ML20235M119

From kanterella
Jump to navigation Jump to search
Responds to Re Declining Performance at Plant. NRC Has Increased Overall Insp Effort Planned,Including Special Team Insp on 890227-0331.Util Has Committed to Submit Corrective Action Plan to NRC
ML20235M119
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/21/1989
From: Lainas G
Office of Nuclear Reactor Regulation
To: Middleton T
CHARLES COUNTY, MD
Shared Package
ML20235M121 List:
References
NUDOCS 8902280126
Download: ML20235M119 (3)


Text

.-

/

O O Docket Nos. 50-317 FEB 211989 DISTRIBUTION and 50-318 ' Docket file- NRC PDR VStello Local'PDR" ED0#4240 JTaylor EDO Rdg PDI-1 Rdg HThompson TMurley/JSniezek JBlaha SVarga Glainas WRussell, RI RCapra SMcNeil JLieberman CVogan LTripp, RI OGC GPA/CA SECY VStello i Mr. Thomas Mac Middleton, President DMossburg,(ED0#4240) i County Commissioners of Charles County VReid (GT File) FMiraglia Post Office Box B MMiller, RI FGillespie La Plata, Maryland 20646 DCrutchfield

Dear Mr. Middleton:

I am resporiding to the letter from you dated January 17, 1989, about your concerns regarding the Calvert Cliffs Nuclear Power Plant. The NRC also i recognizes the declining performance at Calvert Cliffs. Consequently, the NRC is significantly increasing its overall inspection effort planned for this facility. The increased inspection effort includes a special team inspection to provide an independent evaluation of performance and operational safety at Calvert Cliffs which will be conducted onsite during the period of February 27 - March 31, 1989.

In addition, as a consequence of being identified as warranting increased NRC attention, the Baltimore Gas and Electric Company (BG&E) has committed to submitting a corrective action plan to the NRC. In developing this plan, BG&E is attempting to identify the root causes of its declining performance and to determine specific actions that CG&E could take to improve its performance. The NRC will review and evaluate this corrective action plan when it is submitted.

The EG&E corrective action plan and the results of the special team inspectbn, as well as the results of all other NRC inspections at Calvert Cliffs, will be available to the public at the Local Public Document Room in the Calvert County Library, Prince Frederick, Maryland, or copies can be obtained from the Commission's Public Document Room, 2120 L Street, N.W.,

Washington, DC.

Furthermore, since 1976 the NRC has had in place a State Liaison Officer (SLO) program. In this program, each State's Governor appoints an SLO to be the State's point of contact with the NRC. On matters concerning plant events and before any public announcements, the NRC SLO will inform the State SLO of the concern or issue involved.

I i pDR2mo1u m 221 9 l p ADock c5000317 I PDC

f1 l

l Mr. Thomas Mac Middleton If you have any specific questions or concerns regarding Calvert Cliffs, please feel free to contact the NRC Region I State Liaison Officer, Ms. Marie Miller, at (215) 337-5246. In addition, for your information, the Maryland State Liaison Officer is Mr. Thomas Andrews, Deputy Secretary, Department of Environment, (301) 631-3086.

I hope that this information is responsive to your concerns regarding the operational performance at Calvert Cliffs and the notification of the State about plant concerns and events.

Sincerely, ORIGINAL SIGNED BY Gus C. Lainas, Acting Director Division of Reactor Projects I/II Office of Nuclear Reactor Regulation ec: M. Levy N. Sefton j

[GT 4240]

  • SEE PREVIOUS CONCURRENCE

,. n OFC :PDI-1*  :* TECH ED :PDI-1 PDI-l ADR Nf  :(A :DRP  :

...__:___________.:....._______:_. __ M _ :: .....S W___: :___ #1_/ ____:.. ________:___________

NAME :CVogan  : :SMcNeil:vr :RCapra :BB ger :GL s  :

.....:....________:____.....___:__________..:____________:_._________:.__7._____.:___....____

DATE :2/16/89 :2/15/89 :2/en/89 :2/en/89 :24f/89 :2/L /89  : j 0FFICIAL RECORD COPY l

t I

7 l

Q Cic '

,j UNITED STATES l

9f

- NUCLEAR REGULATORY COMMISSION

,; g '

.E f .

WASHINGTON, D. C. 20555 .y @. ,

-%, 8 .EDO Principal Correspondence Control n

I

1. t FROM: DUE: 02/22/89 EDO CONTROL: 0004240 DOC DT:'01/17/89 FINAL REPLY:

. THOMAS MAC MIDDLETON, MURRAY D. LEVY AND NANCY J.

SEFTON , CHARLES COUNTY, MD COMMISSIONERS

'TO:

=NRC FOR SIGNATURE OF:. ** GRN ** ,

CRC NO: '

MURLEY' ,

- DESC: ROUTING:

EXPRESSES CONCERNS RE OPERATION OF CALVERT CLIFFS STELLO PLANT TAYLOR ,

THOMPSON DATE: 02/06/89 BLAHA ,

RUSSELL,RI l ASSIGNED TO: CONTACT: LIEBERMAN, OE NRR MURLEY ,

SPECIAL INSTRUCTIONS OR REMARKS:

NRR RECEIVED: FEB. 7, 1989 ACTION: r,DRPR:LAINAST

~ v. rn

.NRR. ROUTING:' MURLEY/SNIEZEK YARGA MIRAGLIA

CRUTCHFIELD GILLESPIE M0SSBURG ACTION DUE TO NRR DIRECTOR'S OmCE BY dn ?cJ

- _ /.. . 4 t_. i

' /

_ _ _ _ _ _ _ _ _ -