Text
.
+
N'
~
September 23, 1987 s
v Docket No.: 50-213' DISTRIBUTION i
gNgigiyTRIS4 EJordan NRC/ Local PDR JPartlow MrJ Edward J. Mroczka, ' Senior Vice President ISAPD File- -
TBarnhart(4)
Nuclear Engineering and Operations DCrutchfield
.WJones y
Connecticut Yankee Atomic Power Company; FSchroeder ACRS'(10)
Post Office Box 270 MShuttleworth Tech Br Hartford, Connecticut.06141-0270 FAkstulewicz DHagan
'0GC-Beth WJones
Dear Mr.' Mroczka:
EButcher GPA/PA ARM /LFMB-45 W 4 3
SUBJECT:
TECHNICAL SPECIFICATIONS CONCERNING SNUBBER TESTING AND SURVEILLANCE i
(TACN0.65476).
I Re:
Haddam Neck Plant The. Commission has issued the enclosed Amendment.No. 95 to Facility Operating License.No. DPR-61 for.the Haddam Neck Plant. This amendment is in response to your application ~ dated June 1, 1987.
This license ' amendment revises Technical Specifications (TS) 3.19 and 4.13 H,
pertaining to snubbers by replacing the existing TS with technical specifications which a are largely consistent with the NRC model standard. technical specifications-(STS) and which are more consistent with current industry guidelines such as NRC Generic Letter 84-13.
A' copy of the Safety Evaluation is enclosed. A Notice of Issuance will be included;in the Commission's next regular biweekly Federal' Register notice.
Sincerely,
/s/
Francis M. Akstulewicz, Jr, Project Manager Integrated Safety Assessment Project Directorate Division of Reactor Projects III/IV/V and Special Projects
Enclosures:
1.
Amendment No. 95 to License No. DPR-61 2.
Safety Evaluation cc w/ enclosures:
See next page LA:ISAPD gh PM:ISAPD OGC-Be da g//p/87 MS)1uttleworth:
FAkstulewicz T
er
- /(f/87 7//p/87 9 Ey 87 9
OlFICIAL RECORD COPY p
h DON P
t-
nico
'o,,
UNITED STAYES
[_
g NUCLEAR REGULATORY COMMISSION t;
- 2 WASHINGTON, D. C. 20555
't, ep em er 23,1%7 Docket ho.: 50-213 Mr. Edward J. Mroczka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Mroczka:
SUBJECT:
TECHNICAL SPECIFICATIONS CONCERNING SNUBBER TESTING AND SURVEILLANCE (TAC N0. 65476)
Re:
Haddam Neck Plant The Commission has issued the enclosed Amendment No. 95 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated June 1,1987.
This license amendment revises Technical Specifications (TS) 3.19 and 4.13 pertaining to snubbers by replacing the existing TS with technical specifications which are largely consistent with the NRC model standard technical specifications (STS) and which are more consistent with current industry guidelines such as NRC Generic Letter 84-13.
A copy of the Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Reoister notice.
Sincerely, f
lA
/
i rancIsM.Akstulewicz, Project Manager Integrated Safety Assessment Project Directorate Civision of Reactor Projects - III, IV, V and Special Projects
Enclosures:
1.
Amendment No.95to License No. DPR-61 2.
Safety Evaluation ec w/ enclosures:
See next page
7 r-y
/
~
)
y
\\'
b o
/l t.:Mr. Edward J. Mroc7La p +
E
)
^
L C nnecticut Yankee'; Atomic Power Company Haddam Neck Plant a
'r ;
f f
];
f
\\
J I
e,
'CC:-
t -'
e Gerald Garfield, Esquire Kevin McCarthy, Director
' Day, Berry & Howard Radiation Control Unit Counselors at Law-Depsrtment of Enviro mental City Place
'l. Protection 4
-Hartford, Connecticut 06103-3499 it' ate Office Building Hartford, C,onnecticut 06106 Superintendent 1
Haddam Neck Plant Richhrd.M.~Jhacich, Manager
', Generation Facilities Licensing 4
RFD #1' a
Post Office Box 127E '
Northeastqutilities Service Company
'l Post Office Box 270 l
East Hampton, Conne,cticut 06424
. ' W rtford, Connecticut 06141-0270 l
4 Wayne D. Romberg l
3 Vice President, Nucleg Operations
Jonald 0.- Nordquist, Di rector Northeast Utilities Serdtd Company f sality Services Department Q
c Post Of fice Box 270. r -
hortheast Utilities Service-Department Hartford, Connecticut 06141-0270' Post 0ffice Box 270
~
Hartford, Connecticut 06141-0270 Board of Selectmen r
Town Hall i
Haddam, Connecticut 06103 i
Bradford S. Chase, Under Secretary i
Energy Division
's Office of Policy and Management 80 Washington Strcet Hartford, Connecticut 06106
+
,.[(i Resident Inspector Haddam Neck Nucidar Power Station c/o U.S. NRC
'(
l
)
P.. O. Box 116
,i East Haddam Post Office
(
-East Haddam,. Connecticut 06423 J
Regional Administrator,. Region'!
j/
U.S. Nuclear Regulatory Commission 631 Park-Avenue King of Prussia, Pennsylvania' 19406 e
. i
,o 1
I
);
r i
i/.
(
f I
1
[
a
+
4 7
,f g
i)
-i i
l
/
y 1
s_