_
- (,
2_.j '
.
..
FEB 181989
+
-
..
.
.
-
i
.
i
!
I
Docket No. 50-426
)
License No. NPF-68
l
l
. Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Birmingham, AL- 35201
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-425/88'-78
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
M. M. Glasman on December 19-22, 1988.
The inspection included a review of
activities authorized for your Vogtle 2 facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identi-
fied.
Your attention is invited to the unresolved item identified in the Inspection
Report.
This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sin erel ,
Caudie A. Julian, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
(See page 2)
r&
()m, 004
0
zu,
.
Ls '
,
,
FEB 181988
-
,
..
-
c
.
.
.
'
Georgia Power Company
'2
Enclosure:
NRC' Inspection Report'
cc w/ encl':
R. P. Mcdonald, Executive'Vice
~
President, Nuclear Operations
P.--D. Rice,.Vice President,-Project-
Director-
.
C. W.'. Hayes, Vogtle Quality
Assurance Manager
G. Bockhold, Jr. , General Manager,
Nuclear Operations.
J. P. Kane, Manager Licensing
and Engineering
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig,. Georgians Against
Nuclear Energy
State of Georgia
bec w/ encl:
E. Reis, OGC
J. Hopkins, NRR
M. Sinkule, RII
L. Slack, RII
DRS Technical Assistant
NRC Resident Inspector
Document Control Desk
..
RII
RII
y
'
MGlasman:ser
ake
MS
e
02/ /89
/ (f /89
02/ /89
_ ___ __ -____ _ __
_ _
_ _ _ _ _ - - _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _