure Index (alphabetical by subject) 3.

All Administrative Procedures (as applicable to reactor operation or safety) 0FFICIAL RECORD COPY OL 90 MILL 3 - 0005.0.0 10/02/87

l 2

4.

All integrated plant procedures (normal or general operating procedures) 5.

Emergency procedures (emergency instructions, abnormal-or special procedures) l 6.

Standing orders (important orders that are safety related and may super-I sede the regular procedures) 7.

Fuel-handling and core-loading procedures (initial core-loading procedure, when appropriate) 8.

Annunciator procedures (alarm procedures, including set points) 9.

Radiation Protection Manual (radiation control manual or procedures) 10.

Emergency Plan implementing procedures

11. Technical Specifications 12.

System Operating Procedures 13.

Piping and Instrumentation diagrams, electrical single-line diagrams, or i

flow diagrams j

14. Technical Data Book, and/or Plant curve information as used by operators and facility precautions, limitations, and set points (PLS) for the facility
15. Questions and answers that licensee has prepared (voluntary by licensee) 16.

The following on the plant reference simulator (not applicable to non-power facilities) a.

List of all readily available initialization points.

b.

List of all preset malfunctions with a clear identification number.

The list should include cause and effect information.

Specifically, for each malfunction a concise description of the expected result, or range of results, that will occur upon implementation should be.

provided.

Additionally, an indication of which annunciators are to be initially expected should be given.

1 l

c.

A description of simulator failure capabilities for valves, breakers, l

indicators and alarms.

J d.

Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction should be provided, i.e.,

ability to vary the size of a given LOCA or steam leak, or the abil-ity to cause a slow failure of a component such as a feed pump, tur-bine generator or major valve.

0FFICIAL RECORD COPY OL 90 MILL 3 - 0005.1.0 10/02/87 l

3 e.

An indication of modeling conditions / problems' that may impact the examination.

f.

-Identification of any known Performance Test Failures not yet completed.

1 g.

Identification of significant differences between the simulator and I

the control room.

h.

Copies of_ facility generated scenarios that expose candidates to j

- situations of degraded pressure control (PWR), degraded heat removal capability (PWR and BWR) and containment challenges (BWR) may be provided (voluntary by licensee).

i.

Simulator instructions manual (voluntary by licensee).

j.

Description of the scenarios. used for the training class (voluntary by licensee).

j 1

17. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations.

The above reference material should be approved, final issues and should be so marked. If a plant has not finalized some of the material, the chief examiner shall verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.

All procedures and reference material should be bound with appropriate indexes or tables of contents so that they can be used efficiently.

OFFICIAL RECORD COPY OL 90 MILL 3 - 0006.0.0 10/02/87

ENCLOSURE 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS 1.

A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the written examination.

If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building.

Obtaining this room is the responsibility of the licensee.

2.

Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with a three foot space between tables.

No wall charts, models, and/or other training materials shall be present in the examination room.

3.

Suitable arrangement shall be made by the facility if the candidates are to have lunch, coffee, or other refreshments.

These arrangements shall comply with Item 1 above.

These arrangements shall be reviewed by the examiner and/or proctor.

4.

The facility staf f shall be provided a copy of the written examination and answer key af ter the last candidate has completed and handed in his writ-ten examination.

The facility staff shall then have five working days to provide formal written comments with supporting documentation on the examination and answer key to the chief examiner or to the regional office section chief.

5.

The licensee shall provide pads of 8-1/2 by 11 in. lined paper in unopened packages for each candidate's. use in completing the examination.

The examiner shall distribute these pads.to the candidates.

All reference material needed. to complete the examination shall be furnished by the examiner. Candidates can bring pens, pencils, calculators, or rulers into the examination room, and no other equipment or reference material shall be allowed.

6.

Only black ink or dark pencil should be used for writing answers to i

questions.

0FFICIAL RECORD COPY OL 90 MILL 3 - 0008.0.0 10/02/87 I

l

1 i

i 1

i i

ENCLOSURE 3 NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:

)

1 1.

Cheating on the examination means an U tomatic denial of your application I

and could result in more severe penalties.

2.

Restroom trips are to be limited and only one candidate at a time may l

i leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.

3.

Use black ink or dark pencil only to facilitate legible reproductions.

4.

Print your name in the blank provided on the cover sheet of the examination.

5.

Fill in the date on the cover sheet of the examination (if necessary).

6.

Use only paper provided for answers.

l 7.

Print your name or initials in the upper right-hand corner of the first page of each page of the answer sheet.

8.

Consecutively number each answer sheet, write "End of Category _" as appropriate, start each category on a new page, write on only pn_e side of the paper, and write "Last Page" on the last answer sheet.

I 9.

Number each answer as to category and number, for example, 1.4, 6.3.

10.

Skip at least three lines between each answer.

11.

Separate answer sheets from pad and place finished answer sheets face down on your desk or table.

12.

Use abbreviations only if they are commonly used in facility literature.

13. The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.

14.

Show all calculations, methods, or assumptions used to obtain an answer to mathematical problems whether indicated in the question or not.

15.

Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION AND DO NOT LEAVE ANY ANSWER BLANK.

16.

If parts of the examination are not clear as to intent, ask questions of the examiner only.

1 0FFICIAL RECORD COPY OL 90 MILL 3 - 0009.0.0 10/02/87 1

{

2

17. You must sign the statement on the cover sheet that indicates that the work is your own and you have not received or been given assistance in completing the examination. This must ba done after the examination has been completed.
18. When you complete your examination, you shall:

a.

Assemble your examination as follows:

(1) Exam questions on top.

(2) Exam aides - figures, tables, etc.

(3) Answer pages including figures which are a part of the answer.

b.

Turn in your copy of the examination and all pages used to answer the examination questions.

c.

Turn in all scrap paper and the balance of the paper that you did not use for answering the questions.

d.

Leave the examination area, as defined by the examiner.

If after leaving, you are found in this area while the examination is still in progress, your license may be denied or revoked.

OFFICIAL PECORD C0pY OL 90 MILL 3 - 0010.0.0 10/02/87

p ENCLOSURE 4 REQUIREMENTS FOR FACILITY REVIEW OF WRITTEN EXAMINATION 1.

There shall be no review of the written examination by the facility staff before or during the administration of the examination.

Following the administration of the written examination, the facility staff shall be provided a marked-up copy of the examination and the answer key.

2.

The facility will have five (5) working days from the day of the written examination to provide formal comment submittal.

The submittal will be made to the responsible Regional Office by the highest level of corporate management for plant operations, e.g., Vice President for Nuclear Opera-tions. A copy of the submittal will be forwarded.to the chief examiner, as appropriate.

Comments not submitted within five (5) working days _ will be considered for inclusion in the grading process on a case basis by the Regional Office section leader. Should the comment submittal deadline not be met, a long delay for finalization of the examination results may occur.

3.

The following format should be adhered to for submittal of specific comments:

a.

Listing of NRC Question, answer and reference.

b.

Facility c imment.

c.

Supporting documentation.

NOTES:

1.

No change to the examination will be made without submittal of complete, current, and approved reference material.

2.

Comments made without a concise facility recommendation will not be addressed.

(

l OFFICIAL RECORD COPY OL 90 MILL 3 - 0011.0.0 l

10/02/87 I