ML20235R449
| ML20235R449 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/31/1987 |
| From: | GENERAL ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20235R428 | List: |
| References | |
| 23A4845-ERR, NUDOCS 8707210329 | |
| Download: ML20235R449 (2) | |
Text
._
v
/
NUCLEAR ENERGY BUSINESS OPER ATIONS
- GENERAL ELECTRIC COMPANY SAN JOSE, CALIFORNI A 95125 GEN ER Alh ELECTRIC APPLICABLE TO:
PUBLICATION NO.
ERRATA And ADDENDA T. L e. NO.
SHEET Supplemental Reload Licensing TIT LE 3
Submittal for Millstone Unit 1, DATE
'llfl V l9S7
~
Reload 11 D.
NO TE: - Correct all copies of the applicable tSSUE DATE publication as specified below.
REFERENCES INSTRUCTIONS AC ITEM
,js,E,C7 0,N, c
p L NE)
(CORRECTIONS AND ADOlTIONS) 01 Page 12 Replace with r.ew page 12.
l i
l I
l i
i l
l l
I B707210329 870714 PDR ADOCK 05000245 1 of 1 P
.. P AGE l
]
I 4
~
23A4845 Rev. 1 14.
STABILITY ANALYSIS RESULTS (S.2.4)
Millstone Point Nuclear Power Station Unit 1 is exempt from the current requirement to submit a cycle-specific stability analysis as documented in the letter from C.O. Thomas (NRC) to H.C. Pfefferlen (GE), " Acceptance for Referencing of Licensing Topical Report NEDE-24011, Rev. 6, Amendment 8,
' Thermal Hydraulic Stability Amendment to GESTAR II'," April 24, 1985.
- 15. LOADING ERROR RESULTS (S.2.5.4)
Variable Water Gap Disoriented Bundle Analysis: Yes Event ACPR Disoriented 0.13
- 16. CONTROL ROD DROP ANALYSIS RESULTS (S.2.5.1)
Millstone Point Nuclear Power Station Unit 1 is a Banked Position With-drawal Sequence plant, so the Control Rod Drop Accident Analysis is not required. NRC approval is documented in NEDE-240ll-P-A-8-US, May 1986.
l 12
.