Forwards Insp Rept 50-425/88-78 on 881219-22.No Violations or Deviations Noted
ML20235N630
Person / Time
Site: Vogtle 
Issue date: 02/18/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20235N634 List:
References
NUDOCS 8903010312
Download: ML20235N630 (2)


See also: IR 05000425/1988078

Text

_

(,

2_.j '

.

..

FEB 181989

+

-

..

.

.

-

i

.

i

!

I

Docket No. 50-426

)

License No. NPF-68

l

l

. Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Birmingham, AL- 35201

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-425/88'-78

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

M. M. Glasman on December 19-22, 1988.

The inspection included a review of

activities authorized for your Vogtle 2 facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identi-

fied.

Your attention is invited to the unresolved item identified in the Inspection

Report.

This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sin erel ,

Caudie A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

(See page 2)

r&

()m, 004

0

zu,

.

Ls '

,

,

FEB 181988

-

,

..

-

c

.

.

.

'

Georgia Power Company

'2

Enclosure:

NRC' Inspection Report'

cc w/ encl':

R. P. Mcdonald, Executive'Vice

~

President, Nuclear Operations

P.--D. Rice,.Vice President,-Project-

Director-

.

C. W.'. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr. , General Manager,

Nuclear Operations.

J. P. Kane, Manager Licensing

and Engineering

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig,. Georgians Against

Nuclear Energy

State of Georgia

bec w/ encl:

E. Reis, OGC

J. Hopkins, NRR

M. Sinkule, RII

L. Slack, RII

DRS Technical Assistant

NRC Resident Inspector

Document Control Desk

..

RII

RII

y

'

MGlasman:ser

ake

MS

e

02/ /89

/ (f /89

02/ /89

_ ___ __ -____ _ __

_ _

_ _ _ _ _ - - _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _