Text
-
g ',
lls
.l-u q
uke Pbwer Company ;
. gg g_ y,'
' PO Box 33198 j,',,Pr" y
y... charlotte, Nc 2824z or duction '
- (704)373-4531 R
- s
' DUKEPOWER
-February 1, 1989-n i-U. S., Nuclear Regulatory Commission
. Washington,LD. C.
.20555 L
Attention: Document Control Desk i
b-
Subject:
Catawba Nuclear Station, Unit 1
' Docket No. 50-413-NRC Bulletin No. 88-11 Pressu'rizer Surge Line Thermal Stratification:
t.
'Gentiemen;-
' Pursuant;.to the requirements of NRC Bulletin No.~88-11, Pressurizer Surge.
Line Thermal Stratification, the Catawba Nuclear Station Unit 11 Pressurizer
- Surge Line was Linspected.during.the. end of cycle 3. refueling outage in _
January 1989. This-inspection' included a visual: examination. of pipe welds,
- exterior;pipeJsurfaces, rupture' restraints, and.all associated pipe supports. The' exterior pipe surface was carefully examined at' each rupture
- restraint location to detect any contact. No damage to the Pressurizer Surge LLine was discovered. The only problem noted was a strut to clamp axis.
misalignment!of l' degree in: excess of_the allowable tolerance at one support
~
restrainti The strut to clamp axis alignment was corrected. The cause'of the misalignment could not.be' determined. The affected support restraint will be reinspected during the Catawba Unit i end of cycle 4 refueling outage in March 1990.
Very truly yours, LH. B. Tucker y.
JGT/01/BU' L88-11.
xc: Mr. M. L. Ernst"
-Acting Regional Administrator, Region 11-U. S. Nuclear Regulatory Commission 101_Marietta:St., NW, Suite 2900
' Atlanta,-- GA. 30323
[60
.Mr. W. T. Orders NRC~ Resident Inspector Catawba Nuclear Station.
l 8902280105 890201 1