REVISED COPY OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 5/12/87 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432
]
OPERATING STATUS
- 1. UNIT NAMEt TURKEY POINT UNIT 4
- 2. REPORTING PERIOD 1 APRIL 1987
- 3. LICENSED THERMAL POWER (MWT)! ______________ 2200 4.
NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE)*
693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! ___
699
- 7. MAXIMUM DEPENDADLE CAPACITY (NET MWE)!
666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS WUMBER 3 THROUGH 7)
SINCE LAST' REPORT, GIVE REASONE!
9. P bU ER LEV EL Yb~UHEE H R5 SYRE65E6, ~5F AUE~iUEY~ MUEi~_~_~_~_~_~~_~_~_~_~_[~_~
~
~
~
~
- 10. REASONS FOR RESTRICTIONS, IF ANY MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD 719 2879 119980.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
O.0 1551 9 82235.2
- 13. REACTOR RESERVE SHUTDOWN HCURS __________
0.0 0.0 166 6 0.0 1531 5 79418.6
- 14. HOURS GENERATOR ON-LINE _________________
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
32.1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 3237635 168001223
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 0 1064270 53549118
- 19. NET ELECTRICAL ENERGY GENERATED (MWH)
-4244 1002661 50685373 0.0 53 2 66.2
- 19. UNIT SERVICE FACTOR _____________________
- 20. UNIT $ AVAILABILITY FACTOR _____'___________
0.0 53 2 66.2
- 21. CAPACITY FACTOR (USING MDC NET) 0.0 52 3 64.0
- 22. CAPACITY FACTOR (USING DER NET) 0.0 50.3 61.0
- 23. UNIT FORCED OUTAGE RATE ______;-_________
100.0 46.8 8.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
- 25. IF SHUT DOWN AT END OF REPORT PERIODr ESTIMATED DATE OF STARTUPt 5/25/97 8707220322 870615 PDR ADOCK 05000250 R