February 21, 1989 Docket No. 50-416 Mr. W. T. Cottle Vice President, Nuclear Operations System Energy Resources, Inc.
P.O. Box 23054 Jackson, Mississippi 39205 1
Dear Mr. Cottle:
)
SUBJECT.
REQUEST'FOR ADDITIONAL INFORMATION - GRAND GULF NUCLEAR STATION (GGNS), UNIT 1 (TAC NO. 71903)
By letter dated January 26, 1989, System Energy Resources, Inc., requested a review of its proposed changes to Technical Specifications (TS) to provide one-time exceptions to TS 3.0.4 for certain activities scheduled during the third refueling outage. The NRC staff is reviewing this submittal and finds that additional information is needed. The request for additional information is enclosed.
In order to support our review schedule, you are requested to respond to the enclosed request by February 24, 1989.
This matter was discussed with your representatives by telephone on February 17, 1989.
The reporting and/or recordkeeping requirements of this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely,
/s/
Lester L. Kintner, Senior Project Manager Project Directorate 11-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Enclosure:
Request for Additional Information cc w/ enclosure:
See next page
[COTTLE LTR 2/21]
. DISTRIBUTION:
l Docket File' SVarge TMarsh EJordan (MNGG 3302) l
-NRC'PDR"
Glainas MHodges BGrimes (9A2)
Local PDR EAdensam
- JCraig RBrady (12E4)
PD21 R/f L Kintner EReeves ACRS(10) j P
- PD21
- SRXB
- SPLB PD21 0\\
g
,Ct/I P' son LKintner MHodges JCraig EReeves 02y)/89 02/21/89 02/21/89 02/21/89 02/t//89 i
'kg
- SEE PREVIOUS CONCURRENCE 8903020078 890221
~
FDR ADOCK 05000416 l
P l
PDC l
---_____-Q
a n*
'Mr. W.,T. Cottle
. System Energy Resources, Inc.
Grand Gulf Nuclear Station (GGNS) cc:
Mr. T. H. Cloninger Mr.'C. R. Hutchinson Vice President, Nuclear Engineering GGNS General Manager and Support System Energy Resources, Inc.
System Energy Resources, Inc.
Post Office Box 756 P. O. Box 23054 Port Gibson, Mississippi 39150-Jackson, Mississippi' 39205 Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen anc Attorney General Caraway Department of Justice P. O. Box 651 State of. Louisiana Jackson, Mississippi 39205 Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Office of the Governor Bishop, Liberman, Cook, Purcell State of Mississippi and Reynolds Jackson, Mississippi 39201 1400 L Street, N.W.
. Washington, D.C.
20005-3502 Attorney General Gartin Building j
Mr. Ralph T. Lally Jackson, Mississippi 39205 i
Manager of Quality Assurance Middle South Utilities System
.Mr. Jack McMillan, Director Services, Inc.
Division of Solid Waste Managenent
'639 Loyola Avenue, 3rd Floor Mississippi Department of Natural New Orleans, Louisiana 70113 Resources Post Office Box 10385 l
Mr. John G. Cesare Jackson, Mississippi 39209 Director, Nuclear Licensing System Energy Resources Inc.
Alton B. Cobb, M.D..
P. O. Box 23054 State Health Officer Jackson, Mississippi 39205 State Board of Health P.O. Box 1700 Mr. C. B. Hogg, Project Manager Jackson, Mississippi 39205 Bechtel Power Corporation P. O. Box 2166 President Houston, Texas 77252-2166 Claiborne County Soard of Supervisors Port Gibson, Mississippi 39150 Mr. H. O. Christensen Senior Resident Inspector Regional Administrator, Region II U.S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Route.2, Box 399 101 Marietta Street Port'Gibson, Mississippi 39150 Suite.2900
/
Atlanta, Georgia 30323 i
i a
ENCLOSURE l
REQUEST FOR ADDITIONAL INFORMATION GRAND GULF NUCLEAR STATION UNIT 1 EXCEPTIONS TO TECHNICAL SPECIFICATION 3.0.4 l
l 1.
The application requesting one-time exceptions to GGNS-1 Technical Specification 3.0.4 for Operational Conditions 4 and 5 and for special conditions for use during the third refueling outage are unnecessarily I
broad in scope, as discussed in our February 14, 1989 meeting with you.
Provide a revision to the proposed TS changes that will reduce the scope of the exceptions to the maintenance and testing activities scheduled for I
the third refueling outage. Provide a chart showing the scheduled dCtivities, TS operational conditions and ECCS systems and shutdown cooling system that will be operable, functional, and operating similar to the charts presented on two slides in the February 14, 1989 meeting.
Describe each activity for which an exception is requested including the length of time for performing the activity.
2.
The safety analyses for some exceptions do not provide the reasons why granting the exception would provide an acceptable level of safety. For example, entering the low water level special condition in Operational l
Condition 5 involves draining the reactor cavity.
If outage activities at that time have a potential for draining the reactor vessel, clarify why the requested exception to meeting the requirements in the Limiting Conditions for Operation of ECCS pumps is acceptable. Provide the reasons why granting each exception is considered to provide an acceptable level of safety. Conclusions without bases are inadequate.
For example, in the application, Section C.c., "TS 3.5.3," it is concluded " continued plant operation is allowed, with an alternate indication source, without a loss in safety." Reference to a detailed safety analysis in another application is acceptable provided the main reasons for the conclusion are summarized.
I 1
(
l
,