ML20235M546

From kanterella
Jump to navigation Jump to search
Forwards Corrected Amend 4 to License NPF-76,combining Units 1 & 2 Tech Specs to Add Requirement to Place Positive Displacement Pump in lock-out Condition During Modes 4,5 & 6 to Prevent Cold Overpressurization
ML20235M546
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 02/17/1989
From: Dick G
Office of Nuclear Reactor Regulation
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20235M548 List:
References
NUDOCS 8902280310
Download: ML20235M546 (5)


Text

- - - - - -

\

v, .

February 17, 1989 Docket fro.40-498 ftr. J. H. Goldberg Gcoup Vice-President, Nuclear Houston Lighting & Power Company l P.O. Box 1700 l Houston, Texas 77001 l

Dear Mr. Goldberg:

SUBJECT:

CORRECTION TO AMENDMENT N0. 4 TO FACILITY OPERATING LICENSE N0. NPF-76, SOUTH TEXAS PROJECT, UNIT 1 On December 29, 1988, the Commission issued Amendment No. 4 to Facility Operating License No. NPF-76 for the South Texas Project, Unit 1. The amendment changed the Unit 1 Technical Specifications (TS) to the Combined TS for Units 1 and 2, added a requirement which places the positive displacement pump in a lock-out condition during modes 4, 5 and 6 to prevent cold overpressurization, added a reactor coolant pump seal isolation header pressure interlock and made changes to the administrative section of the TS.

The Combined TS is' sued with the Unit 2 low power license were complete. How-ever, several TS pages with the vertical lines indicating the Unit 1 changes were inadvertently omitted from the amendment package. The pages are as follows:

2-2, 3/4 1-24, 3/4 2-4, 3/4 8-10, 3/4 8-13, 5-2 and 5-3. These pages are hereby enclosed, are identified by Amendment No. 4 and contain vertical lines indicating the areas of change. The corresponding overleaf pages, some of which were issued with Amendment No. 4, are also provided to maintain document completeness.

Please accept our apology for any inconvenience this error may have caused you.

Sincerely,

/5/

George F. Dick, Jr., Project Manager Project Directorate - IV, Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

As stated cc w/ enclosures: DISTRIBUTION:

See next page mDocket-File '

BGrimes l

NRC PDR TMeek (4)

Local PDR Wanda Jones adng Buder 8902280310 890217 PNoonan ACRS (10)

PDR ADOCK 05000498 P PDC GDick(2) GPA/PA JCalvo ARM /LFMB OGC-Rockville DHagan DOCUMENT NAME: STP LETTER 2/9 EJordan Plant File

  • PREVIOUSLY CONCURRED 1 60 PD4/LA* FD4/PE* 4/PM f PD / l PNoonan CAbbate:bj > ick A0Calvo i 02/11/89 02/13/89 02/g /89 j 02/l /89

g .

. .\

a ,

1

. Docket Pto.40-498' '

Mr. J. H. Goldberg

Group ViceePresident, Nuclear '

I

. Houston Lighting & Power Company P. O. Box 1700 Houston, Texas 77001

Dear Mr. Goldberg:

SUBJECT:

CORRECTION TO AMENDMENT NO. 4 TO FACILITY OPERATIllG LICENSE N0. NPF-76, SOUTH TEXAS PROJECT, UNIT 1 i On December 29, 1988, the Commission issued Amendment No. 4 to Facility Operating i License flo. NPF-76 for the South Texas Project, Unit 1. The amendment changed the Unit 1 Technical. Specifications (TS) to the Combined TS for Units 1 and 2,

. added a requirement which places the positive displacement pump in a lock-out condition during modes.4, 5 and 6 to prevent cold overpressurization, added a reactor coolant pump seal isolation header pressure interlock and made changes to the administrative'section of'the TS.  !

In the_ issuance, several TS pages'were inadvertently omitted from the l amendment package. The pages are as follows: 2-2, 3/4 1-24, 3/4 2-4, 3/4 }

8-10, 3/4 8-13, 5-2 and 5-3.. These pages are hereby enclosed, are identified by Amendment flo. 4 and contain vertical lines indicating the areas of change.

The corresponding overleaf pages, some of which were issued with Amendment No. 4, are also provided to maintain document completeness. 1 Please accept our apology for any inconvenience this error may have caused you.

Sincerely, i

George F. Dick, Jr., Project Manager Project Directorate - IV, Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation Enclosures. i As stated  !

cc w/ enclosures: DISTRIBUTION:

See next page Docket File BGrimes NRC PDR TMeek (4) i Local PDR Wanda Jones PD4 Reading EButcher PNoonan ACRS (10)

GDick (2) GPA/PA JCalvo ARH/LFMB OGC-Rockville DHagan EJordan Plant File DOCUMENT NAME: STP LETTER 2/9 l

PD4/PM PD4/D PD4/LQ PNoonan PD4/PEC@j CAbbate:b GDick JCalvo  ;

02/)l/89 02/0/89 02/ /89 02/ /89

r. ,
  • =

.jo#'% ,

~

! ' o -- NUCLEAR REGULATORY COMMISSION J* l wAsmwoTom,o.c. osse g f ' February 17, 1989 j- 4

' Docket No.40-498 Mr. J. H. Goldberg.

Group Vice-President Nuclear

' Houston Lighting & Power Company '

L P.O. Box 1700 -

Houston,' Texas 77001 '

Dear'Mr. Goldberg:

I

SUBJECT:

. CORRECTION T0 AMENDMENT NO. 4 TO FACILITY OPERATING LICENSE NO.-NPF-76, SOUTH TEXAS PROJECT, UNIT 1 On December 29, 1988,.the Commission issued Amendment No. 4 to Facility Operating-

. License No. NPF-76 for the South Texas Project, Unit 1. The amendment changed

, the Unit 1 Technical Specifications (TS) to the Combined TS for Units 1 and 2, added a requirement which places the positive displacement pump in a lock-out condition'during modes'4, 5 and.6.to prevent cold overpressurization, added a

-reactor coolant pump seal isolation header pressure interlock and made changes

-to the administrative,section of the TS.

The Combined TS issued with the Unit 2 low power license were complete. How-ever, several TS pages with.the vertical lines indicating the Unit I changes were inadvertently omitted from the amendment package. The pages are as follows:

2-2, 3/4 1-24, 3/4 2-4, 3/4 8-10, 3/4 8-13, 5-2 and 5-3. These'pages are hereby enclosed, are identified by Amendment No. 4 and contain vertical lines indicating the areas of change. The corresponding overleaf pages, some of which were issued with Amendment No. 4, are also provided to maintain document completeness.

Please accept our apology'for any inconvenience this error may have caused you.

Sincerely, L

Georg F. Dick, Jr#, Project Manager Project Directorate - IV, Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

As stated' cc w/ enclosures:

See next page

,t . ,

) .'.

.3 : y

  • 1 y{ . .

Mr. J. H. Goldberg : _

South Texas Project Houston Lighting and Power Company cc:

. Brian Berwick, Esq. Resident Inspector / South Texas Assistant Attorney General ; Project Environmental Protection Division c/o U.S. Nuclear Regulatory Connission P. O. Box 12548 P. O. Box 910

Capitol Station Bay City, Texas 77414 Austin, Texas 78711

-Mr. Jonathan Davis-Mr. J. T. Westermeier Assistant City Attorney General Manager, South Texas. Project City of Austin

- Houston Lighting and Power Company P. O. Box 1088~

. P. O. Box'289 .

Austin, Texas -78767

- Houston, Texas 77483 l Ms. Pat Coy .

Mr.. R. J.: Miner Citizens Concerned About Nuclear j

i

- Chief Operating Officer Power City of Austin Electric Utility 10 Singleton 1

- 721;Barton Springs Road Eureka Springs,' Arkansas 72632

' Austin, Texas. 78704 Mr. M. A. McBurnett Mr.~ R.-J. Costello Manager,' Operations Support Licensing Mr. M. T. Hardt ~ ..

Houston Lighting and Power Company City Public Service Board P. O. Box 289-P. O. Box 1771-- Wadsworth, Texas .77483 l' ' San Antonio; Texas 78296.

, .. Mr. A. Zaccaria 1

' Jack R. Newman, Esq. _

Mr. K. G. Hess Newman &:Holtzinger, P. C. Bechtel Corporation

- 1615 L Street, NW. P. O. Box 2166 Washington, D.C. 20036 Houston, Texas 77001-Melbert Schwartz, Jr., Esq. Mr. R. P. Verret

. Baker & Botts Mr. R. L. Range j One Shell Plaza Central Power and Light Company Houston, Texas 77002- P. O. Box 2121 Corpus Christi, Texas 78403 Mrs. Peggy Buchorn Executive Director .Doub, Murtzing and Glasgow Citizens for Equitable Utilities, Inc. Attorneys at Law Route 1, Box 1684 .

Suite 400. l Brazoria, Texas 77422 808 Seventeenth Street, N.W..

Washington, D.C. 20006 Mr. S. L. Rosen General Manager, Operations Support Houston Lighting and Power Company P. O. Box 289 Wadsworth, Texas 77483 1

l

], .]

i,,

Mr. J. H. Goldberg South Texas Project i Houston Lighting & Power i J

CC:-

Regional Administrator, Region IV  !

U.S. Nuclear Regulatory Comission

. j Office of Executive Director  !

for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 q

Mr. Lanny Sinkin,  ;

Counsel for Intervenor:

L Citizens Concerned about Nuclear Power, Inc.

Christic Institute 1324 North Capitol Street- ,

Washington, D.C. 20002 Licensing Representative Houston Lighting and Power Company e Suite 610  !

Three Metro Center Bethesda,Mariland'20814 Rufus S. Scott  !

Associate General Counsel Houston Lighting & Power Company' P. O. Box 1700 Houston, Texas 77001 INPO Records Center 1100 Circle 75 Parkway Atlanta, Georgia 30339-3064 Joseph M. Hendrie

.50 Be11 port Lane Bellport,-New York 11713 Gerald E. Vaughn, Vice President t Nuclear Operations  :

Houston' Lighting & Power Company l P. O. Box 289 i Wadsworth, Texas 77483 R. W. Chewning, Chairman Nuclear Safety Review Board Houston Lighting & Power Company P. O. Box 289 -

Wadsworth, Texas 77483 k

1 J