Text
_
c
~
SAFEGUARDS INFORMATION JUL131987 i
Tennessee Valley Authority f
ATTN:
Mr. S. A. White Manager of Nuclear Power I
6N.38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- DOCKET NOS. 50-327 AND 5'-328 u
1 This. letter refers to the management meeting on Sequoyah control room barrier l
issues conducted in the Region II Office on. June-1,~1987.
' Enclosed are the list of attendees, meeting summaries, and TVA chronology slides. During this meeting TVA committed to investigating the circumstances During this meeting, TVA committed to investigating the circumstances.regarding the removal of a control room barrier.
The NRC committed to review whether compensatory measures are needed in Mode 5 and whether compensatory measures are acceptable for start up.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities'and security measures are exempt from public disclosure; therefore, Enclosures 3 and 4 which present an exempt-summary, will not be placed in the NRC Public Document Room.
j Should you have any questions concerning this letter, please contact us.
j Sincerely, Gary' G. Zech, Assistant Director, 8707170221'B70713 El Inspection Programs PDR ADOCK 05000327 Division of TVA Projects F
PDR Office of Special Projects
Enclosures:
1.
List of Attendees 2.
Summary of Meeting 3.
TVA Chronology Slides (Safeguards) j 4.
Meeting Summary (Safeguards)
)
cc w/enci H. L. Abercrombie, Site Director Sequoyah Nuclear Plant J. A. Kirkebo, Director,
-Nuclear Engineering R. L. Gridley, Director
' Nuclear Safety and Licensing M. R. Harding, Site Licensing II'Ci>0EUM c0Nr##'O '
- ^FEGUAr.na gyIOD4?ICr Manager UPON Stpg s' AFEGUARDS INFORMATl0N """"=M
(*** "*** *)
%oL tlr m
SAFEGUARDS lNFORNIATION Tennessee Valley Authority 3
JUL 131987 1
bcc w/encls 1 & 2:
l J. G. Keppler, OSP S. D. Ebneter, OSP l
J. A. Zwolinski, OSP j
B. D. Liaw, OSP S. D. Richardson, OSP j
S. R. Connelly, CIA
)
K P. Barr, OSP/RII l
NRC Resident Inspector j
NRC Document Control Desk State of Tennessee i
l I
E RII/OSP RII RII/OSP II/OS
,g 6 M
p ructosuare 7/9 /8 y / KBa r JBrady:tj D Guire oy SArtcUARos
- ING U P o n s t p s y,; ? % i r c,
7/l /87 7/(p/87 7/
7 IOM MS.
PAggggg COk p ' ' '
' FEGUARDS INFORMATION L
s sJ l
l l
ENCLOSURE 1 LIST OF ATTENDEES
.N R_C.
j G. G. Zech, Assistant Director, Division of TVA Projects (DTVAP), Office of Special Projects (0SP)
K. P. Barr, Deputy Assistant Director, DTVAP, OSP l
W. E. Cline, Chief, Safeguards Branch, Division of Radiation Safety and Safeguards (DRSS), RII F. R. McCoy, Chief, Sequoyah Section DTVAP, OSP E. W. McPeek, Reactor Security Specialist, Safeguards Branch, NRR C. D. Perny, Security Inspector DRSS, RII W. J. Tobin, Senior Security Inspector, DRSS, RII D. P. Loveless, Resident _ Inspector, DTVAP, OSP J. B. Brady, Project Engineer, DTVAP, OSP l
T1A H. L. Abercrombie, Sequoyah Site Director M. R. Harding, Sequoyah Licensing Group Manager W. Gillison, Chief, Nuclear Security Branch, Chattanooga H. J. Sefick, NSB, Chattanooga J. DeGregory, NSB, Chattanooga R. S. Kaplan, Sequoyah Security Manager D. Level, Division of Nuclear Safety and Licensing,. Chattanooga j
L. G. Turkey, Jr., Sequoyah Site Security D. P. Ormsby, Sequoyah Licensing Engineer l
i l
1 i
i i
..s L.
I
'~
.a l
ENCLOSURE 2 l
SUMMARY
OF MEETING A management meeting. was held at the Region II Office on June 1,1987, at 11:00 a.m., to discuss control room barrier issues. TVA presented a chronology j
of the issue since 1983. In a July 1985 TVA QA Audit, a concern with control room interpretation was identified.
A difference of opinion existed between QA and the site pertaining to this issue.
The issue was escalated to the Sequoyah site director who, in May of 1986, directed moc fication of the j
barrier (DCR 2268 was written).
TVA reviewed and committed to DCR-2268 as a Unit 2 startup item in March 1987. The Site Director, after review of the package, ordered a review of the alternatives because of the extensive amount q
of work involved with the proposed package. After discussions with the NRC on 1
the options, TVA committed to making appropriate alterations.
Because of l
material delivery problems, TVA is now skeptical about their ability to complete the modifications prior to the scheduled Unit 2 startup.
l q
The issue of compensatory measures was discussed. TVA believed that they were
(
in agreement with the NRC in that compensatory measures would not be required while in Mode 5; however, they would be required in Mode 4 until the modifica-tions were completed.
The NRC is not in full agreement and committed to an immediate review of the issue followed by notification to the Sequoyah Site Director of the results.
i The licensee acknowledged that a barrier had been removed from the control room wall, and committed to a review of the circumstances of this removal and i
to notify Region II of the results of its investigation.