OPERATING DATA REPORT DOCKET NO.
50-461 UNIT Clinton 1 DATE 05/31/87 COMPLETED BY F. A. Spangenberg TELEPHONE (217) 935-8881 X3400 OPERATING STATUS 1.
REPORTING PERIOD:
May, 1987 GROSS HOURS IN REPORTING PERIOD:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2894 MAX. DEPEND. CAPACITY (MWe-Net): Not Available DESIGN ELECTRICAL RATING (MWe-Net):
933 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 933 4
REASONS FOR RESTRICTION (IF ANY):
N/A THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL...
488 1676 1676 6
REACTOR RESERVE SHUTDOWN HOURS.........
0 0
0 7.
HOURS GENERATOR ON LINE................
166*
227*
227*
8 UNIT RESERVE SHUTDOWN HOURS............
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (MWH)... 122.127 214,185 214,185 10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 14,780 19,455 19,455 11.
NET ELECTRICAL ENERGY GENERATED (MWH)..
0 0
0 12.
REACTOR SERVICE FACTOR.................
N/A 13.
REACTOR AVAILABILITY FACTOR............
N/A 14.
UNIT SERVICE FACT 0R....................
N/A
- 15. UNIT AVAILABILITY FACTOR...............
N/A 16.
UNIT CAPACITY FACTOR (Using MDC).......
N/A 17.
UNIT CAPACITY FACTOR (Using Design MWe)
N/A 18.
UNIT FORCED OUTAGE RATE................
N/A b
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF y
$g EACH): Maintenance shutdown, October 2, 1987, 21 days.
NL 1
Bf 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 6/4/87 sCO Chc 5fg#
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED op p}<
INITIAL CRITICALITY 2/27/87 Sg INITIAL ELECTRICITY (Synchronization) 4/24/87 50 U210c COMPLETION OF WARRANTY RUN 11/04/87
- Corrected values for May, 1987 report J