4C' OCT T 1987L In Reply Refer To:
Docket:' 50-285 Omaha Public Power District ATTN:. R. L~.-Andrews,- Division Manager-Nuclear Production 1623,Harney Street' Omaha, Nebraska-68102
]
l Gentlemen:
l Thank you.for your letter dated August 21, 1987, concerning the' security..
I measures for new construction at Fort Calhoun Station. We have no comments at
)
l
)
this time, but~ we will review the implementation of your compensatory measures
~
during a future inspection.
i Sincerely, Orlda:1 Simci by:
R.L.BANCART Richard L. Bangart, Director Division of Radiation Safety and Safeguards cc:
W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW l
Washington, D. C.
20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director
'bec: (see next page)
C:RPSB!@
RIV:RPSB @
.D:D RACaldwellYjt LAYande RLB rt-10/'f/87i/
/0 /0(/87
\\b/s /87-g0130066871007
/bk A
K0 g5f 1
F.
p 1
L.
t Omaha Public Power District bec to DMB -(IE-04) bec distrib, by RIV:
RPB
. Resident Inspector R. D. Martin, RA D. Weiss, RM/ALF RPSB Section Chief (PPB /B)
MIS System RIV File DRSP RSTS Operator RSB Inspector L. A. Yandell R. L. Bangart R. E. Hall Project Inspector, RPB T. Bournia, NRR Project Inspector l
l l
i i
i
~!
)
j t
- m
w.
i o l,
_r -' r.r._T.^LC:.~' *T X '~~~'_,
Omaha Pubile Power District 1623 Harney Omaha. Nebraska 68102 402/536-4000 August 21, 1987 LIC-87-574 3 gggp Mr. R. L. Bangart E 311987 i
Nuclear Regulatory Commission
@j Region IV ia j
611 Ryan Plaza Drive, Suite 1000 j
q
+
Arlington, Texas 76011
Reference:
Docket No. 50-285
Dear Mr. Bangart:
SUBJECT:
Letter of Understanding-Security Measures for New Construction In October, OPPD begins the first of three major construction projects.
The three buildings, Maintenance Shop addition, Chemical and Radiation Protection (C&RP)-locker room addition, and Rad Waste Processing addition will all be inside the protected area (P.A.) boundary.
This construction period will last until sometime in late 1989.
The purpose of this letter is to outline OPPD's understanding of telephone dis-cussion held on Tuesday and Wednesday, July 28 and 29, 1987, between Region IV i
security personnel and Fort Calhoun Station (FCS) security personnel.
The dis-cussion addressed the concept and specific plans to "rubberband" the Protected Area (P.A.) boundary to allow construction of the new Maintclance Shop addition outside the P. A. during the day and move the P. A. boundary back to the normal configuration at night.
During the daytime construction period the P.A. boundary will be as indicated on the attached drawing. Compensatory positions will be posted as necessary to maintain the functions of detection and assessment..The construction area will be searched prior to rubberbanding the P.A. boundary back out to the fence line. The Maintenance Shop will be expanded by constructing an addition which will extend 70 feet further north of the existing building. The entire interior of the existing shop will be remodeled.
The P.A. boundary will be 9 gauge chain link fence at least 8 feet high, with barbed wire outriggers except where the boundary runs through the building.
Inside the building, the barrier will be the building walls or chain link fence fabric or a combination of both.
Maintenance work will be performed in the small warehouse which will be included in the P.A. as shown on the attached drawing.
This area will also be covered by compensatory posts.
The placement of these manned positions as shown on the drawing is approximate. Actual placement will be determined by FCS security to ensure adequate detection and assessment capability.
, er L
=g-4
t' i-,.
'R. L Bangart LIC-87-574 Page 2 In addition to the Maintenance Building addition, a new C&RP-locker room and Radwaste Processing Facility will also be built. OPPD proposes using a similar security concept for those projects. OPPD security and licensing personnel will brief Region IV security personnel on the specifics of those projects as soon as it is feasible.
The Site Security Plan will be revised to show the new' building and fence configurations when each project is complete.
Please feel free to call if you have questions or need further clarification on this issue.
Sincerely,
&. A - - M 7
R. L. Andrews Division Manager Nuclear Production RLA/me cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.
Washington, DC 20036 P. H. Harrell, NRC Senior Resident Inspector i
1 l
,/
4 mLyH1 H[]O()1 HZ J
L W 'S
+
+
+
+
+
+
"I 1
l a
l
[
y h
T "
m u
1 y I j
~
A R;
_I t
I a
Y i
1e T
r IG A^:
j/
RO UL CB E
+
+
+
+
+
+
S N
i _
gi a
wM$
~-
N E
/
EO C
CI N
NT A
AI NP.
E O
ND E
+
+
+
H
+
N
+
+
+
T S
G TA N
I QM BD N
L IP R
AO M
UB E
MH T
S S
U O
e H
n E
i m '
R L
W
+
+ u:
6
+
+
l
+
A e
c q-HR T
W n
R E
E e
O
[
C N
F T
P E NP w
UE T
e SC N
G d
O L
e l
+
+
B.
+
+
+
v l
o m
X e
UA r
b N
e gO T
c n
,I C.
T EC e
gA TA f
gD OF I
R
+
s
+
p, R "P A
+
+
l i
h T
(
y wh* !
+
+
i
/\\
)
/
n o
o a
i
\\'
i t
t m
m m
m i
c s
u o
r P
ts d
,.gc $,2 n
n
+
+
+
+
8a"+@
e oc t
n a
h a
g g
M n
i
(
i n
t r0
/
s u0 t
o d7 a
/
P 1
y y-y
\\+
m m
J yr r0 r
y@Wy r a a0 a
+
+
+
+
+
od d7 d
t n n0 n0 a u u u0 N
s o o o7 n b bd b0 N
e o
p.
.i e 0
m A.
A. e A. 7 r t 0
N\\
o a
C P Pp g P1
'
=
==
+
+
+
+
+
r^
3 e
]
N$
Ae O
R s Rs s
l _llEl rill 2