October 6, 1987 Docket No. 50-341
.. DISTRIBUTION
.I iDocket; File EGreenman, REG III Mr. B. Ralph Sylvia GHolahan PDIII Plant File Group Vice President EJordan ACRS (10)
Nuclear Operations CYCheng OGC-Bethesda Detroit Edison Company NRC & Local PDR JPartlow 6400 North Dixie ~ Highway RIngram JStefano Newport, Michigan 48166
Dear Mr. Sylvia:
SUBJECT:
NRC SAFETY EVALUATION ON THE FIRST TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN FOR FERMI-2 (TAC # 59616)
The NRC staff and its consultant, Idaho National Engineering Laboratory, have reviewed Revision 0, Change 2, of the subject Inservice Inspection Program l
Plan and find the plan to be acceptable and in compliance with the provisions j
The extent to which the relief requested has been j
granted from Section XI of the ASME Code requirements is indicated in Table 1 i
to the enclosed Safety Evaluation (SE).
Attached to the enclosed SE is the staff consultant's' Technical Evaluation Report, which discusses the bases for not granting some of the relief requested from ASME Code requirements.
It should also be noted that, with respect to the relief requested from ASME Code
)
examination of the reactor vessel welds, Category B-A, and indicated as "not granted" in Table 1 to the enclosed SE, the NRC staff is still in the l
process of reviewing the procedure for the examination of those welds.
The staff's conclusion from that review, as it pertains to Fermi-2, will be communicated to you at a later date.
Should you have any questions concerning the enclosed SE, or wish to discuss further those relief requests not granted, please let me know.
Sincerely, Original signed by John J. Stefano, Project Manager 8710090163 871006 Project Directorate III-1 DR ADOCK 0500 1
Division of Reactor Projects-III, IV, V & Special Projects
Enclosure:
Safety Evaluation I
cc w/ enclosure:
1 See next page bec w/ enclosure:
E. Greenman, Region III h
R. Starostecki 7
LA:PD31:DRSP FPD31: DRSP ST 0:PD3 RSP Gi (RINGRAM JS EFAN0:jc C
G MVIRGILIO 1rAN4/
9/$/87 9/f(/87 9
/37 9/p5/87
\\@@ /87 0FFICIAL RECO COPY
s.
Mr. B. Ralph Sylvia Detroit Edison Company Fermi-2 Facility CCI Mr. Harry H. - Voigt, Esq.
Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N.W.
Michigan Public Service Commission Washington, D.C. 20036 6545 Mercantile Way P. O. Box 30221 John Flynn, Esq.
Lansing, Michigan 48909 Senior Attorney Detroit Edison Company Regional Administrator, Region III 2000 Second Avenue U.S. Nuclear Regulatory Commission Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office
)
Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Steve Frost Supervisor-Licensing Detroit Edison Company Fermi Unit 2 i
6400 North Dixie Highway
{
Newport, Michigan 48166 Mr. Thomas Randazzo Director, Regulatory Affairs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161
- -___ _-_ _ _ _ D