ML20235M017
| ML20235M017 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 07/13/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20235M021 | List: |
| References | |
| NUDOCS 8707170024 | |
| Download: ML20235M017 (2) | |
See also: IR 05000267/1987014
Text
i
t
Q
JUL 131987
1
(
In Reply Refer To:
Docket:
50-267/87-14
Public Service Company of Colorado
ATTN:
Robert 0. Williams, Jr.
Vice President, Nuclear
Operations
P. O. Box 840
Denver, Colorado
80201
l
Gentlemen:
i
l
This refers to the inspection conducted by Messrs R. E. Farrell and
P. W. Michaud of this office during the period June 1-30, 1987 of activities
'
authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear
Generating Station, and to the discussion of our findings with you and other
!
I
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
followup on previous inspection findings, design control, followup of plant
trip, maintenance, and surveillance. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors. The
inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
]
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Criginal Fir;r:ed 27
J. F. Jandon
b
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report
50-267/87-14
SRI JVa h
RI ,%sg
C:RPB/Af0f/g
P
n
REFarrelkcjg PWMichau
JPJaudon
(gJGa
iardo
,
l
')/aJ/87
)/If/87
?/t]/87
1Yy87
N
/<yi
I
8707170004 Dh>b67
ADOCK O
pop
G
__- _______-__-___ _ -_ _
-
t
4
l
Public Service Company of Colorado
-2-
I
l
cc w/ enclosure:
)
Manager, Nuclear
1
Production Division
-Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
Pletteville, Colorado
80651
bec to DMB (IE01)
bec distrib by RIV:
- RPB
R. D. Hartin, RA
- RRI
DRSP
- Section Chief (RPB/A)
- RIV File
j
- Section Chief (RSB/ES)
- R&SPB
i
- RSTS OPERATOR
- MIS System
2
- RSB
- Project Inspector
- D. Weiss, RM/ALF
- R. Hall
- w/766
l
1
l
i
-- _ _ _ - _ - - - _ . _ . - _ - - . - - . _ - - _