Confirms 871019-23 Equipment Qualification Insp,Per 870918 Telcon.Copy of Each Document Identified in Attachment 1 W/ Plus Mark Should Be Submitted 1 Wk Prior to Insp
ML20235N173
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/29/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 8710060419
Download: ML20235N173 (3)


Text

_ _ - _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _. _ _ _

't SEP 2 91987 Docket No. 50-271 Vermont Yankee Nuclear Power Corporation ATTN:

Mr. Warren P. Murphy Vice President and Manager of Operations RD 5, Box 169 Ferry Road Brattleboro, Vermont 05301 Gentlemen:

Subject:

EQUIPMENT QUALIFICATION INSPECTION OF VERMONT YANKEE NUCLEAR POWER STATION (INSPECTION No. 50-271/87-25)

This letter confirms the dates of October 19 - 23, 1987 for the NRC equipment qualification (EQ) inspection for Vermont Yankee Nuclear Power Station.

These dates were established during a previous telephone conversation between Mr.

Walter Anson on September 18, 1987 and Mr. Lenoard Cheung of this office.

The inspection will take place at the plant site.

A management entrance meeting is scheduled for 2:00 p.m. on October 19, 1987 with a management exit meeting tentatively scheduled for 10:00 a.m. on October 23, 1987 at the plant site. A plant walkdown inspection of specific EQ equipment is planned for Wednesday, October 21, 1987.

The inspection will include the following:

1.

Review of your implementation of 10 CFR 50.49 EQ program, including preservation of qualified status of equipment.

2.

Review of your implementation of Technical Evaluation Report / Safety i

Evaluation Report EQ corrective action commitments.

l 3.

Review of EQ documentation files.

4.

Physical inspection of equipment from the Master List.

One week prior to the inspection we will require one copy of each document i

identified in attachment 1 with a plus (+) mark.

i l

A duplicate copy is to be sent to:

l l

Uldis Potapovs, Chief Equipment Qualification Inspection Section EW/S 312A U. S. Nuclear Regulatory Commission Washington, DC 20555 1

I I go Ioc$

P G

OFFICIAL RECORD COPY CHEUNG9/23/87 - 0001.0.0 09/28/87

Vermont Yankee Nuclear Power Corp.

2

)

Your cooperation with us during this inspection will be appreciated.

Should you have any questions regarding this inspection, please contact either Mr.

Leonard Cheung (215) 337-5246 or Mr. C. Anderson at (215) 337-5376 of this office.

Sincerely, Original Signed By:

Cliff ord J. Anierse

) William V. Johnston V"

Acting Director Division of Reactor Safety

Attachment:

As Stated cc w/ attach:

R. W. Capstick, Licensing Engineer J. Gary Weigand, President and Chief Executive Officer J. P. Pelletier, Plant Manager Donald Hunter, Vice President Cort Richardson, Vermont Public Interest Research Group, Inc.

Gerald Tarrant, Commissioner, Department of Public Service Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Hampshire State of Vermont bcc w/ attach:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP H. Eichenholz, SRI, Yankee V. Rooney, LPM, NRR Robert J. Bores, DRSS j

RI:DRS

  • e 'RS e

I:DRS 0/[26/87 R :D pCheung/cgl Pullani Anderson 0FFICIAL RECORD COPY CHEUNG9/23/87 - 0002.0.0 09/23/87 o-

Jo If ATTACHMENT 1 REFERENCES 1.

+ Licensee's overall' EQ Program 2.

+NRC Safety Evaluation Reports concerning environmental qualification of safety-related electrical equipment, including the SER that forwarded the TER to each licensee.

3.

+ Licensee's commitments for corrective action including May 1983 SER/TER response,'1984 minutes of meeting with NRC, and subsequent changes.

4.

+a, Licensee's list of equipment requiring environmental qualification (Master List, submitted in May 1983).

+b. Master List, version in'effect at time of inspection.

l l

'5.

+a.

Generic Letter 84-24, D.G. Eisenhut to Licensee's and Applications, j

dated December 27, 1984,

Subject:

Certification of Compliance to 10 CFR 50.49.

+b.

Licensee's response to Generic Letter 84-24.

6.

+ Licensee's current System Component Evaluation Worksheets (SCEW sheets) or equivalent (earlier SCEW sheets may-have been included.in previous l

licensee submittals).

7.

+ Licensee's procedures applicable to equipment qualification (EQ program, procurement of qualified equipment, maintenance of qualified equipment, modifications to EQ equipment, EQ personnel training (site and corporate personnel), QA/EQ interface. including corporate QA, Site QA/QC audits, EQ spare parts procurement and licensee program for EQ related NRC Information Notices / Bulletins.

8.

  • ' Licensee's qualification documentation and/or files.
  • These documents must be available for the inspectors use throughout the inspection.

+These documents are requested for review before the inspection.