ML20235T917
| ML20235T917 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 02/28/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Deddens J GULF STATES UTILITIES CO. |
| References | |
| NUDOCS 8903080527 | |
| Download: ML20235T917 (2) | |
Text
-_
%;,-. N
[In.ReplyReferTo:
FEB 2 81989 Docket: 50-458 Gulf lStatesUtilities
.ATIN:.Mr. James C..Deddens.
. Senior Vi'e President-(RBNG) c P.O. Box 220
- St. Francisv111e, Louisiana 70775 Gentlemen:
-This acknowledges the receipt of your letter dated February. 10, 1989, by which
.you transmitted Revision Number 8.to the Security Training and Qualification
~
Plan-for your facility.
~We find.the changes in the subject letter and the attachments thereto to bel
-consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are acceptable for. inclusion into the. plan.
.The enclosures to your: letter contain Safeguard Information of_a-type specified in.10 CFR 73.21 and are being withheld from public_ disclosure.
- Sincerely, Original Signed By, A. B. Beacli L. J. Callan, Director Division of Reactor Projects CC:
Gulf States Utilities
' ATTN:
J. E. Booker, Manager-River Bend Oversight P.O. Box 2951-Beaumont,. Texas 77704 Gulf States Utilities ATTN:.Les England, Director Nuclear Licensing - RBNG
.P.O. Box 220' St.'.Francisv111e, Louisiana 70775 Louisiana State University, Government Documents Department
- Louisiana Radiation Control Program Director C:k N
C PS DR RI
- RPB C:
RPB BE nest:cd RJE tt BMurFay L
stable IL an
& }/89 4 @ /89 g /89 v;/89 2 /FB89 CASEWORK NUMBER 50-458/14-XA i \\
8903000527 090228
~
- If" $
U
c,.
V:
u. -.<
u.
.bulfStates. Utilities
~
Lbec w/nonsafeguards' portion of letter dated 2/10/89i
- DMB - ( RG01):
~
~ R.;0; Martin, RA DRP R..L. Bangart, DRSS'
' Branch 4 Chief, RPB Security Inspector Section Chief, SEPS:RPB Section Chief DRP/C
-Resident-Inspector -
.P.'A.
Starcher,z RSGB/NRR-RITS Coordinator
- 50.54(p). Book; '
SEPS:RPB Security' File' Physical Security File
.RIV' File-Ri Ei. Hall, DRSS
. Project. Engineer,-DRP/C
.c
'DRS MIS
- W. Paulson, NRR Project. Manager
)
5
' __..L___E_.______.i_'__.____
SAFEOUARDS INTOT5ATION -
$.m 4G1215th GULF STATES UTIZETIES COMPAFU Of,I FEB 2 21989 9
~. x. m.
un m=.
mu
- u,m February 10, 1989 RBG-30027 File Nos. G9.5, G12.23.4.3 Director of Nuclear Material Safety and Safe. guards U.S. Nuclear-Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
River Bend Station - Unit 1 Refer to Region IV Docket No. 50-458 Pursuant to 10CFR50.54(p), please find enclosed four copies. (Nos. 8, 9, 10,and11)ofRevision 8 to the River Bend Station (RBS) Security Training and Qualification Plan (T&Q). Changes have been made to the T&Q Plan to reflect current activities of the RBS security program.
An explanation of these changes are enclosed to facilitate NRC review. The changes have been determined to net involve unresolved safety questions or decrease the effectiveness of the security program. Changes in the text are-indicated by side bars.
Revision 8 of the T&Q Plan, issued in total, supersedes all earlier revisions.
The T&Q Plan is considered " Safeguards Information" pursuant to 10CFR73.21 and should be handled accordingly.
Sincerely,
/
W C. Deddens Senior Vice President River Bend Nuclear Group JCD/RJK/DLD/JHM/ch Enclosures cc: Mr. Robert D. Martin, Regional Administrator (Copy Nos. 16 and 17)
- U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Senior Resident Inspector (w/o attachment)
THIS PAGE NOT SUBJECT TO PROTECTIVE REQUIREMENTS WHEN SEPARATED FROM MATERIAL CONTAINING SAFEGUARDS INFORMATION
,, m m k W 7w,N4
}l
-_ -