Revised Pages to Monthly Operating Rept for Apr 1987
ML20235S295
Person / Time
Site: Clinton 
Issue date: 04/30/1987
From: Spangenberg F
ILLINOIS POWER CO.
To:
Shared Package
ML20235S271 List:
References
NUDOCS 8707210616
Download: ML20235S295 (2)


Text

- --_.

~

-MONTHLY OPERATING REPORT FORMAT AND INSTRUCTIONS AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-461 UNIT Clinton 1-DATE 04/30/87 COMPLETED BY F. A. Spangenberg TELEPHONE (217) 935-8881 X3400 MONTH April, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

.1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 5

9 0

25 7

10 0

26 18 11 0

27 0

'12 0

28 35 13 0

29 43 14 0

30 30*

15 0

31 N/A 16 0

INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day l

in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note l

that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the

. average daily unit power output sheet should be footnoted to explain the apparent anomaly.

  • Corrected value for April, 1987 report f

P R

i

1

. OPERATING DATA REPORT l

l DOCKET NO.

50-461 UNIT Clinton 1

.DATE 04/30/87 COMPLETED BY F. A. Spangenberg TELEPHONE (217) 935-8881 X3400 OPERATING STATUS 1

REPORTING PERIOD: April, 1987 GROSS h0URS IN REPORTING PERIOD:

719 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

2894 MAX. DEPEND. CAPACITY (MWe-Net):

Not Available DESIGN ELECTRICAL RATING (MWe-Net):

933 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

933 4.

REASONS FOR RESTRICTION (IF ANY):

N/A THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL...

719 1228

___1228 6

REACTOR RESERVE SHUTDOVN HOURS.........

0 0

0 7.

HOURS GENERATOR ON LINE................

61 61

'61 8

UNIT RESERVE SHUTDOWN HOURS............

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH)..

87,775*

92,058*

92,058*

10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 4675 4675 4675

11. NET ELECTRICAL ENERGY GENERATED (MWH)..

0 0

0 12.

REACTOR SERVICE FACTOR.................

N/A 13.

REACTOR AVAILABILITY FACTOR............

N/A 14 UNIT SERVICE FACTOR....................

N/A j

'15.

UNIT AVAILABILITY FACTOR...............

N/A 16.

UNIT CAPACITY FACTOR (Using MDC).......

N/A 17.

UNIT CAPACITY FACTOR (Using Design MWe)

N/A 18.

UNIT FORCED OUTAGE RATE................

N/A 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Maintenance shutdown, September 17, 1987, 21 days.

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 2/27/87 INITIAL ELECTRICITY (Synchronization) 4/24/87 COMPLETION OF WARRANTY RUN 10/19/87 l

  • Corrected value for April, 1987 report.