Forwards Insp Rept 50-298/89-02 on 890123-27.Violations Noted But Citation Not Being Issued
ML20235T834
Person / Time
Site: Cooper 
Issue date: 03/01/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20235T837 List:
References
NUDOCS 8903080493
Download: ML20235T834 (2)


See also: IR 05000298/1989002

Text

A f

[

"%

i 1989

l

In Reply Refer To:

Docket:

50-298/89-02

Nebraska Public Power District

ATTN:

George A. Trevers

Division Manager - Nuclear Support

P.O. Box 499

Columbus, NE 68602-0499

Gentlemen:

-This refers to the inspection conducted by Messrs. P. Wagner, L. Gilbert,.

'A. Singh; and R. Stewart of this' office during the period January 23-27, 1989,

of activities in support of NRC Operating License DPR-46 for Cooper Nuclear

Station, and to the discussion of our findings with Mr. H. G. Parris, you, and

other member 3 of your' staff at the conclusion of the inspection.

Areas examined during the inspection included engineering and technical support

' activities.

Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors.

The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

This violation is described in paragraph 3.d

of the inspection report.

In accordance with Section V.A. of the NRC's

Enforcement Policy (10 CFR Part 2, Appendix C), no citation is being issued.

l

However, we request that you provide within 60 days of the date of this letter

a discussion of all facility drawing update efforts, together with the

schedule for completing these updates.

We have also examined actions you have taken with regard to a previously

identified inspection finding.

The status of this item is identified in

. paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Undnal spi <, g

A. D. Beach

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

(see next page)

RIV: RI*

C:MQPS*

C:PSS*

E0*

D:DRS*

[

Rf

-

PWagner;ap

IBarnes

TStetka

GSanborn JLMilhoan

L-

an

/ /89

/ /89

/ /89

/ /89

/ /89

3/l /89

\\ \\

8903080493 g90393

{DR

ADOCK 05000298

_ . -

_

mv

i

y,7

.

.

--

--

-

-,

,

f,

~

l

T.

-

..

.

.

,

,

l

>

i.

>

_-

,

,

' Nebraska.Public Power District

' 2-

,

,

-

t

4

,

f

' -

'

p

E

' Enclosure:

E

Appendix - NRC Inspection Report

50-298/89-02 w/ Attachment

,

.cc w/ enclosure:

Cooper Nuclear. Station

+

'

ATTN:

Guy Horn, D.ivision Manager

.

,

,

of Nuclear Operations

'l

f

P.O. Box 98

'

Brownville, Nebraska 68321

' Kansas Ra'dia' tion' Control Program Director

-

Nebraska Radiation Control Program Director

'

bec to DMB (IE01)'

bec distrib. by RIV:

.

  • RRI 'T
  • R. D. Martin, RA
  • Section Chief (DRP/C)

Lisa Shea,.RM/ALF

  • RPB-DRSS
  • MIS System

j

'*RIV File

  • Project Engineer, DRP/C

,

  • RSTS Operator
  • DRP

l

  • P. O'Connor, NRR Project Manager (MS:

13-D-18)

  • DRS
  • I.'Barnes
  • P. Wagner
  • B

Grimes, NRR

.

  • L.-Gilbert
  • A.

Singh

  • R.

SteWert

  • T. Stetka

i

  • w/766

l

1

!

!

.

!

[

1

i

l

l

d

(

'

- _ _ _ _ _ _ _ _ _ _.