Forwards Safeguards Insp Rept 50-456/87-31 on 870914-18 & Notice of Violation.Actions Re Weaknesses in Vital Area Control Program Requested within 30 Days If Paragraph 5 & 7 Descriptions Incorrect.Notice Withheld (Ref 10CFR73.21)
ML20235N176
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 09/30/1987
From: Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20235N179 List:
References
NUDOCS 8710060420
Download: ML20235N176 (3)


See also: IR 05000456/1987031

Text

-_

f%

3

SEP 3 0 1987

.

Docket No. 50-456

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

l

Gentlemen:

This refers to the routine safeguards inspection conducted by

Messrs. T. J. Madeda and J. R. Kniceley of thf s office on September 14-18,

1987, of activities at Braidwood Nuclear Power Station, Unit 1, authorized

by NRC Operating License No. NPF-59 ard to the discussion of our findings with

Mr. E. Fitzpatrick and other members cf your staff at' the conclusion of the

l

inspection.

'

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice. The inspection

,

1

showed that action had been taken to correct the identified violation and

to prevent recurrence. Our understanding of your corrective actions are

described in Paragraph 6 of the enclosed inspection report. Consequently, no

,

reply to the violation is required and we have no further questions

I

regarding this matter at this time.

)

In addition, commitments made to resolve two weaknesses noted during the

inspection regarding your vital area control program and Safeguards

Information program are described in Pa ragraphs 5 and 7 of the Report

t

Details.

Please advise us in writing within 30 days after receipt of

j

this report if our understanding of your actions are incorrect.

j

?

Ar m m nined during thi: in:pcction concern a subject matwr which is exempt

from disclosure according to Part 73, Titic 10, Code of Federal Regulations,

Section 73.21(c)(2).

This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21.

Consequently, the enclosure

to this letter anc our report of this inspection will not be placed in the NRC

Fublic Document Room-

e710060420gj$99356

PDR

ADOCK

ppg

O

Enclosure contatns

M GUARD"

\\ TOP 9 m1 L

EMMET!P"

P9015 Decontrolled

_ _ _ _ _ _ _ _ _ - _ _ _ _

.IEff g

p A

-

nii n , wn

s

n s

ti n-inL

v,i

uun

\\ Jo

i

U

\\

V, n

av

1

.

Commonwealth Edison Company

2

SEP 3 0 1987

.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

l

hadt/ /h

l

Bruce S. Mallett, Ph.D., Chief

L

Nuclear Materials Safety

l

and Safeguards Branch

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-456/87031(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosures:

T. J. Maiman, Vice President,

i

PWR Operations

l

D. Butterfield, Nuclear

Licensing Manager

M. Wallace, Manager of Projects

D. Shamblin, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

NRR/DRIS/SGB

NRR/DRIS/ SIB

cc w/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq.

RIII

RIII

RIII

III

RIII

pfk V'

egh

q{$ (d

^

(

tw

i

Madeda/ib

Kniceley

Cree

i

ittle

Mallettumle:we cuntains

Y .p.g-[

SAFEGUARDSItjFORMATI0il

g

" r ^ m n A C 'l O d

Upon separation this

h

m nnno

0090 13 Cc;pntrolled

-

ii4 4

_uy

mvg

i

.

.

--

---

--

- - - - - - -

- - - - -

_ _ .

__

_ _ - .

\\

' ~ A 7

L J

A "" ARI

QA~TOIADTO -

,,

v

sv:n

Uli

!

_us,uisv

.

...

.

Commonwealth Edison Company

3

SEP 3 0 1987 -

.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

G. Berry, OGC

J. Stevens, NRR

.

l

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorabh Ivan W. Smith, ASLB

l

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

{

l

l

l

J

4

f closurn contains

01 EGUIRDS Ih'FCRMATION

Q A ~CD 'l A 7 No

i!

Ann A AT ' A ( L

W joparation this

paga 13 Decontrolled

-'

--us.6

6sv

. ,

s. . uini

u1

- _

_ - _ _ - _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ .

_ - - _