Text

___ _

IO~

,(

~

./

PHILADELPHIA ELECTRIC COMPANY l

LIMERICK GENER ATING STATION P. O. BOX A SAN ATOG A, PENNSYLVANIA A 19464 December 16, 1988 Mr. Allan Howe Senior Operations Engineer U.S. Nuclear Regulatory Commission Region 1

'475 Allendale Road King Prussia, PA 19406

Dear Mr. Howe:

During the recent licensed requalification exam several concerns were identified.

The following two items are described below with the resolution:

1) During implementation of procedure T-102 there was uncertainty exhibited by operators concerning step DW/P-5 which states "Before suppression pool pressure reaches 10 psig, spray the suppression pool."

The question was whether the suppression pool sprays should be initiated if suppression pool pressure is equal to or greater than 10 psig.

To resolve this issue Trip Procedure step T-102 step DW/P-5 has.been clarified in the attached memo OPS-0675.

This memo has been distributed to all licensed operators at Limerick.

Training on this item will be incorporated in t he next requalification cycle.

2) It was observed that the operator's ability to implement T-214'and T-215 would be greatly enhanced with the addition of operator aids identifying the appropriate cabinet and equipment to be operated.

The attached memo describes those actions which have been completed to resolve this concern.

If you have any questions or concerns please do not hesitate to contact Larry Hopkins or myself.

Sincerely,

)

f'g

/

m 8902280548 881223

/1 PDR ADOCK 05000352 U

V PDC M. J. McCormick Plant Manager LAH/smk Attachments

c

~1,-

3 y

<j !;; { *'

i 1

1 LIMERICK GENERATING STATION j

' Plant Division

]

i ii Technical Section k

December 13, 1988 FROM:-

K. J. Walsh TO:

L. A. Hopkins

SUBJECT:

T-102, T-214, and T-215 Implementation Improvements The following actions have been completed to address NRC examiner concerns expressed during the exit interview of.12/5/88, regarding T-102 step'~DW/P-5, T-214, and T-215.

T-102 Bases has been revised to clarify the. term

f "Before" in the-two applicable steps (i.e. DW/P-5 and SP/T-8).

- T-214 (Manual Initiation of ARI) has been revised to designate the appropriate bays in the procedure as well as the keys necessary to open those bays.

- T-215 (de-energization of Scram Solenoids) has had lavender fuse labels applied to the C71-F14A (B) fuses in Units 1 and 2, 609 and 611 panels (RPS).

The procedure, T-215, has been revised to designate the specific bay that contains the fuses.

- The appropriate cabinet bays have been labeled.

(i.e. Bay A, Bay B, etc).

In addition to the above items when T-102 Bases was revised, the concern with SPOTMOS sensors and suppression pool level was addressed in both SP/T and SP/L (Low) branches.

K. J. Walsh Performance Engineer PBG:mbg memo 121388.4:550

n--

n

.....L v,,

7{Tfc,Ts

6-LIMERICK GENERATING STATION l

yi

' ~

Plant Division j

b L

. Operations Section OPS-0675 December 13, 1988

~

K

{'

E.

FROM:

L. A. Hopkins

~TO:

E.. Firth j.

.y

SUBJECT:

T-102. Step DW/P-5 I

-Step DW/P-5 states, "Before suppression pool pressure j

reaches 10 psig,Jspray the suppression pool."

The intent of

'the step.is to mitigate the. primary containment pressure-j y

~'-

rise.

The definition of the term, "before", is,."any. time-prior _to", which is not to be interpreted as preventing-stated action, "after".

For example; step RC/O-48 reads,:

"If not shutdown with rode, then inject SLC before suppression' pool temperature reaches 110 F."

Should s

i suppression poo1 Temperature increase to 111 F and SLC hasn't-been initiated, the operator.should still start boron l

injection.

Changes:have been initiated to remove the ambiguity of, 4

and "before", by clarifying in the bases of T-102, T-101, 1

TRIPS Bases Introduction, the intent of the term.

.f)..

l 9

Please incorporate this information in the next'

[g requalification cycle.

}

-Yb

-t 4-;

it b

L. A. Hopkins i

Assistant Superintendent -

Operations PBG/smk 4:p.